autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

LITTLETON SERVICES

Pop-Top Addition in Littleton

Licensed pop-top addition services for Littleton and Arapahoe County. Go up, not out — add a full second story.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Pop-Top Addition

Go up, not out — add a full second story

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Pop-Top Addition Services in Littleton, Colorado

Autotelic provides professional pop-top addition services throughout Littleton and the surrounding Arapahoe County area. Pop-top second-story additions across the Denver metro — add bedrooms, bathrooms, and living space without expanding your footprint. Structural engineering included. Whether you're in Littleton (historic downtown Littleton) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permits & Licensing

Permits in Littleton

Littleton building permits are issued by the Community Development Department's Building Division and Permit Center, and a license or registration certificate is required to obtain permits for work within city limits. Applications, plan submittals, and inspection scheduling run through the eTRAKiT online system. Authority: City of Littleton — Community Development Department (Building Division / Permit Center).

Permit Thresholds

Littleton permit thresholds

Code reference
Littleton has adopted the 2024 International Residential Code (IRC) and other International Codes (with local amendments) under Littleton City Code Title 4, Building Regulations, Chapter 1.
Code reference
Standard IRC Section R105.2 exemptions typically apply (e.g., certain minor non-structural repairs, painting, or very small accessory structures), but Littleton provides no separate local valuation threshold below which permits are automatically waived for remodel/alteration work.Section R105.2
Code reference
Exempt work lists and structural triggers are governed by the adopted 2024 IRC (with amendments) and Littleton’s submittal policies.
Code reference
Minor cosmetic or non-structural work (e.g., painting, flooring replacement without affecting structure) is typically exempt under IRC R105.2.
Building permit fees follow a tiered schedule based on total valuation (e.g., $1
$25.85; higher tiers add incremental amounts per $100 or $1,000).
Code reference
Plan review fee is 65% of the permit fee(s) when blueprints/construction documents are reviewed.
Code reference
Use tax deposit = 0.01969 × total job valuation, calculated as ((total job valuation × 52.5%) × 3.75%).
Code reference
Arapahoe County Open Space Tax = 0.00125 × total valuation, calculated as ((total job valuation × 50%) × 0.25%).

Codes are amended regularly — verify current requirements with City of Littleton — Community Development Department (Building Division / Permit Center).

Zoning & ADU

Littleton zoning & ADU quick facts

Code reference
Littleton, CO uses its Unified Land Use Code (ULUC, Title 10) with neighborhood-specific residential districts regulated primarily in Chapter 10-4 (including Table 10-4-2.2 for lot/building standards such as minimum lot size/area, maximum height, minimum setbacks, and maximum building/lot coverage
Code reference
Exact numeric standards (lot coverage %, building height, setbacks) vary by specific district and are detailed in Table 10-4-2.2 and related sections; they are not uniformly listed across secondary sources with district codes.
ADU max size
Capped at the gross floor area of the main house or 1,000 square feet, whichever is less (recent ordinance updates raised prior limits, e.g., from 750 sq ft in some references).ordinance updates
Code reference
Specific rear/side setbacks for detached ADUs vary by district and type (e.g., often reduced in rear yard per district rules or state compliance); confirm via the city’s Zoning Portal or Table 10-4-2.2.
Code reference
All figures should be verified directly in the current ULUC (online.encodeplus.com) or via Littleton’s Zoning Portal for a specific parcel/district, as standards are district-specific and subject to updates (e.g., 2024–2025 ADU ordinances).
ordinance updatesSource: littletonco.gov

Codes are amended regularly — verify current requirements with City of Littleton — Community Development Department (Building Division / Permit Center).

Energy Code

Littleton energy code quick facts

Code reference
2024 IECC (residential and commercial provisions), as adopted by reference with amendments in Littleton City Code Title 4, Chapter 1 (Ordinance 11, Series 2025). The city also adopts the Colorado Model Electric Ready and Solar Ready Code (June 1, 2023 version).Ordinance 11
Code reference
Prescriptive R-values/U-factors are unchanged from the 2024 I-codes (no local reductions or increases).
Code reference
Littleton is in Climate Zone 5B.
Code reference
Alterations/additions to the building thermal envelope (new assemblies, modifications, or change-in-use) must generally meet the new-construction prescriptive requirements below; existing assemblies that are exposed but not modified may be insulated to the greatest extent possible without exceeding
Code reference
Some exceptions apply (e.g., storm windows, roof recovers) provided energy use is not increased (amended C503.2 / R503.1.1).
Ceiling/attic insulation
R-49 (or R-38 over 100% of the area if uncompressed R-38 extends over the wall top plate at eaves; limited reduction to R-30 allowed for certain roof/ceiling designs up to 500 sf or 20% of ceiling area).
Adopting reference/ordinance
2024 IECC Table R402.1.2 / IRC Table N1102.1.2 (as consolidated in city table, note b/c).
Wood-framed above-grade walls
R-20ci only, or R-13cav + R-10ci, or R-20cav + R-5ci, or R-30cav only.

Codes are amended regularly — verify current requirements with City of Littleton — Community Development Department (Building Division / Permit Center).

text

What a pop-top covers

A pop-top in the Denver metro raises or replaces the roof on the existing footprint to add a story or habitable attic. Walls usually stay; massing and bulk plane control the envelope. The existing foundation still has to take the new loads. A municipally licensed Denver general contractor coordinates the project, design professionals, and licensed specialty trades. Cost is project-specific and depends on roof structure, stairs, and how much of the first floor is opened.

text

Bulk plane, height, and landmarks

Zoning height is measured in feet and stories from the front and rear base planes (DZC Sec. 13.1.2). Plans must show allowed versus proposed bulk plane, including roof overhangs. If the existing house already breaks height or bulk rules, elevations should distinguish retained structure from new work. Landmark Preservation lists pop-top/rooftop additions as a review type; designated properties need Landmark approval before zoning or building permits.

text

Permits and who coordinates the work

City and County of Denver Community Planning and Development treats pop-tops like other second-story or attic work: structural review and a sealed structural-integrity letter from a design professional who inspected the existing foundation (DBCA 133.3), plus zoning, building, and typically SUDP. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades plus the design professionals required for the project.

text

What buyers should prepare

Target rooms, roof and attic photos, known foundation issues, and landmark or historic-district status.

FAQ

Common questions

Is a pop-top different from a second-story addition?

A pop-top usually stays on the existing footprint and is controlled by bulk plane. A second-story addition may also expand walls. Both need structural review in Denver.

Who handles pop-top permits and licensing?

A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.

Do historic houses need extra review?

Yes. Landmark lists pop-top/rooftop additions. Approval comes before zoning and building permits on designated properties.

Will the existing foundation work?

Only after a design professional inspects it. CPD asks for a sealed structural-integrity letter for second-story and attic work.

What information helps define scope?

Desired rooms, roof photos, landmark status, and city or county.

Service Area

Serving Littleton and Arapahoe County

We serve Littleton, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Littleton project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Let's design your perfect Pop-Top Addition together

Get a personalized estimate in about 2 minutes — no pressure, no obligation.

Licensed & Insured ContractorVeteran-Owned

How This Works (2 minutes)

  1. 1Tell us about your project (30 seconds)
  2. 2Answer a few quick questions for an accurate estimate (60 seconds)
  3. 3Get your personalized estimate instantly (30 seconds)

No pressure. No obligation. No spam calls. If we're not the right fit, we'll tell you — and even recommend someone who is.