autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

CHERRY HILLS VILLAGE SERVICES

Outdoor Event Infrastructure in Cherry Hills Village

Licensed outdoor event infrastructure services for Cherry Hills Village and Arapahoe County. Production-ready. Rain or shine..

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Outdoor Event Infrastructure

Production-ready. Rain or shine.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Outdoor Event Infrastructure Services in Cherry Hills Village, Colorado

Autotelic provides professional outdoor event infrastructure services throughout Cherry Hills Village and the surrounding Arapahoe County area. Outdoor event infrastructure across the Denver metro — temporary power, staging, tent anchoring, A/V distribution, and weather-proof installations. Whether you're in Cherry Hills Village (affluent south Denver) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Cherry Hills Village permit thresholds

Code reference
The Village adopted the 2024 International Codes (I-Codes) at the beginning of 2026, including the 2024 International Residential Code (IRC), and adheres to Chapter 18 of the Cherry Hills Village Municipal Code for building regulations.
Code reference
If an addition is more than 50% of the existing square footage, or if the aggregate floor area is demolished or reconstructed by more than 50%, or increased by 50% or more, the project is considered "redevelopment" and may have additional submittal and drainage requirements per Chapter 9 of the zoni
Code reference
Any electrical work on 400 amps (320 continuous) or greater requires a separate plan review.
Impervious Surface
If more than 2,500 square feet of impervious surface is added cumulatively (e.g., house addition, driveway, patio), a Phase III Drainage Plan is required.
Code Reference
Cherry Hills Village Municipal Code, Chapter 18, and the adopted 2024 International Residential Code.
Code reference
### Exempt Work (Cherry Hills Village Municipal Code Section 105.2, referencing adopted I-Codes)Section 105.2
Code reference
One-story detached, prefabricated storage sheds that do not exceed 120 square feet.
Code Reference
Cherry Hills Village Municipal Code, Section 105.2, referencing adopted I-Codes.Section 105.2

Codes are amended regularly — verify current requirements with **The City of Cherry Hills Village (specifically its Building Division under Community Development) issues residential building permits.

text

What this covers

Temporary power, weather cover, and staging support for an outdoor event — not touring concert production. Generators, distribution, and cable ramps are planned against the site and Denver right-of-way rules.

text

How the work is coordinated

Live-event lighting and DJ packages are separate trades and are not claimed here. Denver-metro work is permitted locally. Colorado has no statewide general-contractor license. Cities and counties license general contractors. DORA licenses electrical and plumbing (and similar regulated trades), not general contractors. Autotelic is a municipally licensed Denver general contractor that coordinates licensed specialty trades. Denver building permits run through Community Planning and Development (CPD). Costs are project-specific; no dollar figures.

Service Area

Serving Cherry Hills Village and Arapahoe County

We serve Cherry Hills Village, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Cherry Hills Village project.

FAQ

Common questions

Can you build code-compliant restaurant patios and outdoor spaces?

Yes — outdoor dining and event spaces need the same municipal permitting and inspections as interior work, and we handle structures, power, lighting, and finishes as one scope.

When should we start to be ready for patio season?

Earlier than most people think — permits and site work take time. Reach out with your target opening and we will lay out a realistic schedule.

Do you coordinate with landlords and the city?

Yes — tenant, landlord, and municipality all have a say in outdoor build-outs. We manage those approvals as part of the project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free outdoor event infrastructure estimate in Cherry Hills Village

Tell us about your Cherry Hills Village project — we respond fast, and estimates are always free.

Name, phone, and email required.