autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

CASTLE ROCK SERVICES

ADU / Backyard Cottage in Castle Rock

Licensed ADU / backyard cottage services for Castle Rock and Douglas County. Build an income-producing unit in your backyard.

What Castle Rock requires

Code reference: Exempt work follows the Town’s adopted amendments to the 2024 International Residential Code (IRC) and International Building Code (IBC), per Ordinance No. 2026-017 (effective around June 30, 2026). Ord. No. 2026-017

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
ADU / Backyard Cottage

Build an income-producing unit in your backyard

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

ADU / Backyard Cottage Services in Castle Rock, Colorado

Autotelic provides professional ADU / backyard cottage services throughout Castle Rock and the surrounding Douglas County area. Accessory dwelling unit construction across the Denver metro — detached new builds, garage conversions, and basement conversions compliant with Colorado HB 24-1152. One veteran-owned design-build team runs the full Denver sequence under a single contract: zoning verification and concept design, municipal zoning and building permit reviews, then construction and inspections through certificate of occupancy. Whether you're in Castle Rock (Douglas County seat) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Castle Rock permit thresholds

Code reference
Exempt work follows the Town’s adopted amendments to the 2024 International Residential Code (IRC) and International Building Code (IBC), per Ordinance No. 2026-017 (effective around June 30, 2026).Ord. No. 2026-017
Code reference
One-story detached accessory non-habitable structures (tool sheds, playhouses, etc.) ≤ 120 sq ft, ≥ 10 ft from the nearest occupiable structure.
Code reference
Fences ≤ 6 ft high (swimming pool barriers of any height are *not* exempt).
Code reference
Shingle repair or replacement not exceeding one square (100 sq ft) of covering per building.
Code reference
The adopted codes (2024 IRC/IBC and related) govern when alterations trigger permitting.
Code reference
See Title 15 of the Castle Rock Municipal Code (and amendments in Ordinance 2026-017) for the full adopted code language on work exempt from permit (primarily amending IRC R105.2 and equivalent IBC sections).Ord. 2026-017
Building use tax
5.2% applied to 50% of the project’s valuation (materials estimated at half the valuation).
Code reference
This comprises the Town’s 4.2% use tax rate + Douglas County’s 1% use tax rate.
Ord. No. 2026-017Source: crgov.com

Codes are amended regularly — verify current requirements with **The Town of Castle Rock Building Division (part of Development Services) issues residential building permits within the town limits.

Zoning & ADU

Castle Rock zoning & ADU quick facts

R-1 — Minimum Lot Area
9000 sfR-1
R-1 — Minimum Lot Width
75'R-1
R-1 — Front Setback (min)
25'R-1
R-1 — Side Interior Setback (min)
7'R-1
R-1 — Side Setback Abutting Street (min)
25'R-1
R-1 — Rear Setback (min)
25'R-1
R-1 — Building Height (max)
35'R-1
R1 — Front Setback (min)
25'R1
Castle Rock Municipal Code Title 17 (Ord. 2019-028; current through Jun 26, 2026) R-1 setback standards (17.18.040 / 17.22.040 / 17.24.040 Development standards) — effective 2019-09-17 · Castle Rock Municipal Code Title 17 (Ord. 2019-028; current through Jun 26, 2026) R1 setback standards (17.18.040 / 17.22.040 / 17.24.040 Development standards) — effective 2019-09-17Source: library.municode.com

Codes are amended regularly — verify current requirements with **The Town of Castle Rock Building Division (part of Development Services) issues residential building permits within the town limits.

A recent build

Backyard ADU in Denver

Denver · 2026

Status
Under construction — 2026
Managed on
Buildbot — Autotelic’s own PM platform
  • Architecture, site plans, and full MEP design completed in-house
  • Permits pulled — electric and plumbing rough-ins permitted and underway
  • Spray-foam insulation and exterior work in progress
  • First project managed end-to-end on Buildbot, Autotelic’s construction-PM platform

A ground-up backyard ADU in Denver — designed, permitted, and now under construction by Autotelic, and the first project managed end-to-end on Buildbot, Autotelic’s own construction-management platform.

Energy Code

Castle Rock energy code quick facts

Code reference
2021 International Energy Conservation Code (IECC), with local amendments, as adopted by Ordinance No. 2026-017 (adopted June 2, 2026; effective June 30, 2026), along with the Colorado Model Electric-Ready and Solar-Ready Code.Ord. No. 2026-017
Code reference
This applies to Castle Rock (Douglas County, Climate Zone 5B).
Code reference
The adoption aligns with state requirements for jurisdictions updating other building codes by the June 30, 2026 deadline.
Code reference
Specific local numeric amendments to prescriptive requirements (e.g., R-values, U-factors, or air-sealing thresholds for remodels/additions) are not detailed in publicly available sources beyond references to the base 2021 IECC tables/sections (such as Table R402.1.2 for insulation/fenestration and
Code reference
The adopting ordinance incorporates the 2021 IECC by reference with amendments thereto but does not appear to alter the core prescriptive values in available excerpts.
Ord. No. 2026-017Source: crgov.com

Codes are amended regularly — verify current requirements with **The Town of Castle Rock Building Division (part of Development Services) issues residential building permits within the town limits.

text

What this covers

Detached or attached accessory dwelling on a Denver lot: foundation or module, envelope, and utility tie-in. Height and massing follow Denver bulk-plane and ADU rules for the zone; confirm with CPD before drawings freeze.

text

How the work is coordinated

A municipally licensed Denver general contractor coordinates licensed specialty trades for electrical and plumbing. Denver-metro work is permitted locally. Colorado has no statewide general-contractor license. Cities and counties license general contractors. DORA licenses electrical and plumbing (and similar regulated trades), not general contractors. Autotelic is a municipally licensed Denver general contractor that coordinates licensed specialty trades. Denver building permits run through Community Planning and Development (CPD). Costs are project-specific; no dollar figures.

Service Area

Serving Castle Rock and Douglas County

We serve Castle Rock, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Castle Rock project.

FAQ

Common questions

Is an ADU allowed on my lot?

It depends on your city’s zoning — lot size, setbacks, and parking rules vary across the metro. We run the zoning check as the first step and tell you what your lot supports before you spend money on design.

Do you handle ADU permits and inspections?

Yes — ADU permitting is municipal, and we manage zoning review, permit application, and every inspection through certificate of occupancy.

Detached, attached, or garage conversion — which is right?

Each has different zoning, cost, and site implications. We design all three and recommend based on your lot, budget, and how you plan to use the unit.

What does an ADU cost?

Getting a real answer costs less than most people expect: an ADU feasibility consultation is $350, and the full ADU feasibility package — zoning check, site analysis, and concept direction — is $950, both listed at fixed prices on our booking page. Construction cost depends on the path: garage and basement conversions reuse existing structure, while a detached backyard cottage is new construction from the foundation up. After feasibility we quote the build itself as a fixed-price proposal, so you know the number before work starts.

How long does an ADU project take?

Three phases run in sequence: design (site measure, concept, construction documents), permitting (zoning and building review, which move on the municipality’s calendar), then construction. Conversions generally move faster than detached new builds because the shell and foundation already exist. We lay out the phase-by-phase schedule in your proposal, and you track progress on our operations platform once work starts.

How small a lot can support an ADU?

Smaller than most people assume — many Front Range single-unit lots that owners write off can carry a detached unit, and each city sets its own minimum lot size, setbacks, and building coverage. Whether your district’s standards leave room for a backyard cottage — or point you toward a garage or basement conversion instead — is exactly what the feasibility check answers for your address.

What is the ADU permit process?

Two municipal reviews run in order: a zoning review confirming the unit fits your district’s standards, then a building permit review of the construction documents, with inspections during the build and a certificate of occupancy at the end. Colorado HB 24-1152 now requires most Front Range municipalities to allow ADUs on single-unit lots, and we confirm how your city implements it as the first step of feasibility.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Let's design your perfect ADU / Backyard Cottage together

Get a personalized estimate in about 2 minutes — no pressure, no obligation.

Licensed & Insured ContractorVeteran-Owned

How This Works (2 minutes)

  1. 1Tell us about your project (30 seconds)
  2. 2Answer a few quick questions for an accurate estimate (60 seconds)
  3. 3Get your personalized estimate instantly (30 seconds)

No pressure. No obligation. No spam calls. If we're not the right fit, we'll tell you — and even recommend someone who is.