autotelic.build

DESIGN · BUILD · AUTOMATE

CENTENNIAL SERVICES

Pop-Top Addition in Centennial

Licensed pop-top addition services for Centennial and Arapahoe County. Go up, not out — add a full second story.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Pop-Top Addition

Go up, not out — add a full second story

Local Service

Pop-Top Addition Services in Centennial, Colorado

Autotelic provides professional pop-top addition services throughout Centennial and the surrounding Arapahoe County area. Pop-top second-story additions across the Denver metro — add bedrooms, bathrooms, and living space without expanding your footprint. Structural engineering included. Whether you're in Centennial (south Denver metro) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permits & Licensing

Permits in Centennial

Centennial building permits, inspections, and contractor license approvals are handled by the city's Building Division. Permits and contractor licenses must be applied for online through the city's Self-Service Portal, and we handle that process as part of every project. Authority: City of Centennial — Building Division.

Permit Thresholds

Centennial permit thresholds

Code reference
In Centennial, Colorado, building permits for residential remodel work are governed by the 2021 International Residential Code (IRC) Section R105 (adopted via Centennial Municipal Code Chapter 18 – Building Regulations, per Ordinance 2023-O-06 and related adoptions of the 2021 I-Codes).Section R105
Code reference
Typically exempt work (aligning with IRC R105.2 exemptions, with local application) includes:
Code reference
One-story detached accessory structures (e.g., sheds) ≤200 sq ft.
Code reference
Fences ≤7 ft high; retaining walls ≤4 ft high (measured from bottom of footing).
Code reference
Prefabricated swimming pools <24 inches deep.
Code reference
Window awnings projecting ≤54 inches.
Code reference
Decks ≤200 sq ft, ≤30 inches above grade, and not attached to the dwelling.
Use tax (not collapsed into a single rate)
City of Centennial Use Tax of 2.5% applied to the actual cost of materials, plus Arapahoe County Use Tax of 0.25% applied to the actual cost of materials.

Codes are amended regularly — verify current requirements with City of Centennial — Building Division.

Zoning & ADU

Centennial zoning & ADU quick facts

Code reference
Centennial, Colorado (Arapahoe County) Land Development Code (LDC, Chapter 12 of the Municipal Code) governs zoning. New districts were adopted in 2024; the city’s zoning descriptions page notes that details should be verified in the current LDC (Municode).
Code reference
The most commonly referenced single-family residential districts for established neighborhoods are the Neighborhood Conservation (NC) subdistricts (NC5, NC6, NC9, NC12, NC18); newer or redevelopment areas use Suburban Residential (RS), Auto-Urban Residential (RA), and Urban Residential (RU).
Code reference
Residential development standards in RS/RA/RU/AG/NI generally reference LDC Division 3-4 (Residential Neighborhood Development Standards) and Division 3-5 (Housing Palette); non-residential summaries on the city site are not directly applicable to single-family additions/ADUs/garages.
ADU permitting (LDC § 12-3-603(H) and related sections)
Yes, permitted as an accessory use in AG, RS, RA, RU, NC (all subdistricts), and NI districts (plus limited commercial districts on single-family lots only).§ 12-3-603
ADU max size (LDC § 12-3-603(H))
≤ 50% of the principal dwelling’s footprint (exterior wall polygon on the ground), or the full existing attic or basement area (including internal stairwell) without any expansion of those spaces.§ 12-3-603
ADU height (LDC § 12-3-204 and § 12-3-603(H))
Attached/interior: same as the primary dwelling in the district.§ 12-3-204
Detached
17 ft maximum.
ADU setbacks (LDC § 12-3-301 and Table 12-3-301)
Same minimum setbacks as principal structures in the underlying district (no reduction allowed).§ 12-3-301

Codes are amended regularly — verify current requirements with City of Centennial — Building Division.

Energy Code

Centennial energy code quick facts

Code reference
Centennial, Colorado, has adopted the 2018 IECC (with the 2021 I-Codes package) as its energy code, with no mention of Denver-specific overlays such as the Denver Green Code or Energize Denver.
Code reference
This is enforced by the City’s Building Division under Ordinance No. 2023-O-06 (adopting the referenced codes by reference, effective as part of the 2021/2023 code update package).Ordinance No. 2023-O-06
Code reference
Centennial is in Climate Zone 5B.
Code reference
The code applies to alterations, additions, and remodels per IECC Chapter 5 (existing buildings), with the prescriptive requirements of Chapter 4 (or equivalent U-factor/UA paths) generally applying to new or modified portions of the thermal envelope.
Code reference
Key prescriptive requirements relevant to remodels/additions (drawn from 2018 IECC Table R402.1.2 and related sections for CZ 5; these are the base code values with no local amendments identified that alter them):
Ceiling/attic insulation
Minimum R-49 (or equivalent U-factor ≤ 0.026).
Adopting reference
2018 IECC R402.1.2 (Table R402.1.2).
Wood-frame wall insulation
R-20 cavity or R-13 cavity + R-5 continuous insulation (or equivalent U-factor ≤ 0.060).
Ordinance No. 2023-O-06Source: centennialco.gov

Codes are amended regularly — verify current requirements with City of Centennial — Building Division.

text

What a Pop-Top Addition Is

A pop-top addition removes the existing roof of a single-story home and builds a new full or partial second story above it. Livable square footage increases while the original footprint stays the same. In the Denver metro, this approach is common in established neighborhoods where side yards, rear yards, and lot coverage leave little room to expand outward. The work is a major structural renovation. It typically includes roof demolition, foundation and wall reinforcement, new second-floor framing, a new roof, staircase construction, utility extensions, and interior and exterior finishes that connect the new level to the original house.

text

Typical Scope of Work

Most Denver pop-tops move through these phases: 1. Demolition and temporary weatherproofing after roof and related ceiling or attic removal. 2. Structural evaluation and reinforcement of the existing foundation and load-bearing walls so they can carry the added story. Work may include extended footings, new piers and beams, or, less often, more extensive foundation replacement. A structural engineer designs this work. 3. New second-floor framing with dimensional lumber and engineered members such as I-joists and LVLs. 4. Enclosure with subfloor, walls, windows, doors, and a new roof system, with continuous weather protection. 5. HVAC, electrical, and plumbing extensions or upgrades to serve the new level and meet current codes. Existing HVAC equipment and electrical panels often need replacement or capacity upgrades. 6. Interior finishes (insulation, drywall, flooring, trim, paint) and exterior finishes chosen to match or complement the original architecture. 7. A new staircase linking the first and second floors. Design and permitting commonly take about 3 to 6 months. Active construction often runs about 5 to 7 months. Homeowners frequently need to leave the house during framing, which can last roughly 2 to 8 weeks.

text

Denver Permits, Zoning, and Codes

In Denver, pop-top additions are major residential projects reviewed by the City and County of Denver Community Planning and Development (CPD). Related permits and reviews commonly include building, zoning, electrical, plumbing, mechanical/HVAC, and demolition when significant tear-off is required. Properties in historic districts or with landmark status may also need Landmark Preservation Commission review, which can add design constraints and timeline. Zoning controls height, setbacks, and bulk plane. Many single-family zones allow roughly 30–35 feet of height, while some are limited to about 25 feet. Side and rear setbacks and the bulk-plane envelope can force the second story to step back even when the first floor already sits at a lot line. Historic overlays in neighborhoods such as Wash Park, Country Club, and parts of Capitol Hill can add roughly 4–10 weeks for design review. As of mid-2025, Denver’s adopted codes include the 2024 IRC/IBC family for building, mechanical, plumbing, fuel gas, and fire, with the 2021 IECC still used for energy compliance, plus local amendments. Plan review for major residential projects can be lengthy; recent timing for this class of work has been cited around many months, so early zoning verification and complete architectural and structural drawings matter. A municipally licensed Denver general contractor coordinates the project and the licensed specialty trades who pull and perform electrical, plumbing, and mechanical work under the approved plans and inspections.

text

Materials, Structure, and Systems

Second-story walls are commonly framed with 2x4 or 2x6 lumber. Floors and roofs often use engineered lumber for longer spans and tighter deflection control. Foundation reinforcement on older Denver homes may include extended concrete footings, new piers and beams, or helical piers where conditions require them. Exterior materials are usually selected to align with the existing house and neighborhood character—brick, stucco, wood, or fiber-cement siding, plus a new roof in asphalt, metal, or another system suited to the design. Energy-code insulation, efficient windows and doors, and a right-sized HVAC system are central because the home’s conditioned volume increases substantially. Utility rough-ins must be integrated with the existing systems rather than treated as a simple add-on.

text

What Buyers and Homeowners Should Evaluate

Before starting a pop-top—or buying a home that already has one—review structural documentation, closed permits, and zoning compliance for height, setbacks, and bulk plane. Confirm that foundation capacity was engineered for the second story and that framing, weather barrier, roofing, and finishes integrate cleanly with the original structure. Ask how HVAC capacity, ductwork, electrical service, and plumbing were addressed for the added load. Unpermitted or incomplete work creates inspection, insurance, and resale risk. Expect full-house disruption for a multi-month build, with relocation during open framing. Budget contingency is important because foundation conditions are often not fully known until the structure is opened; a meaningful share of projects need more reinforcement than first assumed. Choose a team with specific Denver pop-top experience, structural-engineer collaboration, and a clear process for design, CPD permitting, inspections, and change management. Neighborhood value ceilings still matter: more square footage helps only when the finished home fits local demand and scale.

FAQ

Common questions

How long does a Denver pop-top addition take?

Design and permitting often take about 3 to 6 months. Construction commonly runs about 5 to 7 months after permits, depending on scope, inspections, historic review, and weather. Framing is usually the most disruptive stretch and may require temporary relocation for several weeks.

Do I have to change the foundation to add a second story?

Often yes, at least in part. Many single-story foundations and walls were not designed for a full second story. A structural engineer evaluates capacity and specifies reinforcement such as extended footings, piers and beams, or other support. Some older homes need more extensive work once conditions are fully visible.

What zoning limits affect a pop-top in Denver?

Height limits, side and rear setbacks, and bulk-plane rules are the main constraints. Even when the first floor is legal, the second story may need to step in or change roof form to stay inside the allowed envelope. Historic districts can add exterior design review on top of standard zoning.

Who handles the trade permits and licensing on a pop-top?

A municipally licensed Denver general contractor coordinates the overall building permit process and project. Licensed specialty trades handle electrical, plumbing, and mechanical work and the related trade permits and inspections under current Denver codes.

Will we need a new HVAC system?

In most cases the existing system is not sized for the added second-story load. Plan on evaluation and, frequently, replacement or major upgrade of equipment and ductwork so both levels heat and cool evenly and meet code.

Can we stay in the house during construction?

Some early and late phases may allow limited occupancy, but the open-roof and framing period is generally not livable. Many households relocate for roughly 2 to 8 weeks during that window, and overall disruption can extend across the full multi-month build.

Service Area

Serving Centennial and Arapahoe County

We serve Centennial, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Centennial project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Let's design your perfect Pop-Top Addition together

Get a personalized estimate in about 2 minutes — no pressure, no obligation.

★★★★★
500+ Denver homeowners trust Autotelic
Licensed & Insured ContractorVeteran-OwnedTesla Certified

How This Works (2 minutes)

  1. 1Tell us about your project (30 seconds)
  2. 2Answer a few quick questions for an accurate estimate (60 seconds)
  3. 3Get your personalized estimate instantly (30 seconds)

No pressure. No obligation. No spam calls. If we're not the right fit, we'll tell you — and even recommend someone who is.