(720) 287-7958

DESIGN · BUILD · AUTOMATE

GREENWOOD VILLAGE SERVICES

Kitchen Remodel in Greenwood Village

Kitchen Remodel Design Consultation$250

Licensed kitchen remodel services for Greenwood Village and Arapahoe County. The kitchen your home deserves.

What Greenwood Village requires

Code reference: (IECC 2018, Table R402.1.2) IECC 2018

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Kitchen Remodel

The kitchen your home deserves

Book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • Kitchen Remodel Design Consultation

    A 90-minute in-home working session on layout, finishes, and budget for your kitchen remodel.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    A 90-minute in-home working session on layout, finishes, and budget for your kitchen remodel. You walk away with a written scope summary and a realistic local cost range.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Kitchen Remodel Services in Greenwood Village, Colorado

Autotelic provides professional kitchen remodel services throughout Greenwood Village and the surrounding Arapahoe County area. Custom kitchen remodels across the Denver metro featuring cabinetry, stone countertops, smart appliances, and integrated lighting design. Commercially licensed and insured. Whether you're in Greenwood Village (Denver Tech Center) or nearby communities, our team delivers quality workmanship, licensed and insured.

A recent build

Full-home remodel after a burst pipe

Denver metro

Trigger
Burst waterline → insurance claim
Structure
Bearing wall out, flush beam in
Master bath
Curbless wet room, tub-in-shower
Result
Sold at a profit at resale
  • Insurance-claim restoration folded into a full remodel design
  • Kitchen remodel opening to the dining space
  • Living/dining bearing wall removed — flush beam, no soffit
  • Master bath expanded into a curbless wet room — shower and soaking tub in one glass enclosure
  • Second full bath remodeled
  • New flooring throughout the home

A burst waterline flooded the home while the owners were away, triggering an insurance claim for floors and drywall. Rather than a like-for-like patch, the claim was folded into a full remodel — kitchen, two baths, a bearing wall removed for an open living/dining plan, a curbless wet-room master bath, and new floors throughout. The owners invested beyond the claim, and the home sold at a profit a few years later.

Dining and living as one open space after the bearing wall came out
Living room opening to the sunroom bar
White kitchen island under the vaulted window wall
New flooring running through the main level
Master bath wet room — glass enclosure with marble shower
Second bath with patterned tile and navy vanity

Permit Thresholds

Greenwood Village permit thresholds

Code reference
The city operates under the 2018 International Residential Code (IRC) and other 2018 International Codes, along with the 2023 National Electrical Code (NEC) standards.
Code reference
Concrete or asphalt work exceeding 100 square feet
Code reference
Re-roofs/Repairs involving the removal of 25% or more of the decking
Code reference
Landscaping or grading that is more than 10 feet from a property line, not within a drainage easement, involves less than 500 square feet of disturbed area, and less than 10 cubic yards of earthwork
Code reference
Re-roofing that only involves laying new shingles and patching unsound decking (less than 25% of decking removal)
Snow loads
30 lbs.
Ultimate wind speed
120 mph (Basic Design) and nominal: 93 mph (allowable stress design)
Frost depth
36 inches

Codes are amended regularly — verify current requirements with **The City of Greenwood Village (specifically its Community Development Department / Building Division) issues residential building permits.

Energy Code

Greenwood Village energy code quick facts

Code reference
Greenwood Village, Colorado, has adopted the 2018 International Energy Conservation Code (IECC) as its energy code.
Code reference
There is no indication of a specific "Greenwood Green Code" or "Energize Denver" equivalent adopted by Greenwood Village; however, Colorado state law requires local jurisdictions to adopt and enforce the 2021 IECC and the Colorado Model Electric Ready and Solar Ready Code upon updating any other bui
Code reference
The adopting ordinance for the 2018 IECC is referenced on the Greenwood Village Official Website under "Adopted Codes & Manuals" and "Fee Schedule," stating that the 2018 International Energy Conservation Code is currently in effect.
Code reference
Given that Greenwood Village operates under the 2018 IECC and is in Climate Zone 5B, the following are key prescriptive requirements for residential construction, generally applicable to remodels and additions when the scope of work includes these elements:
Code reference
While specific local amendments to the 2018 IECC would need to be thoroughly reviewed within the Greenwood Village Municipal Code, the general prescriptive requirements for Climate Zone 5B from the 2018 IECC (which Greenwood Village has adopted) are as follows:
Ceiling Insulation (Attic)
R-49.
Code reference
(IECC 2018, Table R402.1.2)IECC 2018
Wood Frame Wall Insulation
R-20 continuous insulation (c.i.) or R-13 + R-5 c.i.
IECC 2018

Codes are amended regularly — verify current requirements with **The City of Greenwood Village (specifically its Community Development Department / Building Division) issues residential building permits.

text

What a kitchen remodel usually includes

A residential kitchen remodel in the Denver metro can mean new cabinets and counters in the existing layout, or a full gut that relocates the sink, dishwasher, range, lighting, and openings to adjacent rooms. Scope commonly covers demolition, plumbing and electrical rough-in when utilities move, cabinetry, countertops, backsplash, flooring transitions, lighting, and finish trim. A municipally licensed Denver general contractor coordinates the overall remodel and the licensed specialty trades required for plumbing, electrical, gas, and related work. Cost is project-specific and depends on whether utilities move, structural openings, finish selections, and access.

text

Layout decisions that change the build

Keeping fixtures in place usually shortens rough-in and inspection scope. Moving a sink, adding an island with water or power, or opening a wall into the living space adds plumbing, electrical, and sometimes structural work. Island plans should confirm floor structure, receptacle needs, and whether a sink or dishwasher will be included. Lock cabinet and counter selections early enough to drive rough dimensions before drywall closes. Long-lead materials often set the critical path after demolition.

Service Area

Serving Greenwood Village and Arapahoe County

We serve Greenwood Village, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Greenwood Village project.

FAQ

Common questions

How much does Kitchen Remodel Design Consultation cost in Greenwood Village?

$250.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Do I need a permit to remodel my kitchen?

Usually yes — any work touching plumbing, electrical, or structure needs a permit from your city or county building department. Permitting in Colorado is municipal, and we handle the application and inspections as part of the project.

How does the estimate work?

Tell us about your kitchen through the form or a call. Use the Instant Estimate tool for a real, scored estimate in about two minutes — free, and without a pushy sales visit.

Do you handle design as well as construction?

Yes — we are a design-build contractor, so layout, materials, cabinetry, and trades coordination run through one team from drawings to final walk-through.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY