autotelic.build

DESIGN · BUILD · AUTOMATE

TRADE SERVICES

Second-Story Additions for Denver Homes

Full second-story additions across the Denver metro with structural engineering, framing, roofing, and complete interior build-out. Commercially licensed and insured.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Second-Story Addition

Double your living space without moving

text

What a second-story addition covers

A second-story addition in the Denver metro adds habitable floor over an existing house: new floor structure, stairs, roof, windows, and usually electrical, mechanical, and plumbing. The existing foundation and walls have to carry the extra load. A municipally licensed Denver general contractor coordinates the project, design professionals, and licensed specialty trades. Cost is project-specific and depends on structure, roof, and how much of the first floor is opened.

text

Structure and zoning height

City and County of Denver Community Planning and Development treats second-story additions as structural review items that exceed IRC prescriptive limits. The residential permitting guide asks for a letter of structural integrity sealed by a design professional who personally inspected the existing foundation and building (DBCA 133.3). Zoning height is measured in feet and stories from the front and rear base planes (Denver Zoning Code Sec. 13.1.2). Plans should show allowed versus proposed height.

text

Permits and who coordinates the work

Additions typically need zoning, building, and Sewer Use and Drainage (SUDP) reviews, plus electrical, mechanical, and plumbing when those systems change. Denver Energy Code Chapter 5 [RE] applies to additions. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades plus the design professionals required for the project.

text

What buyers should prepare

Target rooms, existing drawings if any, roof and attic photos, and known foundation concerns.

FAQ

Common questions

Do second-story additions need a Denver permit?

Yes. CPD requires building, zoning, and typically SUDP, with structural review because the work exceeds IRC prescriptive limits.

Who handles second-story permits and licensing?

A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.

Can the existing foundation take a second story?

Only after a design professional inspects it. CPD asks for a sealed structural-integrity letter for second-story additions.

How is height measured?

In feet and stories from the zoning front and rear base planes, not just from the sidewalk.

What information helps define scope?

Desired rooms, existing drawings, foundation notes, landmark status, and city or county.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Let's design your perfect Second-Story Addition together

Get a personalized estimate in about 2 minutes — no pressure, no obligation.

★★★★★
500+ Denver homeowners trust Autotelic
Licensed & Insured ContractorVeteran-OwnedTesla Certified

How This Works (2 minutes)

  1. 1Tell us about your project (30 seconds)
  2. 2Answer a few quick questions for an accurate estimate (60 seconds)
  3. 3Get your personalized estimate instantly (30 seconds)

No pressure. No obligation. No spam calls. If we're not the right fit, we'll tell you — and even recommend someone who is.