(720) 287-7958

DESIGN · BUILD · AUTOMATE

PARKER SERVICES

Parker ADU / backyard cottage — local feasibility & estimate

ADU Feasibility Consultation, $350

Compare both studies

Exploring a backyard ADU in Parker? Autotelic helps assess feasibility against lot, setbacks, HOA, and local rules—then provides a clear estimate and build path with one team. No fake zoning envelopes. No invented prices or license claims.

What Parker requires

Key official source: Parker Administrative Code, Section 301 (Permits and Inspections), specifically 301.1 (Permits Required) and 301.2 / 301.2.1 (Exempted Work). §301

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
ADU / Backyard Cottage

Build an income-producing unit in your backyard

Book an ADU feasibility study

Two fixed-price studies, booked online before you pay for design: a site visit with a go/no-go read on your lot, or a written report you can take to a lender.

Pay when you book. We confirm within 24 hours or refund you in full.

  • ADU Feasibility Consultation

    An on-site review of your lot against local ADU zoning, setbacks, and utility access.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    An on-site review of your lot against local ADU zoning, setbacks, and utility access. You get a verbal go/no-go read plus a one-page summary of constraints and next steps.

  • ADU Feasibility Package

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget.

    $475 deposit to book, the rest when the work is done · morning (8–12) or afternoon (12–4)

    What's included

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget. A documented go/no-go you can take to a lender.

Studies for additions, custom homes and commercial space

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

ADU / Backyard Cottage Services in Parker, Colorado

Autotelic provides professional ADU / backyard cottage services throughout Parker and the surrounding Douglas County area. Accessory dwelling unit construction across the Denver metro — detached new builds, garage conversions, and basement conversions compliant with Colorado HB 24-1152. One veteran-owned design-build team runs the full Denver sequence under a single contract: zoning verification and concept design, municipal zoning and building permit reviews, then construction and inspections through certificate of occupancy. Whether you're in Parker (southeast Denver metro) or nearby communities, our team delivers quality workmanship, licensed and insured.

Permit Thresholds

Parker permit thresholds

Key official source
Parker Administrative Code, Section 301 (Permits and Inspections), specifically 301.1 (Permits Required) and 301.2 / 301.2.1 (Exempted Work).§301
Code reference
Examples of residential remodel/alteration work typically requiring permits (per Town guidance, cross-referenced to Section 301):§301
Code reference
Exempt work (per Parker Administrative Code Section 301.2.1 for building permits; exemptions do not authorize work violating other codes/ordinances):§301.2.1
Code reference
One-story detached accessory buildings (tool/storage sheds, playhouses, similar uses) with floor area ≤ 200 sq ft and ceilings ≤ 10 ft.
Code reference
Fences not over 6 ft high.
Code reference
Movable cases, counters, and partitions not over 5 ft 9 in high.
Code reference
Decks (any height/size), retaining/block walls over 48 inches, and related work are explicitly noted as requiring permits.
Code reference
A 2.5% convenience fee applies to credit card transactions.

Codes are amended regularly — verify current requirements with **Town of Parker Building Division (within incorporated Parker limits).

Zoning & ADU

Parker zoning & ADU quick facts

Code reference
SF1 (Large-Lot Residential, LDO §13.04.020), SF2 (Standard-Lot Residential, LDO §13.04.030), and SF3 (Small-Lot Residential, LDO §13.04.040) are the primary single-family residential districts.§13.04.020
Max lot coverage %
No numeric maximum lot coverage percentage is specified in the district standards for SF1, SF2, or SF3 (tables focus on minimum lot size/width, setbacks, and height; lot coverage may be addressed elsewhere or not regulated numerically in base districts).
Max building height
35 feet in SF1 (LDO §13.04.020), SF2 (LDO §13.04.030), and SF3 (LDO §13.04.040).§13.04.020
ADU permitted
No specific permission or standards for accessory dwelling units (ADUs) are detailed in the base SF1/SF2/SF3 district provisions.
Code reference
Parker has asserted home-rule authority regarding state ADU mandates (HB24-1152 / C.R.S.
Code reference
§§ 29-35-402 et seq.), which generally require allowance of at least one ADU where single-unit detached dwellings are permitted; local implementation details are not enumerated in the available district standards.§ 29-35-402
SF1 (LDO §13.04.020)
Front 25 feet; side 10 feet; side (adjacent to street) none listed; rear 15 feet.§13.04.020
Note [1]
On Restricted Lots, buildings ≤35 ft tall require minimum 25 ft from each property line with a Protected Lot; buildings >35 ft require minimum 40 ft from each such line.

Codes are amended regularly — verify current requirements with **Town of Parker Building Division (within incorporated Parker limits).

A recent build

Backyard ADU in Denver

Denver · 2026

Status
Under construction — 2026
Managed on
Buildbot — Autotelic’s own PM platform
  • Architecture, site plans, and full MEP design completed in-house
  • Permits pulled — electric and plumbing rough-ins permitted and underway
  • Spray-foam insulation and exterior work in progress
  • First project managed end-to-end on Buildbot, Autotelic’s construction-PM platform

A ground-up backyard ADU in Denver — designed, permitted, and now under construction by Autotelic, and the first project managed end-to-end on Buildbot, Autotelic’s own construction-management platform.

Energy Code

Parker energy code quick facts

Code reference
2024 International Energy Conservation Code (IECC), effective June 30, 2026, as adopted by the Town of Parker (no specific local energy code amendments noted beyond the base 2024 IECC and the separately listed 2025 Colorado Model Electric Ready and Solar Ready Code).
Code reference
Parker (Douglas County) is in IECC Climate Zone 5B.
Code reference
The 2024 IECC applies to additions and remodels/alterations (with the added or modified portions generally required to meet current prescriptive or performance requirements; unmodified portions are typically not required to be upgraded).
Code reference
Key prescriptive requirements (from the adopted 2024 IECC, relevant to remodels/additions in CZ 5; cite the base code sections as no local amendments override them):
Code reference
Vertical fenestration U-factor ≤ 0.28 (Table R402.1.2; 2024 IECC R402.1.2).
Code reference
Skylight U-factor ≤ 0.50 (Table R402.1.2; 2024 IECC R402.1.2).
Code reference
Air leakage ≤ 3 ACH50 (tested and verified; R402.4.1.2 / R402.5.1.2; applies to CZ 3–5, including 5B; 2024 IECC).
Code reference
Ceiling/attic insulation R-49 (prescriptive R-value path in Table R402.1.3 or equivalent U-factor path; 2024 IECC, reflecting 2024 updates from prior editions).

Codes are amended regularly — verify current requirements with **Town of Parker Building Division (within incorporated Parker limits).

Service Area

Serving Parker and Douglas County

We serve Parker, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Parker project.

FAQ

ADU feasibility FAQ

How much does ADU Feasibility Consultation cost in Parker?

$350.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Can I build an ADU on my lot?

It depends on lot size, setbacks, HOA rules, and Parker’s code. Autotelic helps assess feasibility—we do not invent zoning envelopes or guarantee permit outcomes.

Is the online sizing tool a permit determination?

No. Lot-aware sizing on /adu/ is illustrative only and is not a permit determination. A clear estimate and local review come next.

What happens after I start an estimate?

You move from feasibility into a clear estimate with the same design-build team, then permit coordination and build with a licensed Denver-metro crew when you proceed.

What will an ADU cost?

The lot lookup is free. Our ADU cost page shows planning ranges for a detached backyard cottage; your lot, utility connections and finishes affect the price. Start an estimate for your project, or call (720) 287-7958 to talk it through. A fixed-price build proposal comes after feasibility.

How long does an ADU project take?

First we check your lot and agree on the scope. Then come design and drawings, city permit review, and construction with inspections. Your lot, utility connections, design changes and the city’s review schedule affect the timing. Your proposal includes a project-specific schedule before you commit to the build. A consultation booking is the first planning conversation, not a construction start date.

Who builds the ADU?

Autotelic’s local design-build team takes your project from the first concept through an estimate, permits and construction. You have one team to talk to along the way.

Do you handle ADU permits and inspections?

Yes — ADU permitting is municipal, and we manage zoning review, permit application, and every inspection through certificate of occupancy.

Detached, attached, or garage conversion — which is right?

Each has different zoning, cost, and site implications. We design all three and recommend based on your lot, budget, and how you plan to use the unit.

How small a lot can support an ADU?

Smaller than most people assume — many Front Range single-unit lots that owners write off can carry a detached unit, and each city sets its own minimum lot size, setbacks, and building coverage. Whether your district’s standards leave room for a backyard cottage — or point you toward a garage or basement conversion instead — is exactly what the feasibility check answers for your address.

What is the ADU permit process?

Two municipal reviews run in order: a zoning review confirming the unit fits your district’s standards, then a building permit review of the construction documents, with inspections during the build and a certificate of occupancy at the end. Colorado HB 24-1152 now requires most Front Range municipalities to allow ADUs on single-unit lots, and we confirm how your city implements it as the first step of feasibility.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY