autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

BROOMFIELD SERVICES

Pop-Top Addition in Broomfield

Licensed pop-top addition services for Broomfield and Broomfield County. Go up, not out — add a full second story.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Pop-Top Addition

Go up, not out — add a full second story

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Pop-Top Addition Services in Broomfield, Colorado

Autotelic provides professional pop-top addition services throughout Broomfield and the surrounding Broomfield County area. Pop-top second-story additions across the Denver metro — add bedrooms, bathrooms, and living space without expanding your footprint. Structural engineering included. Whether you're in Broomfield (city and county between Denver and Boulder) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Broomfield permit thresholds

Code reference
Permits and inspections verify compliance with adopted codes (primarily the 2024 International Residential Code and related codes via Ordinance 2295, effective April 15, 2026, under Title 15 / Chapter 15-03 of the Broomfield Municipal Code).Ordinance 2295
Use tax (not collapsed into a single rate)
Broomfield collects use tax of 4.15% applied to 50% of the total project valuation (assumed materials portion) at permit issuance for building materials.
Code reference
Use tax of 4.15% is also charged on 50% of site work valuation (e.g., landscaping, patios) per BMC §§ 3-08-040 and 3-08-060; exemptions are in BMC § 3-08-050.§ 3-08-040
Code reference
All information derives from Broomfield’s official Building Division resources and municipal code references (Title 15, Chapter 15-03, and use tax chapter 3-08).

Codes are amended regularly — verify current requirements with **The City and County of Broomfield (specifically its Building Division in the Community Development Department) issues residential building permits.

Zoning & ADU

Broomfield zoning & ADU quick facts

Code reference
ADUs are permitted in all zoning districts allowing single-family residential uses as a principal use (including the most common single-family districts such as R-1 Low-Density Residential District, Chapter 17-14), per 17-32-160 as amended by Ordinance 2265 (2025). One ADU per lot is allowed.Ordinance 2265
ADU maximum size (applies across these districts)
Up to 500 square feet, or 50% of the principal dwelling unit’s footprint (excluding garage, porch, or similar areas), or 800 square feet, whichever is less (per city implementation of 17-32-160).
Lot coverage, building height, and principal/accessory setbacks
These are specified individually in each district chapter (e.g., Chapter 17-14 for R-1 and related chapters such as 17-12 for E-2 Estate District or 17-09 for RR Rural Residential).
Code reference
Specific numeric standards (such as maximum lot coverage percentages or maximum building heights) are not detailed in publicly summarized sources or recent ordinances reviewed; they must be confirmed directly from the applicable district section in Title 17 of the Broomfield Municipal Code for the esection in

Codes are amended regularly — verify current requirements with **The City and County of Broomfield (specifically its Building Division in the Community Development Department) issues residential building permits.

Energy Code

Broomfield energy code quick facts

Code reference
Broomfield, Colorado (climate zone 5B), has adopted the 2024 International Energy Conservation Code (IECC) as amended by the Colorado Model Low Energy and Carbon Code (MLECC/LECC), via Ordinance 2295 (effective April 15, 2026, for permits issued on or after that date).Ordinance 2295
Code reference
This replaces the prior 2021 IECC cycle.
Key prescriptive or related requirements relevant to remodels/additions (drawn f
Key prescriptive or related requirements relevant to remodels/additions (drawn from the adopted 2024 IECC + MLECC framework; specific numeric envelope values like R-values or U-factors follow the base 2024 IECC tables for zone 5B unless further amended locally, with emphasis on performance/credits,
Air leakage/ testing thresholds (R402.5.1.3 or equivalent in MLECC amendments)
Maximum air leakage rates vary by climate zone and compliance path (e.g., prescriptive or ERI); testing required for many additions/alterations affecting the envelope.
Electric-ready requirements (new Section R409/C410 in MLECC, integrated with pri
Dedicated branch circuits, appropriately sized panel space, labeling, and condensate drainage provisions for future electrification of space heating, water heating, cooking, and clothes drying where combustion equipment is present (applies to alterations adding or replacing such systems).Section R409
Solar-ready zone (R409/C410 in MLECC)
Designated solar-ready roof zone with construction document specifications for single-family, townhomes, and certain multifamily (applies to new roofs or major roof work in remodels/additions).
EV-ready spaces (R409/C410 in MLECC, with local amendment)
Conduit/raceway, panel capacity, wiring, and overcurrent protection for future EV charging; local amendment adjusts thresholds (e.g., for smaller lots) and requires at least 20% or a minimum of 2 spaces EV-ready in certain commercial contexts.
Energy efficiency credits (R408/C406 in MLECC)
Additional credits required based on conditioned floor area, occupancy, climate zone (5B), and combustion vs.

Codes are amended regularly — verify current requirements with **The City and County of Broomfield (specifically its Building Division in the Community Development Department) issues residential building permits.

text

What a pop-top covers

A pop-top in the Denver metro raises or replaces the roof on the existing footprint to add a story or habitable attic. Walls usually stay; massing and bulk plane control the envelope. The existing foundation still has to take the new loads. A municipally licensed Denver general contractor coordinates the project, design professionals, and licensed specialty trades. Cost is project-specific and depends on roof structure, stairs, and how much of the first floor is opened.

text

Bulk plane, height, and landmarks

Zoning height is measured in feet and stories from the front and rear base planes (DZC Sec. 13.1.2). Plans must show allowed versus proposed bulk plane, including roof overhangs. If the existing house already breaks height or bulk rules, elevations should distinguish retained structure from new work. Landmark Preservation lists pop-top/rooftop additions as a review type; designated properties need Landmark approval before zoning or building permits.

text

Permits and who coordinates the work

City and County of Denver Community Planning and Development treats pop-tops like other second-story or attic work: structural review and a sealed structural-integrity letter from a design professional who inspected the existing foundation (DBCA 133.3), plus zoning, building, and typically SUDP. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades plus the design professionals required for the project.

text

What buyers should prepare

Target rooms, roof and attic photos, known foundation issues, and landmark or historic-district status.

FAQ

Common questions

Is a pop-top different from a second-story addition?

A pop-top usually stays on the existing footprint and is controlled by bulk plane. A second-story addition may also expand walls. Both need structural review in Denver.

Who handles pop-top permits and licensing?

A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.

Do historic houses need extra review?

Yes. Landmark lists pop-top/rooftop additions. Approval comes before zoning and building permits on designated properties.

Will the existing foundation work?

Only after a design professional inspects it. CPD asks for a sealed structural-integrity letter for second-story and attic work.

What information helps define scope?

Desired rooms, roof photos, landmark status, and city or county.

Service Area

Serving Broomfield and Broomfield County

We serve Broomfield, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Broomfield project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Let's design your perfect Pop-Top Addition together

Get a personalized estimate in about 2 minutes — no pressure, no obligation.

Licensed & Insured ContractorVeteran-Owned

How This Works (2 minutes)

  1. 1Tell us about your project (30 seconds)
  2. 2Answer a few quick questions for an accurate estimate (60 seconds)
  3. 3Get your personalized estimate instantly (30 seconds)

No pressure. No obligation. No spam calls. If we're not the right fit, we'll tell you — and even recommend someone who is.