autotelic.build

DESIGN · BUILD · AUTOMATE

TRADE SERVICES

Build an income-producing unit in your backyard

Accessory dwelling unit construction across the Denver metro — detached new builds, garage conversions, and basement conversions compliant with Colorado HB 24-1152. One veteran-owned design-build team runs the full Denver sequence under a single contract: zoning verification and concept design, municipal zoning and building permit reviews, then construction and inspections through certificate of occupancy.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
ADU / Backyard Cottage

Build an income-producing unit in your backyard

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Detached, garage conversion, or basement conversion

ADU Scope

Every ADU starts with your lot. Colorado HB 24-1152 opened most Front Range single-unit lots to ADUs, and every city applies its own lot-size, setback, and coverage standards. We verify your city's district standards first, then carry the project through three phases — design (site measure, concept, construction documents), permitting (municipal zoning and building review), and build — ending at a certificate of occupancy.

  • Zoning verification against your city's district standards — minimum lot size, width, setbacks, and building coverage checked before any design work
  • Three build paths — detached backyard cottage, garage conversion, or basement conversion — matched to your lot, budget, and how you plan to use the unit
  • Concept design, construction documents, and the full municipal zoning and building permit sequence handled for you
  • Realistic phasing — design, then permit review, then build — with schedule visibility through our own operations platform
  • Full kitchen and bathroom build-out with independent HVAC and electrical service
  • Tesla Solar Roof and Powerwall integration
  • Rental-ready finishes, separate entrance, and certificate of occupancy at closeout

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Let's design your perfect ADU / Backyard Cottage together

Get a personalized estimate in about 2 minutes — no pressure, no obligation.

Licensed & Insured ContractorVeteran-OwnedTesla Certified

How This Works (2 minutes)

  1. 1Tell us about your project (30 seconds)
  2. 2Answer a few quick questions for an accurate estimate (60 seconds)
  3. 3Get your personalized estimate instantly (30 seconds)

No pressure. No obligation. No spam calls. If we're not the right fit, we'll tell you — and even recommend someone who is.

FAQ

Common questions

Is an ADU allowed on my lot?

It depends on your city’s zoning — lot size, setbacks, and parking rules vary across the metro. We run the zoning check as the first step and tell you what your lot supports before you spend money on design.

Do you handle ADU permits and inspections?

Yes — ADU permitting is municipal, and we manage zoning review, permit application, and every inspection through certificate of occupancy.

Detached, attached, or garage conversion — which is right?

Each has different zoning, cost, and site implications. We design all three and recommend based on your lot, budget, and how you plan to use the unit.

What does an ADU cost?

Getting a real answer costs less than most people expect: an ADU feasibility consultation is $350, and the full ADU feasibility package — zoning check, site analysis, and concept direction — is $950, both listed at fixed prices on our booking page. Construction cost depends on the path: garage and basement conversions reuse existing structure, while a detached backyard cottage is new construction from the foundation up. After feasibility we quote the build itself as a fixed-price proposal, so you know the number before work starts.

How long does an ADU project take?

Three phases run in sequence: design (site measure, concept, construction documents), permitting (zoning and building review, which move on the municipality’s calendar), then construction. Conversions generally move faster than detached new builds because the shell and foundation already exist. We lay out the phase-by-phase schedule in your proposal, and you track progress on our operations platform once work starts.

How small a lot can support an ADU?

Smaller than most people assume — many Front Range single-unit lots that owners write off can carry a detached unit, and each city sets its own minimum lot size, setbacks, and building coverage. Whether your district’s standards leave room for a backyard cottage — or point you toward a garage or basement conversion instead — is exactly what the feasibility check answers for your address.

What is the ADU permit process?

Two municipal reviews run in order: a zoning review confirming the unit fits your district’s standards, then a building permit review of the construction documents, with inspections during the build and a certificate of occupancy at the end. Colorado HB 24-1152 now requires most Front Range municipalities to allow ADUs on single-unit lots, and we confirm how your city implements it as the first step of feasibility.