(720) 287-7958

DESIGN · BUILD · AUTOMATE

WHEAT RIDGE SERVICES

Wheat Ridge ADU / backyard cottage — local feasibility & estimate

ADU Feasibility Consultation, $350

Compare both studies

Exploring a backyard ADU in Wheat Ridge? Autotelic helps assess feasibility against lot, setbacks, HOA, and local rules—then provides a clear estimate and build path with one team. No fake zoning envelopes. No invented prices or license claims.

What Wheat Ridge requires

Front setback: 30 ft. (c) Wheat Ridge Code of Ordinances, Chapter 26 §26-205 (R-1 dimensional standards) — effective 2025-01-27

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
ADU / Backyard Cottage

Build an income-producing unit in your backyard

Book an ADU feasibility study

Two fixed-price studies, booked online before you pay for design: a site visit with a go/no-go read on your lot, or a written report you can take to a lender.

Pay when you book. We confirm within 24 hours or refund you in full.

  • ADU Feasibility Consultation

    An on-site review of your lot against local ADU zoning, setbacks, and utility access.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    An on-site review of your lot against local ADU zoning, setbacks, and utility access. You get a verbal go/no-go read plus a one-page summary of constraints and next steps.

  • ADU Feasibility Package

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget.

    $475 deposit to book, the rest when the work is done · morning (8–12) or afternoon (12–4)

    What's included

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget. A documented go/no-go you can take to a lender.

Studies for additions, custom homes and commercial space

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

ADU / Backyard Cottage Services in Wheat Ridge, Colorado

Autotelic provides professional ADU / backyard cottage services throughout Wheat Ridge and the surrounding Jefferson County area. Accessory dwelling unit construction across the Denver metro — detached new builds, garage conversions, and basement conversions compliant with Colorado HB 24-1152. One veteran-owned design-build team runs the full Denver sequence under a single contract: zoning verification and concept design, municipal zoning and building permit reviews, then construction and inspections through certificate of occupancy. Whether you're in Wheat Ridge (central Jefferson County) or nearby communities, our team delivers quality workmanship, licensed and insured.

What the code allows

What the code allows in Wheat Ridge — R-1 example

Front setback
30 ft. (c)Wheat Ridge Code of Ordinances, Chapter 26 §26-205 (R-1 dimensional standards) — effective 2025-01-27
Side setback
15 ft.Wheat Ridge Code of Ordinances, Chapter 26 §26-205 (R-1 dimensional standards) — effective 2025-01-27
Rear setback
15 ft.Wheat Ridge Code of Ordinances, Chapter 26 §26-205 (R-1 dimensional standards) — effective 2025-01-27
Principal building height
35 ft.Wheat Ridge Code of Ordinances, Chapter 26 §26-205 (R-1 dimensional standards) — effective 2025-01-27
Lot coverage
25%Wheat Ridge Code of Ordinances, Chapter 26 §26-205 (R-1 dimensional standards) — effective 2025-01-27
ADU allowed, max size, and max height
Not in our sourced tables for this municipality — we confirm with the city.
Wheat Ridge Code of Ordinances, Chapter 26 §26-205 (R-1 dimensional standards) — effective 2025-01-27 · confidence high

Illustrative only — not a code determination or permit approval. Setbacks and principal height are from the municipal dimensional table; ADU-specific standards are not in our sourced tables for this municipality — run your own address.

A recent build

Backyard ADU in Denver

Denver · 2026

Status
Under construction — 2026
Managed on
Buildbot — Autotelic’s own PM platform
  • Architecture, site plans, and full MEP design completed in-house
  • Permits pulled — electric and plumbing rough-ins permitted and underway
  • Spray-foam insulation and exterior work in progress
  • First project managed end-to-end on Buildbot, Autotelic’s construction-PM platform

A ground-up backyard ADU in Denver — designed, permitted, and now under construction by Autotelic, and the first project managed end-to-end on Buildbot, Autotelic’s own construction-management platform.

Permit Thresholds

Wheat Ridge permit thresholds

Code reference
Retaining walls over 4' high (or supporting a surcharge) and other structural elements like decks or room additions explicitly require permits; any structural work in a remodel would qualify as an alteration requiring a permit.
Code reference
These requirements are enforced under the City of Wheat Ridge Municipal Code, Chapter 5, Article II, Division 2 (Building Permits).
Use tax
Per City Code Section 22-68, use tax is charged at 3.5% of 60% of the project valuation (60% of valuation is assumed to be materials subject to tax).§22-68
Code reference
Permit fees are based on the higher of the applicant’s valuation or the building official’s minimum (using ICC Building Valuation Data); a separate plan review fee (65% of the permit fee) applies where required.

Codes are amended regularly — verify current requirements with **City of Wheat Ridge Building Division (City of Wheat Ridge, Colorado) issues residential building permits.

Energy Code

Wheat Ridge energy code quick facts

Code reference
2024 IECC (with Colorado Model Low Energy and Carbon Code, 2025 edition, and Colorado Model Electric Ready and Solar Ready Code), adopted by reference with primarily administrative/local amendments (no technical energy amendments noted).
Code reference
This replaces the prior 2018 I-Codes.
Code reference
City Council approved on October 27, 2025 (Ordinance 1883); the 2024 codes (including 2024 IECC, excluding Chapter 1 but retaining Sections C102, R102, C107, and R107) apply to all new permit applications beginning January 1, 2026.Ord. 1883
Code reference
Wheat Ridge is in Climate Zone 5B.
Code reference
Requirements for remodels/additions generally follow the 2024 IECC (and Colorado model code) provisions applicable to existing buildings (often via IEBC cross-references or specific existing-building sections), with no local technical amendments identified that alter prescriptive values.
Code reference
Specific numeric prescriptive requirements (e.g., R-values, U-factors, air-sealing thresholds) are those in the base 2024 IECC/Colorado model code for CZ 5B; local adoption does not modify them.
Permit-related tax/fee (construction use tax)
Use tax of 3.5% applied to 60% of the project valuation (separate from and in addition to the building permit fee, which is calculated via a tiered schedule based on valuation).
Code reference
Adopting references include Chapter 5 of the Wheat Ridge Municipal Code (incorporating the listed codes by reference) and Ordinance 1883.Ord. 1883

Codes are amended regularly — verify current requirements with **City of Wheat Ridge Building Division (City of Wheat Ridge, Colorado) issues residential building permits.

Zoning & Dimensional Standards

Setback & dimensional standards in Wheat Ridge

Zone-district dimensional standards for Wheat Ridge, quoted verbatim from the Wheat Ridge Code of Ordinances (Ch.26 Zoning). Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

A-1setback & dimensional standards
StandardRequirement
Front Setback (min)30' (c)
Side Setback (min)15'
Rear Setback (min)15' (g)
Building Coverage (max)25%
Building Height (max)35'
Lot Area (min)1 acre
Lot Width (min)140'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) A-1 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

A-2setback & dimensional standards
StandardRequirement
Front Setback (min)30' (c)
Side Setback (min)15'
Rear Setback (min)15' (g)
Building Coverage (max)25%
Building Height (max)35'
Lot Area (min)1 acre
Lot Width (min)140'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) A-2 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-1setback & dimensional standards
StandardRequirement
Front Setback (min)30' (c)
Side Setback (min)15'
Rear Setback (min)15'
Building Coverage (max)25%
Building Height (max)35'
Lot Area (min)12,500 sf
Lot Width (min)100'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-1 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-1Asetback & dimensional standards
StandardRequirement
Front Setback (min)25' (c)
Side Setback (min)10'
Rear Setback (min)15' (h)
Building Coverage (max)30%
Building Height (max)35'
Lot Area (min)9,000 sf
Lot Width (min)75'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-1A setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-1Bsetback & dimensional standards
StandardRequirement
Front Setback (min)25' (d)
Side Setback (min)5' (e)
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)7,500 sf
Lot Width (min)60'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-1B setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-1Csetback & dimensional standards
StandardRequirement
Front Setback (min)20' (d)
Side Setback (min)5'
Rear Setback (min)5'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)5,000 sf
Lot Width (min)50'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-1C setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-2setback & dimensional standards
StandardRequirement
Front Setback (min)25' (d)
Side Setback (min)5' (e)
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)9,000 sf
Lot Width (min)75'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-2 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-2Asetback & dimensional standards
StandardRequirement
Front Setback (min)25' (d)
Side Setback (min)5' (d)
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)7,500 sf
Lot Width (min)60'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-2A setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-3setback & dimensional standards
StandardRequirement
Front Setback (min)25' (e)
Side Setback (min)5'
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)7,500 sf
Lot Width (min)60'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-3 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-3Asetback & dimensional standards
StandardRequirement
Front Setback (min)25' (e)
Side Setback (min)5'
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)7,500 sf
Lot Width (min)60'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-3A setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

Service Area

Serving Wheat Ridge and Jefferson County

We serve Wheat Ridge, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Wheat Ridge project.

FAQ

ADU feasibility FAQ

How much does ADU Feasibility Consultation cost in Wheat Ridge?

$350.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Can I build an ADU on my lot?

It depends on lot size, setbacks, HOA rules, and Wheat Ridge’s code. Autotelic helps assess feasibility—we do not invent zoning envelopes or guarantee permit outcomes.

Is the online sizing tool a permit determination?

No. Lot-aware sizing on /adu/ is illustrative only and is not a permit determination. A clear estimate and local review come next.

What happens after I start an estimate?

You move from feasibility into a clear estimate with the same design-build team, then permit coordination and build with a licensed Denver-metro crew when you proceed.

How long does an ADU project take?

First we check your lot and agree on the scope. Then come design and drawings, city permit review, and construction with inspections. Your lot, utility connections, design changes and the city’s review schedule affect the timing. Your proposal includes a project-specific schedule before you commit to the build. A consultation booking is the first planning conversation, not a construction start date.

Who builds the ADU?

Autotelic’s local design-build team takes your project from the first concept through an estimate, permits and construction. You have one team to talk to along the way.

How much does an ADU cost in Wheat Ridge?

We don't put a single number here on purpose — the honest answer depends on your lot, the utility runs and the finish level. Our Instant Estimate reads the same published tier ranges we quote from and narrows them to your project in about two minutes: https://autotelic.build/estimate?trade=adu-backyard-cottage. It is an estimate, not a quote; after feasibility the build is quoted as a fixed-price proposal, so you know the number before work starts.

Garage conversion or detached backyard cottage?

Each has different zoning, cost, and site implications. We design all three and recommend based on your lot, budget, and how you plan to use the unit.

Should I build for a rental or for family?

The code limits on this page apply to the building no matter who lives in it — what changes is the layout and the specification. Our Premium tier is written as a rental-ready one-bedroom (complete kitchen, laundry, private entrance); family and multigenerational use more often points to a Studio ADU or a lofted Signature plan. Run the lot check for the size you are allowed, then the estimate for the tier price.

What are the drawbacks — permits, timeline, neighbors?

Two municipal reviews run in order: a zoning review confirming the unit fits your district’s standards, then a building permit review of the construction documents, with inspections during the build and a certificate of occupancy at the end. We manage zoning review, the permit application and every inspection through certificate of occupancy.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY