autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

NORTHGLENN SERVICES

ADU / Backyard Cottage in Northglenn

Licensed ADU / backyard cottage services for Northglenn and Adams County. Build an income-producing unit in your backyard.

What Northglenn requires

Code reference: Residential remodel permits in Northglenn, CO, are administered by the Building Division (contracted to SAFEbuilt) under the adopted and locally amended 2021 International Residential Code (IRC), per Northglenn Municipal Code Chapter 10, Article 8 (Section 10-8-5 amendments). §10-8-5

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
ADU / Backyard Cottage

Build an income-producing unit in your backyard

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

ADU / Backyard Cottage Services in Northglenn, Colorado

Autotelic provides professional ADU / backyard cottage services throughout Northglenn and the surrounding Adams County area. Accessory dwelling unit construction across the Denver metro — detached new builds, garage conversions, and basement conversions compliant with Colorado HB 24-1152. One veteran-owned design-build team runs the full Denver sequence under a single contract: zoning verification and concept design, municipal zoning and building permit reviews, then construction and inspections through certificate of occupancy. Whether you're in Northglenn (north Denver metro) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Northglenn permit thresholds

Code reference
Residential remodel permits in Northglenn, CO, are administered by the Building Division (contracted to SAFEbuilt) under the adopted and locally amended 2021 International Residential Code (IRC), per Northglenn Municipal Code Chapter 10, Article 8 (Section 10-8-5 amendments).§10-8-5
Code reference
Permits are generally required for most residential remodel, alteration, addition, or repair work unless it qualifies for one of the narrow exemptions in the amended IRC Section R105.2.§R105.2.
Code reference
### Key Exemptions (IRC R105.2, as amended)
Exception 1 (amended)
Detached accessory structures (as defined in Chapter 11 of the Northglenn Municipal Code) with floor area ≤ 200 square feet.
Code reference
(Standard IRC Exception 1 deleted in full and replaced.)
Exception 2
Deleted in its entirety.
Code reference
Permit and plan-review fees are based on project valuation (determined via square footage applied to the ICC Building Valuation Data Table, currently referencing the Feb 2019 table, or as otherwise established).
Code reference
Fees follow the 1997 Uniform Building Code schedule.

Codes are amended regularly — verify current requirements with **The City of Northglenn Building Division (contracted services provided by SAFEbuilt) issues residential building permits.

Zoning & ADU

Northglenn zoning & ADU quick facts

RS-1 — Minimum Lot Area
12500 sfRS-1
RS-1 — Minimum Lot Width
100'RS-1
RS-1 — Front Setback (min)
30'RS-1
RS-1 — Side Interior Setback (min)
10'RS-1
RS-1 — Rear Setback (min)
20'RS-1
RS-1 — Lot Coverage (max)
40%RS-1
RS-1 — Building Height (max)
28'RS-1
RS1 — Front Setback (min)
30'RS1
Northglenn UDO Table 2-18-A/B/C (Ord. 1966, 2019) RS-1 setback standards (11-2-18 Summary Tables of Lot and Building Standards) — effective 2019-02-01 · Northglenn UDO Table 2-18-A/B/C (Ord. 1966, 2019) RS1 setback standards (11-2-18 Summary Tables of Lot and Building Standards) — effective 2019-02-01Source: municode.northglenn.org

Codes are amended regularly — verify current requirements with **The City of Northglenn Building Division (contracted services provided by SAFEbuilt) issues residential building permits.

A recent build

Backyard ADU in Denver

Denver · 2026

Status
Under construction — 2026
Managed on
Buildbot — Autotelic’s own PM platform
  • Architecture, site plans, and full MEP design completed in-house
  • Permits pulled — electric and plumbing rough-ins permitted and underway
  • Spray-foam insulation and exterior work in progress
  • First project managed end-to-end on Buildbot, Autotelic’s construction-PM platform

A ground-up backyard ADU in Denver — designed, permitted, and now under construction by Autotelic, and the first project managed end-to-end on Buildbot, Autotelic’s own construction-management platform.

Energy Code

Northglenn energy code quick facts

Code reference
2021 IECC (with local amendments), per Northglenn Municipal Code Article 10-11 (adopted by Ord. 1799, 2020; Ord. 1847, 2023).
Code reference
Northglenn has not yet adopted the 2024 codes (scheduled for summer 2026).
Code reference
mixed-fuel building definitions/credits (e.g., 10 credits for all-electric new buildings or 20 for mixed-fuel from specified tables), and related provisions, but do not alter the base prescriptive insulation/U-factor tables or air-leakage thresholds from the 2021 IECC for Climate Zone 5B.
Code reference
Key prescriptive requirements relevant to remodels/additions (drawn from the adopted 2021 IECC provisions for CZ 5B, which apply unless a specific alteration triggers full compliance or exceptions; see IECC Chapter 5 / R5 sections for existing buildings):
Ceiling/attic insulation
R-60 (2021 IECC Table R402.1.2 / equivalent commercial table; applicable when accessible during remodels/additions).
Wood-frame wall insulation
R-20 + R-5 ci or R-13 + R-10 ci (2021 IECC Table R402.1.2; relevant for additions or wall alterations exposing cavities).
Air leakage / blower-door testing threshold
Maximum 3 ACH50 (2021 IECC R402.4.1.2; mandatory for new construction and often triggered or recommended for major remodels/additions meeting certain thresholds).
Additional electric infrastructure for combustion equipment (amendment to 2021 I
Junction box, continuous raceway to panel, reserved breaker space, and labeling “For future electric equipment” sized for equivalent electric load (Section C405.13 / equivalent residential; applies to alterations involving combustion equipment).§C405.13

Codes are amended regularly — verify current requirements with **The City of Northglenn Building Division (contracted services provided by SAFEbuilt) issues residential building permits.

text

What this covers

Detached or attached accessory dwelling on a Denver lot: foundation or module, envelope, and utility tie-in. Height and massing follow Denver bulk-plane and ADU rules for the zone; confirm with CPD before drawings freeze.

text

How the work is coordinated

A municipally licensed Denver general contractor coordinates licensed specialty trades for electrical and plumbing. Denver-metro work is permitted locally. Colorado has no statewide general-contractor license. Cities and counties license general contractors. DORA licenses electrical and plumbing (and similar regulated trades), not general contractors. Autotelic is a municipally licensed Denver general contractor that coordinates licensed specialty trades. Denver building permits run through Community Planning and Development (CPD). Costs are project-specific; no dollar figures.

Service Area

Serving Northglenn and Adams County

We serve Northglenn, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Northglenn project.

FAQ

Common questions

Is an ADU allowed on my lot?

It depends on your city’s zoning — lot size, setbacks, and parking rules vary across the metro. We run the zoning check as the first step and tell you what your lot supports before you spend money on design.

Do you handle ADU permits and inspections?

Yes — ADU permitting is municipal, and we manage zoning review, permit application, and every inspection through certificate of occupancy.

Detached, attached, or garage conversion — which is right?

Each has different zoning, cost, and site implications. We design all three and recommend based on your lot, budget, and how you plan to use the unit.

What does an ADU cost?

Getting a real answer costs less than most people expect: an ADU feasibility consultation is $350, and the full ADU feasibility package — zoning check, site analysis, and concept direction — is $950, both listed at fixed prices on our booking page. Construction cost depends on the path: garage and basement conversions reuse existing structure, while a detached backyard cottage is new construction from the foundation up. After feasibility we quote the build itself as a fixed-price proposal, so you know the number before work starts.

How long does an ADU project take?

Three phases run in sequence: design (site measure, concept, construction documents), permitting (zoning and building review, which move on the municipality’s calendar), then construction. Conversions generally move faster than detached new builds because the shell and foundation already exist. We lay out the phase-by-phase schedule in your proposal, and you track progress on our operations platform once work starts.

How small a lot can support an ADU?

Smaller than most people assume — many Front Range single-unit lots that owners write off can carry a detached unit, and each city sets its own minimum lot size, setbacks, and building coverage. Whether your district’s standards leave room for a backyard cottage — or point you toward a garage or basement conversion instead — is exactly what the feasibility check answers for your address.

What is the ADU permit process?

Two municipal reviews run in order: a zoning review confirming the unit fits your district’s standards, then a building permit review of the construction documents, with inspections during the build and a certificate of occupancy at the end. Colorado HB 24-1152 now requires most Front Range municipalities to allow ADUs on single-unit lots, and we confirm how your city implements it as the first step of feasibility.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Let's design your perfect ADU / Backyard Cottage together

Get a personalized estimate in about 2 minutes — no pressure, no obligation.

Licensed & Insured ContractorVeteran-Owned

How This Works (2 minutes)

  1. 1Tell us about your project (30 seconds)
  2. 2Answer a few quick questions for an accurate estimate (60 seconds)
  3. 3Get your personalized estimate instantly (30 seconds)

No pressure. No obligation. No spam calls. If we're not the right fit, we'll tell you — and even recommend someone who is.