autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

CASTLE PINES SERVICES

ADU / Backyard Cottage in Castle Pines

Licensed ADU / backyard cottage services for Castle Pines and Douglas County. Build an income-producing unit in your backyard.

What Castle Pines requires

ER — Front Setback (min): 25' ER

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
ADU / Backyard Cottage

Build an income-producing unit in your backyard

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

ADU / Backyard Cottage Services in Castle Pines, Colorado

Autotelic provides professional ADU / backyard cottage services throughout Castle Pines and the surrounding Douglas County area. Accessory dwelling unit construction across the Denver metro — detached new builds, garage conversions, and basement conversions compliant with Colorado HB 24-1152. One veteran-owned design-build team runs the full Denver sequence under a single contract: zoning verification and concept design, municipal zoning and building permit reviews, then construction and inspections through certificate of occupancy. Whether you're in Castle Pines (south Douglas County) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Castle Pines permit thresholds

Code reference
The City of Castle Pines Building Department requires building permits for various residential remodel projects to ensure compliance with the 2021 International Building Code/International Residential Code and the 2023 National Electrical Code.
Code reference
1-Stop Permits are for projects that do not require drawings for a plan review.
Code reference
Instead, the requirement for a permit is based on the *type* of work being performed, as detailed in the lists for 1-Stop Permits and Plan Review Permits.
Code reference
The City of Castle Pines operates under the 2021 International Building Code/International Residential Code and the 2023 National Electrical Code.
Code reference
### Taxes and Fees (Based on 2026 Fee Schedule where available, or most recent provided)
Code reference
For example, according to the 2025 and 2026 Fee Schedules:
Code reference
For projects valued from $1.00 to $500.00, the fee is $42.00 (2025/2026).
Code reference
For projects valued from $501.00 to $2,000.00, the fee is $42.00 for the first $500.00, plus $5.45 for each additional $100.00 or fraction thereof (2025/2026).

Codes are amended regularly — verify current requirements with **The City of Castle Pines Building Department (part of the City’s Community Development department) issues residential building permits.

Zoning & ADU

Castle Pines zoning & ADU quick facts

ER — Front Setback (min)
25'ER
ER — Side Interior Setback (min)
25'ER
ER — Side Setback Abutting Street (min)
25'ER
ER — Rear Setback (min)
25'ER
ER — Building Height (max)
35'ER
ER — Acreage bands
§610 other-street: <2.3 ac sides 15'; 2.3+ sides 25'. Regional/major arterial front is 100'. Shown is the 2.3+ acre row.ER
Estate Residential — Front Setback (min)
25'Estate Residential
Estate Residential — Side Interior Setback (min)
25'Estate Residential
Castle Pines Zoning Ordinance ER setback standards (§307 A-1 / §610 ER / §612 / §309 Building Height) — effective 2019-09-01 · Castle Pines Zoning Ordinance Estate Residential setback standards (§307 A-1 / §610 ER / §612 / §309 Building Height) — effective 2019-09-01Source: castlepinesco.gov

Codes are amended regularly — verify current requirements with **The City of Castle Pines Building Department (part of the City’s Community Development department) issues residential building permits.

A recent build

Backyard ADU in Denver

Denver · 2026

Status
Under construction — 2026
Managed on
Buildbot — Autotelic’s own PM platform
  • Architecture, site plans, and full MEP design completed in-house
  • Permits pulled — electric and plumbing rough-ins permitted and underway
  • Spray-foam insulation and exterior work in progress
  • First project managed end-to-end on Buildbot, Autotelic’s construction-PM platform

A ground-up backyard ADU in Denver — designed, permitted, and now under construction by Autotelic, and the first project managed end-to-end on Buildbot, Autotelic’s own construction-management platform.

Energy Code

Castle Pines energy code quick facts

Code reference
The City of Castle Pines, Colorado, operates under the 2021 International Energy Conservation Code (IECC) as its currently adopted energy code.
Code reference
While an earlier ordinance (Ordinance No. 16-08) adopted the 2015 IECC, state law (House Bill 22-1362) mandates that jurisdictions updating other building codes between July 1, 2023, and June 30, 2026, must adopt and enforce the 2021 IECC or an equivalent or more stringent code.Ord. No. 16-08
Code reference
The City of Castle Pines currently enforces the 2021 International Building Code (IBC) and International Residential Code (IRC), which would trigger the 2021 IECC adoption requirement.
Code reference
Castle Pines is located in Climate Zone 5B.
Code reference
Here are key prescriptive requirements from the 2021 IECC relevant to remodels and additions in Climate Zone 5B:
Code reference
### Key Prescriptive Requirements for Remodels/Additions (2021 IECC, Climate Zone 5B)
Code reference
The following requirements apply to new construction and additions, and often to portions of existing buildings that are altered, as per the 2021 IECC and generally apply to residential applications.
Requirement
R-60
Ord. No. 16-08

Codes are amended regularly — verify current requirements with **The City of Castle Pines Building Department (part of the City’s Community Development department) issues residential building permits.

text

What this covers

Detached or attached accessory dwelling on a Denver lot: foundation or module, envelope, and utility tie-in. Height and massing follow Denver bulk-plane and ADU rules for the zone; confirm with CPD before drawings freeze.

text

How the work is coordinated

A municipally licensed Denver general contractor coordinates licensed specialty trades for electrical and plumbing. Denver-metro work is permitted locally. Colorado has no statewide general-contractor license. Cities and counties license general contractors. DORA licenses electrical and plumbing (and similar regulated trades), not general contractors. Autotelic is a municipally licensed Denver general contractor that coordinates licensed specialty trades. Denver building permits run through Community Planning and Development (CPD). Costs are project-specific; no dollar figures.

Service Area

Serving Castle Pines and Douglas County

We serve Castle Pines, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Castle Pines project.

FAQ

Common questions

Is an ADU allowed on my lot?

It depends on your city’s zoning — lot size, setbacks, and parking rules vary across the metro. We run the zoning check as the first step and tell you what your lot supports before you spend money on design.

Do you handle ADU permits and inspections?

Yes — ADU permitting is municipal, and we manage zoning review, permit application, and every inspection through certificate of occupancy.

Detached, attached, or garage conversion — which is right?

Each has different zoning, cost, and site implications. We design all three and recommend based on your lot, budget, and how you plan to use the unit.

What does an ADU cost?

Getting a real answer costs less than most people expect: an ADU feasibility consultation is $350, and the full ADU feasibility package — zoning check, site analysis, and concept direction — is $950, both listed at fixed prices on our booking page. Construction cost depends on the path: garage and basement conversions reuse existing structure, while a detached backyard cottage is new construction from the foundation up. After feasibility we quote the build itself as a fixed-price proposal, so you know the number before work starts.

How long does an ADU project take?

Three phases run in sequence: design (site measure, concept, construction documents), permitting (zoning and building review, which move on the municipality’s calendar), then construction. Conversions generally move faster than detached new builds because the shell and foundation already exist. We lay out the phase-by-phase schedule in your proposal, and you track progress on our operations platform once work starts.

How small a lot can support an ADU?

Smaller than most people assume — many Front Range single-unit lots that owners write off can carry a detached unit, and each city sets its own minimum lot size, setbacks, and building coverage. Whether your district’s standards leave room for a backyard cottage — or point you toward a garage or basement conversion instead — is exactly what the feasibility check answers for your address.

What is the ADU permit process?

Two municipal reviews run in order: a zoning review confirming the unit fits your district’s standards, then a building permit review of the construction documents, with inspections during the build and a certificate of occupancy at the end. Colorado HB 24-1152 now requires most Front Range municipalities to allow ADUs on single-unit lots, and we confirm how your city implements it as the first step of feasibility.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Let's design your perfect ADU / Backyard Cottage together

Get a personalized estimate in about 2 minutes — no pressure, no obligation.

Licensed & Insured ContractorVeteran-Owned

How This Works (2 minutes)

  1. 1Tell us about your project (30 seconds)
  2. 2Answer a few quick questions for an accurate estimate (60 seconds)
  3. 3Get your personalized estimate instantly (30 seconds)

No pressure. No obligation. No spam calls. If we're not the right fit, we'll tell you — and even recommend someone who is.