(720) 287-7958

DESIGN · BUILD · AUTOMATE

CHERRY HILLS VILLAGE SERVICES

Pop-Top Addition in Cherry Hills Village

Home Addition Feasibility Consultation, $300

See all 2 jobs

Licensed pop-top addition services for Cherry Hills Village and Arapahoe County. Go up, not out — add a full second story.

What Cherry Hills Village requires

Code reference: ### Exempt Work (Cherry Hills Village Municipal Code Section 105.2, referencing adopted I-Codes) §105.2

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Pop-Top Addition

Go up, not out — add a full second story

Jobs you can book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • Home Addition Feasibility Consultation

    We evaluate structure, lot coverage, and zoning for a proposed addition and discuss realistic options.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    We evaluate structure, lot coverage, and zoning for a proposed addition and discuss realistic options. Includes a one-page feasibility summary with a preliminary budget range.

  • Addition Feasibility Package

    Structural walkthrough, lot coverage and zoning check, and a massing sketch for your proposed addition.

    $425 deposit to book, the rest when the work is done · morning (8–12) or afternoon (12–4)

    What's included

    Structural walkthrough, lot coverage and zoning check, and a massing sketch for your proposed addition. Delivered as a written feasibility report with a preliminary construction budget.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Pop-Top Addition Services in Cherry Hills Village, Colorado

Autotelic provides professional pop-top addition services throughout Cherry Hills Village and the surrounding Arapahoe County area. Pop-top second-story additions across the Denver metro — add bedrooms, bathrooms, and living space without expanding your footprint. Structural engineering included. Whether you're in Cherry Hills Village (affluent south Denver) or nearby communities, our team delivers quality workmanship, licensed and insured.

Permit Thresholds

Cherry Hills Village permit thresholds

Code reference
The Village adopted the 2024 International Codes (I-Codes) at the beginning of 2026, including the 2024 International Residential Code (IRC), and adheres to Chapter 18 of the Cherry Hills Village Municipal Code for building regulations.
Code reference
If an addition is more than 50% of the existing square footage, or if the aggregate floor area is demolished or reconstructed by more than 50%, or increased by 50% or more, the project is considered "redevelopment" and may have additional submittal and drainage requirements per Chapter 9 of the zoni
Code reference
Any electrical work on 400 amps (320 continuous) or greater requires a separate plan review.
Impervious Surface
If more than 2,500 square feet of impervious surface is added cumulatively (e.g., house addition, driveway, patio), a Phase III Drainage Plan is required.
Code Reference
Cherry Hills Village Municipal Code, Chapter 18, and the adopted 2024 International Residential Code.
Code reference
### Exempt Work (Cherry Hills Village Municipal Code Section 105.2, referencing adopted I-Codes)§105.2
Code reference
One-story detached, prefabricated storage sheds that do not exceed 120 square feet.
Code Reference
Cherry Hills Village Municipal Code, Section 105.2, referencing adopted I-Codes.§105.2
§105.2

Codes are amended regularly — verify current requirements with **The City of Cherry Hills Village (specifically its Building Division under Community Development) issues residential building permits.

Zoning & ADU

Cherry Hills Village zoning & ADU quick facts

Code reference
Cherry Hills Village, Colorado's zoning regulations for single-family residential districts (R-1, R-2, R-3, R-3A, R-4, and R-5) include specific numeric development standards for additions, Accessory Dwelling Units (ADUs), and garages.
R-1, R-2, R-3, R-3A Residential Districts
35 feet
R-4, R-5 Residential Districts
30 feet
Permitted
ADUs are permitted in any part of the City where single-family homes are allowed, via an administrative approval process, effective after June 30, 2025.
Code reference
Arapahoe County, which includes Cherry Hills Village, also permits both attached and detached ADUs in all agricultural and most residential zoning districts on lots that are at least 5,000 square feet.
Max Size
Between 500 and 800 square feet.
Code reference
For lots under 19 acres in urban areas, Arapahoe County regulations allow ADUs with up to two bedrooms, with square footage limitations based on lot size and/or the size of the principal dwelling.
Off-Street Parking Areas (including garages)
Shall be set back 20 feet from residential lot lines.

Codes are amended regularly — verify current requirements with **The City of Cherry Hills Village (specifically its Building Division under Community Development) issues residential building permits.

Energy Code

Cherry Hills Village energy code quick facts

Code reference
Cherry Hills Village, Colorado, has adopted the 2024 International Energy Conservation Code (IECC).
Code reference
However, state law requires local jurisdictions to adopt and enforce the 2021 International Energy Conservation Code (IECC) and the Colorado Model Electric Ready and Solar Ready Code when updating any other building code, with amendments not permitted to decrease effectiveness or energy efficiency.
Code reference
An ordinance (Ordinance No. 2023, Series 1) also indicates the adoption of the 2021 International Energy Conservation Code.Ord. No. 2023
Code reference
Cherry Hills Village is located in IECC Climate Zone 5B.
Code reference
The following are key prescriptive requirements for residential remodels and additions, based on the 2021 IECC for Climate Zone 5B, which serve as minimum standards under the adopted energy code:
Code reference
### Key Prescriptive Requirements for Remodels/Additions (2021 IECC, Climate Zone 5B)
Requirement
R-49 minimum, with an R-60 retrofit recommended.
Code reference
The 2021 IECC raised the prescriptive ceiling to R-60, with R-49 acceptable only with a raised-heel truss (per IECC R402.2.1).
Ord. No. 2023

Codes are amended regularly — verify current requirements with **The City of Cherry Hills Village (specifically its Building Division under Community Development) issues residential building permits.

text

What a pop-top covers

A pop-top in the Denver metro raises or replaces the roof on the existing footprint to add a story or habitable attic. Walls usually stay; massing and bulk plane control the envelope. The existing foundation still has to take the new loads. A municipally licensed Denver general contractor coordinates the project, design professionals, and licensed specialty trades. Cost is project-specific and depends on roof structure, stairs, and how much of the first floor is opened.

text

Bulk plane, height, and landmarks

Zoning height is measured in feet and stories from the front and rear base planes (DZC Sec. 13.1.2). Plans must show allowed versus proposed bulk plane, including roof overhangs. If the existing house already breaks height or bulk rules, elevations should distinguish retained structure from new work. Landmark Preservation lists pop-top/rooftop additions as a review type; designated properties need Landmark approval before zoning or building permits.

text

What buyers should prepare

Target rooms, roof and attic photos, known foundation issues, and landmark or historic-district status.

FAQ

Common questions

How much does Home Addition Feasibility Consultation cost in Cherry Hills Village?

$300.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Is a pop-top different from a second-story addition?

A pop-top usually stays on the existing footprint and is controlled by bulk plane. A second-story addition may also expand walls. Both need structural review in Denver.

Who handles pop-top permits and licensing?

A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.

Do historic houses need extra review?

Yes. Landmark lists pop-top/rooftop additions. Approval comes before zoning and building permits on designated properties.

What information helps define scope?

Desired rooms, roof photos, landmark status, and city or county.

Service Area

Serving Cherry Hills Village and Arapahoe County

We serve Cherry Hills Village, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Cherry Hills Village project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY