autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

WHEAT RIDGE SERVICES

ADU / Backyard Cottage in Wheat Ridge

Licensed ADU / backyard cottage services for Wheat Ridge and Jefferson County. Build an income-producing unit in your backyard.

What Wheat Ridge requires

Front setback: 30 ft. (c) Wheat Ridge Code of Ordinances, Chapter 26 §26-205 (R-1 dimensional standards) — effective 2025-01-27

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
ADU / Backyard Cottage

Build an income-producing unit in your backyard

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

ADU / Backyard Cottage Services in Wheat Ridge, Colorado

Autotelic provides professional ADU / backyard cottage services throughout Wheat Ridge and the surrounding Jefferson County area. Accessory dwelling unit construction across the Denver metro — detached new builds, garage conversions, and basement conversions compliant with Colorado HB 24-1152. One veteran-owned design-build team runs the full Denver sequence under a single contract: zoning verification and concept design, municipal zoning and building permit reviews, then construction and inspections through certificate of occupancy. Whether you're in Wheat Ridge (central Jefferson County) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

What the code allows

What the code allows in Wheat Ridge — R-1 example

Front setback
30 ft. (c)Wheat Ridge Code of Ordinances, Chapter 26 §26-205 (R-1 dimensional standards) — effective 2025-01-27
Side setback
15 ft.Wheat Ridge Code of Ordinances, Chapter 26 §26-205 (R-1 dimensional standards) — effective 2025-01-27
Rear setback
15 ft.Wheat Ridge Code of Ordinances, Chapter 26 §26-205 (R-1 dimensional standards) — effective 2025-01-27
Principal building height
35 ft.Wheat Ridge Code of Ordinances, Chapter 26 §26-205 (R-1 dimensional standards) — effective 2025-01-27
Lot coverage
25%Wheat Ridge Code of Ordinances, Chapter 26 §26-205 (R-1 dimensional standards) — effective 2025-01-27
ADU allowed, max size, and max height
Not in our sourced tables for this municipality — we confirm with the city.
Wheat Ridge Code of Ordinances, Chapter 26 §26-205 (R-1 dimensional standards) — effective 2025-01-27 · confidence high

Illustrative only — not a code determination or permit approval. Setbacks and principal height are from the municipal dimensional table; ADU-specific standards are not in our sourced tables for this municipality — run your own address.

A recent build

Backyard ADU in Denver

Denver · 2026

Status
Under construction — 2026
Managed on
Buildbot — Autotelic’s own PM platform
  • Architecture, site plans, and full MEP design completed in-house
  • Permits pulled — electric and plumbing rough-ins permitted and underway
  • Spray-foam insulation and exterior work in progress
  • First project managed end-to-end on Buildbot, Autotelic’s construction-PM platform

A ground-up backyard ADU in Denver — designed, permitted, and now under construction by Autotelic, and the first project managed end-to-end on Buildbot, Autotelic’s own construction-management platform.

Permit Thresholds

Wheat Ridge permit thresholds

Code reference
Retaining walls over 4' high (or supporting a surcharge) and other structural elements like decks or room additions explicitly require permits; any structural work in a remodel would qualify as an alteration requiring a permit.
Code reference
These requirements are enforced under the City of Wheat Ridge Municipal Code, Chapter 5, Article II, Division 2 (Building Permits).
Use tax
Per City Code Section 22-68, use tax is charged at 3.5% of 60% of the project valuation (60% of valuation is assumed to be materials subject to tax).§22-68
Code reference
Permit fees are based on the higher of the applicant’s valuation or the building official’s minimum (using ICC Building Valuation Data); a separate plan review fee (65% of the permit fee) applies where required.

Codes are amended regularly — verify current requirements with **City of Wheat Ridge Building Division (City of Wheat Ridge, Colorado) issues residential building permits.

Energy Code

Wheat Ridge energy code quick facts

Code reference
2024 IECC (with Colorado Model Low Energy and Carbon Code, 2025 edition, and Colorado Model Electric Ready and Solar Ready Code), adopted by reference with primarily administrative/local amendments (no technical energy amendments noted).
Code reference
This replaces the prior 2018 I-Codes.
Code reference
City Council approved on October 27, 2025 (Ordinance 1883); the 2024 codes (including 2024 IECC, excluding Chapter 1 but retaining Sections C102, R102, C107, and R107) apply to all new permit applications beginning January 1, 2026.Ord. 1883
Code reference
Wheat Ridge is in Climate Zone 5B.
Code reference
Requirements for remodels/additions generally follow the 2024 IECC (and Colorado model code) provisions applicable to existing buildings (often via IEBC cross-references or specific existing-building sections), with no local technical amendments identified that alter prescriptive values.
Code reference
Specific numeric prescriptive requirements (e.g., R-values, U-factors, air-sealing thresholds) are those in the base 2024 IECC/Colorado model code for CZ 5B; local adoption does not modify them.
Permit-related tax/fee (construction use tax)
Use tax of 3.5% applied to 60% of the project valuation (separate from and in addition to the building permit fee, which is calculated via a tiered schedule based on valuation).
Code reference
Adopting references include Chapter 5 of the Wheat Ridge Municipal Code (incorporating the listed codes by reference) and Ordinance 1883.Ord. 1883

Codes are amended regularly — verify current requirements with **City of Wheat Ridge Building Division (City of Wheat Ridge, Colorado) issues residential building permits.

Zoning & Dimensional Standards

Setback & dimensional standards in Wheat Ridge

Zone-district dimensional standards for Wheat Ridge, quoted verbatim from the Wheat Ridge Code of Ordinances (Ch.26 Zoning). Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

A-1setback & dimensional standards
StandardRequirement
Front Setback (min)30' (c)
Side Setback (min)15'
Rear Setback (min)15' (g)
Building Coverage (max)25%
Building Height (max)35'
Lot Area (min)1 acre
Lot Width (min)140'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) A-1 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

A-2setback & dimensional standards
StandardRequirement
Front Setback (min)30' (c)
Side Setback (min)15'
Rear Setback (min)15' (g)
Building Coverage (max)25%
Building Height (max)35'
Lot Area (min)1 acre
Lot Width (min)140'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) A-2 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-1setback & dimensional standards
StandardRequirement
Front Setback (min)30' (c)
Side Setback (min)15'
Rear Setback (min)15'
Building Coverage (max)25%
Building Height (max)35'
Lot Area (min)12,500 sf
Lot Width (min)100'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-1 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-1Asetback & dimensional standards
StandardRequirement
Front Setback (min)25' (c)
Side Setback (min)10'
Rear Setback (min)15' (h)
Building Coverage (max)30%
Building Height (max)35'
Lot Area (min)9,000 sf
Lot Width (min)75'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-1A setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-1Bsetback & dimensional standards
StandardRequirement
Front Setback (min)25' (d)
Side Setback (min)5' (e)
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)7,500 sf
Lot Width (min)60'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-1B setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-1Csetback & dimensional standards
StandardRequirement
Front Setback (min)20' (d)
Side Setback (min)5'
Rear Setback (min)5'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)5,000 sf
Lot Width (min)50'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-1C setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-2setback & dimensional standards
StandardRequirement
Front Setback (min)25' (d)
Side Setback (min)5' (e)
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)9,000 sf
Lot Width (min)75'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-2 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-2Asetback & dimensional standards
StandardRequirement
Front Setback (min)25' (d)
Side Setback (min)5' (d)
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)7,500 sf
Lot Width (min)60'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-2A setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-3setback & dimensional standards
StandardRequirement
Front Setback (min)25' (e)
Side Setback (min)5'
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)7,500 sf
Lot Width (min)60'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-3 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-3Asetback & dimensional standards
StandardRequirement
Front Setback (min)25' (e)
Side Setback (min)5'
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)7,500 sf
Lot Width (min)60'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-3A setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What this covers

Detached or attached accessory dwelling on a Denver lot: foundation or module, envelope, and utility tie-in. Height and massing follow Denver bulk-plane and ADU rules for the zone; confirm with CPD before drawings freeze.

text

How the work is coordinated

A municipally licensed Denver general contractor coordinates licensed specialty trades for electrical and plumbing. Denver-metro work is permitted locally. Colorado has no statewide general-contractor license. Cities and counties license general contractors. DORA licenses electrical and plumbing (and similar regulated trades), not general contractors. Autotelic is a municipally licensed Denver general contractor that coordinates licensed specialty trades. Denver building permits run through Community Planning and Development (CPD). Costs are project-specific; no dollar figures.

Service Area

Serving Wheat Ridge and Jefferson County

We serve Wheat Ridge, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Wheat Ridge project.

FAQ

Common questions

How much does an ADU cost in Denver?

We don't put a single number here on purpose — the honest answer depends on your lot, the utility runs and the finish level. Our Instant Estimate reads the same published tier ranges we quote from and narrows them to your project in about two minutes: https://autotelic.build/estimate?trade=adu-backyard-cottage. It is an estimate, not a quote; after feasibility the build is quoted as a fixed-price proposal, so you know the number before work starts.

Garage conversion or detached backyard cottage?

Each has different zoning, cost, and site implications. We design all three and recommend based on your lot, budget, and how you plan to use the unit.

Should I build for a rental or for family?

The code limits on this page apply to the building no matter who lives in it — what changes is the layout and the specification. Our Premium tier is written as a rental-ready one-bedroom (complete kitchen, laundry, private entrance); family and multigenerational use more often points to a Studio ADU or a lofted Signature plan. Run the lot check for the size you are allowed, then the estimate for the tier price.

What are the drawbacks — permits, timeline, neighbors?

Two municipal reviews run in order: a zoning review confirming the unit fits your district’s standards, then a building permit review of the construction documents, with inspections during the build and a certificate of occupancy at the end. We manage zoning review, the permit application and every inspection through certificate of occupancy.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Let's design your perfect ADU / Backyard Cottage together

Get a personalized estimate in about 2 minutes — no pressure, no obligation.

Licensed & Insured ContractorVeteran-Owned

How This Works (2 minutes)

  1. 1Tell us about your project (30 seconds)
  2. 2Answer a few quick questions for an accurate estimate (60 seconds)
  3. 3Get your personalized estimate instantly (30 seconds)

No pressure. No obligation. No spam calls. If we're not the right fit, we'll tell you — and even recommend someone who is.