autotelic.build

DESIGN · BUILD · AUTOMATE

ENGLEWOOD SERVICES

Pop-Top Addition in Englewood

Licensed pop-top addition services for Englewood and Arapahoe County. Go up, not out — add a full second story.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Pop-Top Addition

Go up, not out — add a full second story

Local Service

Pop-Top Addition Services in Englewood, Colorado

Autotelic provides professional pop-top addition services throughout Englewood and the surrounding Arapahoe County area. Pop-top second-story additions across the Denver metro — add bedrooms, bathrooms, and living space without expanding your footprint. Structural engineering included. Whether you're in Englewood (south central Denver metro) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Englewood permit thresholds

Code reference
In Englewood, Colorado, building permits for residential remodel work are generally required based on the specific type of work performed rather than a fixed valuation threshold. The City requires permits for most construction projects to ensure compliance with adopted building codes (including
Code reference
Repair of roofing or siding when the repaired area is less than 100 square feet.
Code reference
Decks under 200 square feet that are not attached to the house, do not serve an exit door, and are not more than 30 inches above grade (zoning approval still required).
Code reference
The City’s use tax rate is 3.80% applied to 50% of the project valuation (an estimate assuming 50% of valuation represents taxable construction materials).
Code reference
A reconciliation process is available post-project if actual materials differ from the 50% estimate.
Code reference
Relevant references include the City’s “To Permit or Not To Permit” guidance and the Sales, Use and Other Taxes page (with citations to EMC Title 4, Chapter 4 for sales/use tax rules).

Codes are amended regularly — verify current requirements with **The City of Englewood’s Building and Codes Division (part of the Community Development Department) issues residential building permits.

Zoning & ADU

Englewood zoning & ADU quick facts

Englewood, CO (most common single-family residential districts are the R-1 serie
R-1-A, R-1-B, R-1-C under the Unified Development Code/Title 16, adopted Sept.
Code reference
2023 with subsequent ADU amendments).
ADU permitted
Yes, in all residential zoning districts (including all R-1 districts); R-1 districts limited to no more than one ADU per lot.
Code reference
(Specific standards updated via Ordinance No. 30-2026 and related Title 16 amendments.)Ordinance No. 30-2026
ADU max size
Up to 800 sq ft if detached; if attached or internal to the principal building, equal to the building’s footprint.
ADU height
16 ft maximum, or 25 ft if placed above an operable garage.
ADU placement/setbacks
Restricted to the side or rear of the principal structure (or integrated); specific rear-yard or other setbacks governed by district standards or general accessory use rules in 16-4-4/16-4-5 (exact numeric values per district not extracted from primary code text in available sources).
Max lot coverage % and max building height (principal structures/garages/additio
Not located in primary sources reviewed (e.g., Chapter 4 Zone Districts & Uses / 16-4-5 District Performance Standards or the adopted UDC PDF); standards are district-specific and appear in tables for R-1-A/B/C (minimum lot sizes and graduated intensity noted, but numeric coverage/height values o
Ordinance No. 30-2026Source: englewoodco.gov

Codes are amended regularly — verify current requirements with **The City of Englewood’s Building and Codes Division (part of the Community Development Department) issues residential building permits.

Energy Code

Englewood energy code quick facts

Code reference
2024 International Energy Conservation Code (IECC), adopted by the City of Englewood with no specific local amendments detailed on the official building division page (effective for all permits submitted after May 31, 2026).
Code reference
This applies to the Denver-metro area (Climate Zone 5B).
Code reference
Key prescriptive requirements from the 2024 IECC (relevant to remodels/additions via the residential or existing-building provisions, e.g., R402 and related sections) include the following (standard base-code values, as no local amendments are specified):
Code reference
Vertical fenestration U-factor ≤ 0.28 (Table R402.1.2, Climate Zone 5 and Marine 4).
Code reference
Skylight U-factor ≤ 0.50 (Table R402.1.2, Climate Zone 5 and Marine 4).
Code reference
Air leakage ≤ 3.0 ACH50 at 50 Pa for detached one-family dwellings in Climate Zones 3–5 (or ≤ 0.27 cfm/ft² of enclosure area for smaller homes/attached units); testing required (R402.4.1.2).
Code reference
Additional common prescriptive envelope items (from 2024 IECC Tables R402.1.2/R402.1.3 for CZ 5) typically cover ceiling/attic, wall, and other assemblies, but exact R-values/U-factors should be verified directly from the adopted code edition as they involve trade-offs and footnotes.

Codes are amended regularly — verify current requirements with **The City of Englewood’s Building and Codes Division (part of the Community Development Department) issues residential building permits.

text

What a Pop-Top Addition Is

A pop-top addition removes the existing roof of a single-story home and builds a new full or partial second story above it. Livable square footage increases while the original footprint stays the same. In the Denver metro, this approach is common in established neighborhoods where side yards, rear yards, and lot coverage leave little room to expand outward. The work is a major structural renovation. It typically includes roof demolition, foundation and wall reinforcement, new second-floor framing, a new roof, staircase construction, utility extensions, and interior and exterior finishes that connect the new level to the original house.

text

Typical Scope of Work

Most Denver pop-tops move through these phases: 1. Demolition and temporary weatherproofing after roof and related ceiling or attic removal. 2. Structural evaluation and reinforcement of the existing foundation and load-bearing walls so they can carry the added story. Work may include extended footings, new piers and beams, or, less often, more extensive foundation replacement. A structural engineer designs this work. 3. New second-floor framing with dimensional lumber and engineered members such as I-joists and LVLs. 4. Enclosure with subfloor, walls, windows, doors, and a new roof system, with continuous weather protection. 5. HVAC, electrical, and plumbing extensions or upgrades to serve the new level and meet current codes. Existing HVAC equipment and electrical panels often need replacement or capacity upgrades. 6. Interior finishes (insulation, drywall, flooring, trim, paint) and exterior finishes chosen to match or complement the original architecture. 7. A new staircase linking the first and second floors. Design and permitting commonly take about 3 to 6 months. Active construction often runs about 5 to 7 months. Homeowners frequently need to leave the house during framing, which can last roughly 2 to 8 weeks.

text

Denver Permits, Zoning, and Codes

In Denver, pop-top additions are major residential projects reviewed by the City and County of Denver Community Planning and Development (CPD). Related permits and reviews commonly include building, zoning, electrical, plumbing, mechanical/HVAC, and demolition when significant tear-off is required. Properties in historic districts or with landmark status may also need Landmark Preservation Commission review, which can add design constraints and timeline. Zoning controls height, setbacks, and bulk plane. Many single-family zones allow roughly 30–35 feet of height, while some are limited to about 25 feet. Side and rear setbacks and the bulk-plane envelope can force the second story to step back even when the first floor already sits at a lot line. Historic overlays in neighborhoods such as Wash Park, Country Club, and parts of Capitol Hill can add roughly 4–10 weeks for design review. As of mid-2025, Denver’s adopted codes include the 2024 IRC/IBC family for building, mechanical, plumbing, fuel gas, and fire, with the 2021 IECC still used for energy compliance, plus local amendments. Plan review for major residential projects can be lengthy; recent timing for this class of work has been cited around many months, so early zoning verification and complete architectural and structural drawings matter. A municipally licensed Denver general contractor coordinates the project and the licensed specialty trades who pull and perform electrical, plumbing, and mechanical work under the approved plans and inspections.

text

Materials, Structure, and Systems

Second-story walls are commonly framed with 2x4 or 2x6 lumber. Floors and roofs often use engineered lumber for longer spans and tighter deflection control. Foundation reinforcement on older Denver homes may include extended concrete footings, new piers and beams, or helical piers where conditions require them. Exterior materials are usually selected to align with the existing house and neighborhood character—brick, stucco, wood, or fiber-cement siding, plus a new roof in asphalt, metal, or another system suited to the design. Energy-code insulation, efficient windows and doors, and a right-sized HVAC system are central because the home’s conditioned volume increases substantially. Utility rough-ins must be integrated with the existing systems rather than treated as a simple add-on.

text

What Buyers and Homeowners Should Evaluate

Before starting a pop-top—or buying a home that already has one—review structural documentation, closed permits, and zoning compliance for height, setbacks, and bulk plane. Confirm that foundation capacity was engineered for the second story and that framing, weather barrier, roofing, and finishes integrate cleanly with the original structure. Ask how HVAC capacity, ductwork, electrical service, and plumbing were addressed for the added load. Unpermitted or incomplete work creates inspection, insurance, and resale risk. Expect full-house disruption for a multi-month build, with relocation during open framing. Budget contingency is important because foundation conditions are often not fully known until the structure is opened; a meaningful share of projects need more reinforcement than first assumed. Choose a team with specific Denver pop-top experience, structural-engineer collaboration, and a clear process for design, CPD permitting, inspections, and change management. Neighborhood value ceilings still matter: more square footage helps only when the finished home fits local demand and scale.

FAQ

Common questions

How long does a Denver pop-top addition take?

Design and permitting often take about 3 to 6 months. Construction commonly runs about 5 to 7 months after permits, depending on scope, inspections, historic review, and weather. Framing is usually the most disruptive stretch and may require temporary relocation for several weeks.

Do I have to change the foundation to add a second story?

Often yes, at least in part. Many single-story foundations and walls were not designed for a full second story. A structural engineer evaluates capacity and specifies reinforcement such as extended footings, piers and beams, or other support. Some older homes need more extensive work once conditions are fully visible.

What zoning limits affect a pop-top in Denver?

Height limits, side and rear setbacks, and bulk-plane rules are the main constraints. Even when the first floor is legal, the second story may need to step in or change roof form to stay inside the allowed envelope. Historic districts can add exterior design review on top of standard zoning.

Who handles the trade permits and licensing on a pop-top?

A municipally licensed Denver general contractor coordinates the overall building permit process and project. Licensed specialty trades handle electrical, plumbing, and mechanical work and the related trade permits and inspections under current Denver codes.

Will we need a new HVAC system?

In most cases the existing system is not sized for the added second-story load. Plan on evaluation and, frequently, replacement or major upgrade of equipment and ductwork so both levels heat and cool evenly and meet code.

Can we stay in the house during construction?

Some early and late phases may allow limited occupancy, but the open-roof and framing period is generally not livable. Many households relocate for roughly 2 to 8 weeks during that window, and overall disruption can extend across the full multi-month build.

Service Area

Serving Englewood and Arapahoe County

We serve Englewood, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Englewood project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Let's design your perfect Pop-Top Addition together

Get a personalized estimate in about 2 minutes — no pressure, no obligation.

★★★★★
500+ Denver homeowners trust Autotelic
Licensed & Insured ContractorVeteran-OwnedTesla Certified

How This Works (2 minutes)

  1. 1Tell us about your project (30 seconds)
  2. 2Answer a few quick questions for an accurate estimate (60 seconds)
  3. 3Get your personalized estimate instantly (30 seconds)

No pressure. No obligation. No spam calls. If we're not the right fit, we'll tell you — and even recommend someone who is.