(720) 287-7958

DESIGN · BUILD · AUTOMATE

GREENWOOD VILLAGE SERVICES

Greenwood Village ADU / backyard cottage — local feasibility & estimate

ADU Feasibility Consultation, $350

Compare both studies

Exploring a backyard ADU in Greenwood Village? Autotelic helps assess feasibility against lot, setbacks, HOA, and local rules—then provides a clear estimate and build path with one team. No fake zoning envelopes. No invented prices or license claims.

What Greenwood Village requires

Code reference: (IECC 2018, Table R402.1.2) IECC 2018

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
ADU / Backyard Cottage

Build an income-producing unit in your backyard

Book an ADU feasibility study

Two fixed-price studies, booked online before you pay for design: a site visit with a go/no-go read on your lot, or a written report you can take to a lender.

Pay when you book. We confirm within 24 hours or refund you in full.

  • ADU Feasibility Consultation

    An on-site review of your lot against local ADU zoning, setbacks, and utility access.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    An on-site review of your lot against local ADU zoning, setbacks, and utility access. You get a verbal go/no-go read plus a one-page summary of constraints and next steps.

  • ADU Feasibility Package

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget.

    $475 deposit to book, the rest when the work is done · morning (8–12) or afternoon (12–4)

    What's included

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget. A documented go/no-go you can take to a lender.

Studies for additions, custom homes and commercial space

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

ADU / Backyard Cottage Services in Greenwood Village, Colorado

Autotelic provides professional ADU / backyard cottage services throughout Greenwood Village and the surrounding Arapahoe County area. Accessory dwelling unit construction across the Denver metro — detached new builds, garage conversions, and basement conversions compliant with Colorado HB 24-1152. One veteran-owned design-build team runs the full Denver sequence under a single contract: zoning verification and concept design, municipal zoning and building permit reviews, then construction and inspections through certificate of occupancy. Whether you're in Greenwood Village (Denver Tech Center) or nearby communities, our team delivers quality workmanship, licensed and insured.

Permit Thresholds

Greenwood Village permit thresholds

Code reference
The city operates under the 2018 International Residential Code (IRC) and other 2018 International Codes, along with the 2023 National Electrical Code (NEC) standards.
Code reference
Concrete or asphalt work exceeding 100 square feet
Code reference
Re-roofs/Repairs involving the removal of 25% or more of the decking
Code reference
Landscaping or grading that is more than 10 feet from a property line, not within a drainage easement, involves less than 500 square feet of disturbed area, and less than 10 cubic yards of earthwork
Code reference
Re-roofing that only involves laying new shingles and patching unsound decking (less than 25% of decking removal)
Snow loads
30 lbs.
Ultimate wind speed
120 mph (Basic Design) and nominal: 93 mph (allowable stress design)
Frost depth
36 inches

Codes are amended regularly — verify current requirements with **The City of Greenwood Village (specifically its Community Development Department / Building Division) issues residential building permits.

Zoning & ADU

Greenwood Village zoning & ADU quick facts

Code reference
The most common single-family residential districts in Greenwood Village are generally designated as "R-" districts, such as R-1.5, R-1.0, R-0.75, R-0.5, R-0.25, R-0.1, and R-0.05.
Code reference
These districts are covered under Chapter 16, Article 7, titled "R-1.5, R-1.0, R-0.75, R-0.5, R-0.25, R-0.1 and R-0.05 Single-Family Residential Districts" of the Greenwood Village Municipal Code.

Codes are amended regularly — verify current requirements with **The City of Greenwood Village (specifically its Community Development Department / Building Division) issues residential building permits.

A recent build

Backyard ADU in Denver

Denver · 2026

Status
Under construction — 2026
Managed on
Buildbot — Autotelic’s own PM platform
  • Architecture, site plans, and full MEP design completed in-house
  • Permits pulled — electric and plumbing rough-ins permitted and underway
  • Spray-foam insulation and exterior work in progress
  • First project managed end-to-end on Buildbot, Autotelic’s construction-PM platform

A ground-up backyard ADU in Denver — designed, permitted, and now under construction by Autotelic, and the first project managed end-to-end on Buildbot, Autotelic’s own construction-management platform.

Energy Code

Greenwood Village energy code quick facts

Code reference
Greenwood Village, Colorado, has adopted the 2018 International Energy Conservation Code (IECC) as its energy code.
Code reference
There is no indication of a specific "Greenwood Green Code" or "Energize Denver" equivalent adopted by Greenwood Village; however, Colorado state law requires local jurisdictions to adopt and enforce the 2021 IECC and the Colorado Model Electric Ready and Solar Ready Code upon updating any other bui
Code reference
The adopting ordinance for the 2018 IECC is referenced on the Greenwood Village Official Website under "Adopted Codes & Manuals" and "Fee Schedule," stating that the 2018 International Energy Conservation Code is currently in effect.
Code reference
Given that Greenwood Village operates under the 2018 IECC and is in Climate Zone 5B, the following are key prescriptive requirements for residential construction, generally applicable to remodels and additions when the scope of work includes these elements:
Code reference
While specific local amendments to the 2018 IECC would need to be thoroughly reviewed within the Greenwood Village Municipal Code, the general prescriptive requirements for Climate Zone 5B from the 2018 IECC (which Greenwood Village has adopted) are as follows:
Ceiling Insulation (Attic)
R-49.
Code reference
(IECC 2018, Table R402.1.2)IECC 2018
Wood Frame Wall Insulation
R-20 continuous insulation (c.i.) or R-13 + R-5 c.i.
IECC 2018

Codes are amended regularly — verify current requirements with **The City of Greenwood Village (specifically its Community Development Department / Building Division) issues residential building permits.

Service Area

Serving Greenwood Village and Arapahoe County

We serve Greenwood Village, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Greenwood Village project.

FAQ

ADU feasibility FAQ

How much does ADU Feasibility Consultation cost in Greenwood Village?

$350.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Can I build an ADU on my lot?

It depends on lot size, setbacks, HOA rules, and Greenwood Village’s code. Autotelic helps assess feasibility—we do not invent zoning envelopes or guarantee permit outcomes.

Is the online sizing tool a permit determination?

No. Lot-aware sizing on /adu/ is illustrative only and is not a permit determination. A clear estimate and local review come next.

What happens after I start an estimate?

You move from feasibility into a clear estimate with the same design-build team, then permit coordination and build with a licensed Denver-metro crew when you proceed.

What will an ADU cost?

The lot lookup is free. Our ADU cost page shows planning ranges for a detached backyard cottage; your lot, utility connections and finishes affect the price. Start an estimate for your project, or call (720) 287-7958 to talk it through. A fixed-price build proposal comes after feasibility.

How long does an ADU project take?

First we check your lot and agree on the scope. Then come design and drawings, city permit review, and construction with inspections. Your lot, utility connections, design changes and the city’s review schedule affect the timing. Your proposal includes a project-specific schedule before you commit to the build. A consultation booking is the first planning conversation, not a construction start date.

Who builds the ADU?

Autotelic’s local design-build team takes your project from the first concept through an estimate, permits and construction. You have one team to talk to along the way.

Do you handle ADU permits and inspections?

Yes — ADU permitting is municipal, and we manage zoning review, permit application, and every inspection through certificate of occupancy.

Detached, attached, or garage conversion — which is right?

Each has different zoning, cost, and site implications. We design all three and recommend based on your lot, budget, and how you plan to use the unit.

How small a lot can support an ADU?

Smaller than most people assume — many Front Range single-unit lots that owners write off can carry a detached unit, and each city sets its own minimum lot size, setbacks, and building coverage. Whether your district’s standards leave room for a backyard cottage — or point you toward a garage or basement conversion instead — is exactly what the feasibility check answers for your address.

What is the ADU permit process?

Two municipal reviews run in order: a zoning review confirming the unit fits your district’s standards, then a building permit review of the construction documents, with inspections during the build and a certificate of occupancy at the end. Colorado HB 24-1152 now requires most Front Range municipalities to allow ADUs on single-unit lots, and we confirm how your city implements it as the first step of feasibility.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY