(720) 287-7958

DESIGN · BUILD · AUTOMATE

NORTHGLENN SERVICES

Northglenn ADU / backyard cottage — local feasibility & estimate

ADU Feasibility Consultation, $350

Compare both studies

Exploring a backyard ADU in Northglenn? Autotelic helps assess feasibility against lot, setbacks, HOA, and local rules—then provides a clear estimate and build path with one team. No fake zoning envelopes. No invented prices or license claims.

What Northglenn requires

Code reference: Residential remodel permits in Northglenn, CO, are administered by the Building Division (contracted to SAFEbuilt) under the adopted and locally amended 2021 International Residential Code (IRC), per Northglenn Municipal Code Chapter 10, Article 8 (Section 10-8-5 amendments). §10-8-5

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
ADU / Backyard Cottage

Build an income-producing unit in your backyard

Book an ADU feasibility study

Two fixed-price studies, booked online before you pay for design: a site visit with a go/no-go read on your lot, or a written report you can take to a lender.

Pay when you book. We confirm within 24 hours or refund you in full.

  • ADU Feasibility Consultation

    An on-site review of your lot against local ADU zoning, setbacks, and utility access.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    An on-site review of your lot against local ADU zoning, setbacks, and utility access. You get a verbal go/no-go read plus a one-page summary of constraints and next steps.

  • ADU Feasibility Package

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget.

    $475 deposit to book, the rest when the work is done · morning (8–12) or afternoon (12–4)

    What's included

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget. A documented go/no-go you can take to a lender.

Studies for additions, custom homes and commercial space

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

ADU / Backyard Cottage Services in Northglenn, Colorado

Autotelic provides professional ADU / backyard cottage services throughout Northglenn and the surrounding Adams County area. Accessory dwelling unit construction across the Denver metro — detached new builds, garage conversions, and basement conversions compliant with Colorado HB 24-1152. One veteran-owned design-build team runs the full Denver sequence under a single contract: zoning verification and concept design, municipal zoning and building permit reviews, then construction and inspections through certificate of occupancy. Whether you're in Northglenn (north Denver metro) or nearby communities, our team delivers quality workmanship, licensed and insured.

Permit Thresholds

Northglenn permit thresholds

Code reference
Residential remodel permits in Northglenn, CO, are administered by the Building Division (contracted to SAFEbuilt) under the adopted and locally amended 2021 International Residential Code (IRC), per Northglenn Municipal Code Chapter 10, Article 8 (Section 10-8-5 amendments).§10-8-5
Code reference
Permits are generally required for most residential remodel, alteration, addition, or repair work unless it qualifies for one of the narrow exemptions in the amended IRC Section R105.2.§R105.2.
Code reference
### Key Exemptions (IRC R105.2, as amended)
Exception 1 (amended)
Detached accessory structures (as defined in Chapter 11 of the Northglenn Municipal Code) with floor area ≤ 200 square feet.
Code reference
(Standard IRC Exception 1 deleted in full and replaced.)
Exception 2
Deleted in its entirety.
Code reference
Permit and plan-review fees are based on project valuation (determined via square footage applied to the ICC Building Valuation Data Table, currently referencing the Feb 2019 table, or as otherwise established).
Code reference
Fees follow the 1997 Uniform Building Code schedule.

Codes are amended regularly — verify current requirements with **The City of Northglenn Building Division (contracted services provided by SAFEbuilt) issues residential building permits.

Zoning & ADU

Northglenn zoning & ADU quick facts

RS-1 — Minimum Lot Area
12500 sfRS-1
RS-1 — Minimum Lot Width
100'RS-1
RS-1 — Front Setback (min)
30'RS-1
RS-1 — Side Interior Setback (min)
10'RS-1
RS-1 — Rear Setback (min)
20'RS-1
RS-1 — Lot Coverage (max)
40%RS-1
RS-1 — Building Height (max)
28'RS-1
RS1 — Front Setback (min)
30'RS1
Northglenn UDO Table 2-18-A/B/C (Ord. 1966, 2019) RS-1 setback standards (11-2-18 Summary Tables of Lot and Building Standards) — effective 2019-02-01 · Northglenn UDO Table 2-18-A/B/C (Ord. 1966, 2019) RS1 setback standards (11-2-18 Summary Tables of Lot and Building Standards) — effective 2019-02-01Source: municode.northglenn.org

Codes are amended regularly — verify current requirements with **The City of Northglenn Building Division (contracted services provided by SAFEbuilt) issues residential building permits.

A recent build

Backyard ADU in Denver

Denver · 2026

Status
Under construction — 2026
Managed on
Buildbot — Autotelic’s own PM platform
  • Architecture, site plans, and full MEP design completed in-house
  • Permits pulled — electric and plumbing rough-ins permitted and underway
  • Spray-foam insulation and exterior work in progress
  • First project managed end-to-end on Buildbot, Autotelic’s construction-PM platform

A ground-up backyard ADU in Denver — designed, permitted, and now under construction by Autotelic, and the first project managed end-to-end on Buildbot, Autotelic’s own construction-management platform.

Energy Code

Northglenn energy code quick facts

Code reference
2021 IECC (with local amendments), per Northglenn Municipal Code Article 10-11 (adopted by Ord. 1799, 2020; Ord. 1847, 2023).
Code reference
Northglenn has not yet adopted the 2024 codes (scheduled for summer 2026).
Code reference
mixed-fuel building definitions/credits (e.g., 10 credits for all-electric new buildings or 20 for mixed-fuel from specified tables), and related provisions, but do not alter the base prescriptive insulation/U-factor tables or air-leakage thresholds from the 2021 IECC for Climate Zone 5B.
Code reference
Key prescriptive requirements relevant to remodels/additions (drawn from the adopted 2021 IECC provisions for CZ 5B, which apply unless a specific alteration triggers full compliance or exceptions; see IECC Chapter 5 / R5 sections for existing buildings):
Ceiling/attic insulation
R-60 (2021 IECC Table R402.1.2 / equivalent commercial table; applicable when accessible during remodels/additions).
Wood-frame wall insulation
R-20 + R-5 ci or R-13 + R-10 ci (2021 IECC Table R402.1.2; relevant for additions or wall alterations exposing cavities).
Air leakage / blower-door testing threshold
Maximum 3 ACH50 (2021 IECC R402.4.1.2; mandatory for new construction and often triggered or recommended for major remodels/additions meeting certain thresholds).
Additional electric infrastructure for combustion equipment (amendment to 2021 I
Junction box, continuous raceway to panel, reserved breaker space, and labeling “For future electric equipment” sized for equivalent electric load (Section C405.13 / equivalent residential; applies to alterations involving combustion equipment).§C405.13

Codes are amended regularly — verify current requirements with **The City of Northglenn Building Division (contracted services provided by SAFEbuilt) issues residential building permits.

Service Area

Serving Northglenn and Adams County

We serve Northglenn, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Northglenn project.

FAQ

ADU feasibility FAQ

How much does ADU Feasibility Consultation cost in Northglenn?

$350.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Can I build an ADU on my lot?

It depends on lot size, setbacks, HOA rules, and Northglenn’s code. Autotelic helps assess feasibility—we do not invent zoning envelopes or guarantee permit outcomes.

Is the online sizing tool a permit determination?

No. Lot-aware sizing on /adu/ is illustrative only and is not a permit determination. A clear estimate and local review come next.

What happens after I start an estimate?

You move from feasibility into a clear estimate with the same design-build team, then permit coordination and build with a licensed Denver-metro crew when you proceed.

What will an ADU cost?

The lot lookup is free. Our ADU cost page shows planning ranges for a detached backyard cottage; your lot, utility connections and finishes affect the price. Start an estimate for your project, or call (720) 287-7958 to talk it through. A fixed-price build proposal comes after feasibility.

How long does an ADU project take?

First we check your lot and agree on the scope. Then come design and drawings, city permit review, and construction with inspections. Your lot, utility connections, design changes and the city’s review schedule affect the timing. Your proposal includes a project-specific schedule before you commit to the build. A consultation booking is the first planning conversation, not a construction start date.

Who builds the ADU?

Autotelic’s local design-build team takes your project from the first concept through an estimate, permits and construction. You have one team to talk to along the way.

Do you handle ADU permits and inspections?

Yes — ADU permitting is municipal, and we manage zoning review, permit application, and every inspection through certificate of occupancy.

Detached, attached, or garage conversion — which is right?

Each has different zoning, cost, and site implications. We design all three and recommend based on your lot, budget, and how you plan to use the unit.

How small a lot can support an ADU?

Smaller than most people assume — many Front Range single-unit lots that owners write off can carry a detached unit, and each city sets its own minimum lot size, setbacks, and building coverage. Whether your district’s standards leave room for a backyard cottage — or point you toward a garage or basement conversion instead — is exactly what the feasibility check answers for your address.

What is the ADU permit process?

Two municipal reviews run in order: a zoning review confirming the unit fits your district’s standards, then a building permit review of the construction documents, with inspections during the build and a certificate of occupancy at the end. Colorado HB 24-1152 now requires most Front Range municipalities to allow ADUs on single-unit lots, and we confirm how your city implements it as the first step of feasibility.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY