autotelic.build

DESIGN · BUILD · AUTOMATE

ARVADA SERVICES

ADU / Backyard Cottage in Arvada

Licensed adu / backyard cottage services for Arvada and Jefferson/Adams County. Build an income-producing unit in your backyard.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
ADU / Backyard Cottage

Build an income-producing unit in your backyard

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

ADU / Backyard Cottage Services in Arvada, Colorado

Autotelic provides professional adu / backyard cottage services throughout Arvada and the surrounding Jefferson/Adams County area. Accessory dwelling unit construction across the Denver metro — detached new builds, garage conversions, and basement conversions compliant with Colorado HB 24-1152. One veteran-owned design-build team runs the full Denver sequence under a single contract: zoning verification and concept design, municipal zoning and building permit reviews, then construction and inspections through certificate of occupancy. Whether you're in Arvada (historic Olde Town and rapid growth) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permits & Licensing

Permits in Arvada

Arvada building permits are issued by Building Services, and the city notes that unpermitted work can jeopardize a contractor's licensing as well as a property's resale value. Permit applications, inspection scheduling, and status checks are handled through the separate Arvada Permits (eTRAKiT) site. Authority: City of Arvada — Building Services.

Permit Thresholds

Arvada permit thresholds

Code reference
Arvada requires building permits for most residential construction, alteration, repair, enlargement, replacement, equipment installation, use/occupancy changes, and demolition work, per the City’s Building Permits page and Chapter 18 of the Arvada City Code (which adopts the 2024 International ResOrdinance No. 4921
Code reference
This is assessed in lieu of sales tax on construction materials used in Arvada (Arvada Municipal Code § 98-84).§ 98-84
Code reference
A separate 2026 Building Fee Schedule PDF is referenced but not detailed on the main pages.
Code reference
For the most current or project-specific details (including any local amendments to the 2024 IRC that might address minor/exempt work or structural thresholds), contact the Arvada Building Safety Division or check the adopted codes on the City website, as published information emphasizes case-by-cas
Ordinance No. 4921Source: arvadaco.gov

Codes are amended regularly — verify current requirements with City of Arvada — Building Services.

Energy Code

Arvada energy code quick facts

Code reference
Arvada, Colorado, has adopted the Colorado Low Energy Carbon Code (or Model Low Energy and Carbon Code/MLECC/LECC), based on the 2024 International Energy Conservation Code (IECC), with no additional local energy-code amendments noted beyond the state model. This applies alongside the 2024 Inter
Code reference
Adoption occurred via City Council action on March 24, 2026 (effective for permits submitted on or after approximately July 1, 2026).
Code reference
Arvada (Climate Zone 5B) does not use the Denver Green Code or Energize Denver program.
Code reference
For remodels and additions, the modified/new portions generally must comply with the current code (per IECC/LECC Sections C502/C503 or R502/R503 equivalents) without necessarily triggering updates to unmodified existing systems.
Code reference
Key prescriptive requirements (drawn from the 2024 IECC residential provisions as adopted in the Colorado LECC; values for CZ 5; relevant to new or modified envelope elements in additions/remodels):
Ceiling/attic insulation
Minimum R-49 (Table R402.1.3 / equivalent in LECC).
Wood-frame above-grade wall insulation
Options include R-20 + R-5 ci, R-13 + R-10 ci, or equivalent assembly U-factor ≤ 0.045 (or reduced options such as R-20 cavity with additional efficiency credits per R408); see Table R402.1.2/R402.1.3.
Air leakage (blower-door testing)
Maximum 3.0 ACH50 at 50 Pa for the tested dwelling unit or building under the prescriptive path in CZ 3–5 (R402.5.1.3 / equivalent).

Codes are amended regularly — verify current requirements with City of Arvada — Building Services.

Zoning & Dimensional Standards

Setback & dimensional standards in Arvada

Zone-district dimensional standards for Arvada, quoted verbatim from the Arvada Land Development Code. Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

RN-12.5setback & dimensional standards
StandardRequirement
Front Setback (min)30 ft.
Side Interior Setback (min)10 ft.
Rear Setback (min)15 ft.
Building Coverage (max)35%
Building Height (max)28 ft.
Lot Area (min)12,500 sf.
Lot Width (min)100 ft.

Arvada Land Development Code RN-12.5 setback standards (2-1-3-3 Table 2-1-3-3A (RN)) — effective 2025-12-16 · View the code

RN-32.5setback & dimensional standards
StandardRequirement
Front Setback (min)30 ft.
Side Interior Setback (min)15 ft.
Rear Setback (min)15 ft.
Building Coverage (max)25%
Building Height (max)35 ft.
Lot Area (min)32,500 sf.
Lot Width (min)100 ft.

Arvada Land Development Code RN-32.5 setback standards (2-1-3-3 Table 2-1-3-3A (RN)) — effective 2025-12-16 · View the code

RN-4setback & dimensional standards
StandardRequirement
Front Setback (min)18 ft.
Side Interior Setback (min)5 ft.
Rear Setback (min)10 ft.
Building Coverage (max)40%
Building Height (max)28 ft.
Lot Area (min)4,000 sf.
Lot Width (min)40 ft.

Arvada Land Development Code RN-4 setback standards (2-1-3-3 Table 2-1-3-3A (RN)) — effective 2025-12-16 · View the code

RN-6setback & dimensional standards
StandardRequirement
Front Setback (min)18 ft.
Side Interior Setback (min)5 ft.
Rear Setback (min)10 ft.
Building Coverage (max)40%
Building Height (max)28 ft.
Lot Area (min)6,000 sf.
Lot Width (min)50 ft.

Arvada Land Development Code RN-6 setback standards (2-1-3-3 Table 2-1-3-3A (RN)) — effective 2025-12-16 · View the code

RN-7.5setback & dimensional standards
StandardRequirement
Front Setback (min)20 ft.
Side Interior Setback (min)7.5 ft.
Rear Setback (min)10 ft.
Building Coverage (max)40%
Building Height (max)28 ft.
Lot Area (min)7,500 sf.
Lot Width (min)75 ft.

Arvada Land Development Code RN-7.5 setback standards (2-1-3-3 Table 2-1-3-3A (RN)) — effective 2025-12-16 · View the code

RN-Dsetback & dimensional standards
StandardRequirement
Front Setback (min)18 ft.
Side Interior Setback (min)5 ft.
Rear Setback (min)10 ft.
Building Coverage (max)40%
Building Height (max)28 ft.
Lot Area (min)6,000 sf.
Lot Width (min)60 ft.

Arvada Land Development Code RN-D setback standards (2-1-3-3 Table 2-1-3-3A (RN)) — effective 2025-12-16 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What this covers

Detached or attached accessory dwelling on a Denver lot: foundation or module, envelope, and utility tie-in. Height and massing follow Denver bulk-plane and ADU rules for the zone; confirm with CPD before drawings freeze.

text

How the work is coordinated

A municipally licensed Denver general contractor coordinates licensed specialty trades for electrical and plumbing. Denver-metro work is permitted locally. Colorado has no statewide general-contractor license. Cities and counties license general contractors. DORA licenses electrical and plumbing (and similar regulated trades), not general contractors. Autotelic is a municipally licensed Denver general contractor that coordinates licensed specialty trades. Denver building permits run through Community Planning and Development (CPD). Costs are project-specific; no dollar figures.

FAQ

Common questions

Who handles the adu / backyard cottage permits and licensing?

A municipally licensed Denver general contractor coordinates licensed specialty trades. Colorado has no statewide general-contractor license; cities and counties license general contractors. DORA licenses electrical and plumbing, not general contractors.

What is typically in scope for adu / backyard cottage in Denver?

Detached or attached accessory dwelling on a Denver lot: foundation or module, envelope, and utility tie-in.

When do you need drawings or a permit?

Anything that changes structure, occupancy, or regulated electrical or plumbing usually needs a local permit. Denver building permits are reviewed by Community Planning and Development. Confirm the exact trigger with CPD for the address.

Service Area

Serving Arvada and Jefferson/Adams County

We serve Arvada, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Arvada project.

FAQ

Common questions

Is an ADU allowed on my lot?

It depends on your city’s zoning — lot size, setbacks, and parking rules vary across the metro. We run the zoning check as the first step and tell you what your lot supports before you spend money on design.

Do you handle ADU permits and inspections?

Yes — ADU permitting is municipal, and we manage zoning review, permit application, and every inspection through certificate of occupancy.

Detached, attached, or garage conversion — which is right?

Each has different zoning, cost, and site implications. We design all three and recommend based on your lot, budget, and how you plan to use the unit.

What does an ADU cost?

Getting a real answer costs less than most people expect: an ADU feasibility consultation is $350, and the full ADU feasibility package — zoning check, site analysis, and concept direction — is $950, both listed at fixed prices on our booking page. Construction cost depends on the path: garage and basement conversions reuse existing structure, while a detached backyard cottage is new construction from the foundation up. After feasibility we quote the build itself as a fixed-price proposal, so you know the number before work starts.

How long does an ADU project take?

Three phases run in sequence: design (site measure, concept, construction documents), permitting (zoning and building review, which move on the municipality’s calendar), then construction. Conversions generally move faster than detached new builds because the shell and foundation already exist. We lay out the phase-by-phase schedule in your proposal, and you track progress on our operations platform once work starts.

How small a lot can support an ADU?

Smaller than most people assume — many Front Range single-unit lots that owners write off can carry a detached unit, and each city sets its own minimum lot size, setbacks, and building coverage. Whether your district’s standards leave room for a backyard cottage — or point you toward a garage or basement conversion instead — is exactly what the feasibility check answers for your address.

What is the ADU permit process?

Two municipal reviews run in order: a zoning review confirming the unit fits your district’s standards, then a building permit review of the construction documents, with inspections during the build and a certificate of occupancy at the end. Colorado HB 24-1152 now requires most Front Range municipalities to allow ADUs on single-unit lots, and we confirm how your city implements it as the first step of feasibility.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Let's design your perfect ADU / Backyard Cottage together

Get a personalized estimate in about 2 minutes — no pressure, no obligation.

Licensed & Insured ContractorVeteran-Owned

How This Works (2 minutes)

  1. 1Tell us about your project (30 seconds)
  2. 2Answer a few quick questions for an accurate estimate (60 seconds)
  3. 3Get your personalized estimate instantly (30 seconds)

No pressure. No obligation. No spam calls. If we're not the right fit, we'll tell you — and even recommend someone who is.