autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

COMMERCE CITY SERVICES

Pop-Top Addition in Commerce City

Licensed pop-top addition services for Commerce City and Adams County. Go up, not out — add a full second story.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Pop-Top Addition

Go up, not out — add a full second story

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Pop-Top Addition Services in Commerce City, Colorado

Autotelic provides professional pop-top addition services throughout Commerce City and the surrounding Adams County area. Pop-top second-story additions across the Denver metro — add bedrooms, bathrooms, and living space without expanding your footprint. Structural engineering included. Whether you're in Commerce City (northeast Denver metro) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Commerce City permit thresholds

Code reference
Residential roof sheathing replacements of 256 square feet and under (unless required to be fire-retardant).
Code reference
Gutters, kitchen cabinets, on-grade patios, driveways, and certain other minor items (e.g., fences meeting height limits, playground equipment, retaining walls 4 feet and under without surcharge).
Code reference
These rules are in Commerce City Revised Municipal Code Chapter 5 (Buildings and Building Regulations), Article I, particularly Sec. 5-5 (scope of the City of Commerce City Building Code and work exempt from code provisions) and the referenced Sec. 5-8 (work exempt from permit requirements).Sec. 5-5
Code reference
The city adopts the 2021 IBC/IRC and related codes with local amendments.
Code reference
Use tax is collected at 4.5% applied to the dollar cost and/or value of all building and construction materials intended to be used and/or consumed as part of the project (not collapsed into a single rate; confirmed for small projects valued at $500 or less, where the permit fee is $23.50 and th

Codes are amended regularly — verify current requirements with **The Building Safety Division (part of the City of Commerce City’s Community Development Department) issues residential building permits.

Zoning & ADU

Commerce City zoning & ADU quick facts

Code reference
ADUs are permitted in single-family residential districts (e.g., R-1 Single-Family Detached Residential District and similar zones) under the 2025 Land Development Code updates. Only one ADU is allowed per single-family lot.
ADU size limits (applicable across qualifying single-family districts)
Cannot exceed 75% of the floor area of the principal unit or 1,000 sf, whichever is less; a minimum of 750 sf is permitted regardless of principal unit size.
ADU height limits
Must be less than the height of the principal building or 22 ft maximum, whichever is less.
Code reference
No specific numeric standards for maximum lot coverage %, primary building height, or district-specific setbacks for additions/garages/primary structures in the most common single-family districts (such as R-1) were located with direct code citations in available sources.
Code reference
For full district tables (e.g., R-1 standards in Article IV or equivalent sections of the Land Development Code), consult the official code on Municode or enCodePlus, or contact Commerce City Planning (Planner of the Day).

Codes are amended regularly — verify current requirements with **The Building Safety Division (part of the City of Commerce City’s Community Development Department) issues residential building permits.

Energy Code

Commerce City energy code quick facts

Code reference
2021 IECC (as the City of Commerce City Energy Conservation Code), with local amendments.
Code reference
Commerce City adopts the 2021 edition of the International Energy Conservation Code (IECC) as its Energy Conservation Code (both commercial and residential provisions apply, per the city’s Building Code).
Code reference
This is incorporated by reference in the Commerce City Revised Municipal Code (C3BC), primarily via Sec. 5-2 (Incorporation by reference), which lists the 2021 IECC among the adopted codes.Sec. 5-2
Code reference
It is further detailed and locally amended on the city’s official page for the 2021 IECC.
Code reference
The city’s amendments (detailed on the official 2021 IECC adoption page) are primarily administrative/procedural and do not alter the core prescriptive tables or performance requirements of the 2021 IECC itself.
Code reference
Amending C101.1 (Title) to reference the City of Commerce City Commercial Energy Conservation Code.
Code reference
Requiring digital submission of construction documents with specific energy-related details (e.g., insulation R-values, fenestration U-factors/SHGC, air barrier details).
Code reference
Deleting/replacing the fees section (C104) to tie into the city’s municipal code Article VI, Chapter 5.

Codes are amended regularly — verify current requirements with **The Building Safety Division (part of the City of Commerce City’s Community Development Department) issues residential building permits.

text

What a pop-top covers

A pop-top in the Denver metro raises or replaces the roof on the existing footprint to add a story or habitable attic. Walls usually stay; massing and bulk plane control the envelope. The existing foundation still has to take the new loads. A municipally licensed Denver general contractor coordinates the project, design professionals, and licensed specialty trades. Cost is project-specific and depends on roof structure, stairs, and how much of the first floor is opened.

text

Bulk plane, height, and landmarks

Zoning height is measured in feet and stories from the front and rear base planes (DZC Sec. 13.1.2). Plans must show allowed versus proposed bulk plane, including roof overhangs. If the existing house already breaks height or bulk rules, elevations should distinguish retained structure from new work. Landmark Preservation lists pop-top/rooftop additions as a review type; designated properties need Landmark approval before zoning or building permits.

text

Permits and who coordinates the work

City and County of Denver Community Planning and Development treats pop-tops like other second-story or attic work: structural review and a sealed structural-integrity letter from a design professional who inspected the existing foundation (DBCA 133.3), plus zoning, building, and typically SUDP. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades plus the design professionals required for the project.

text

What buyers should prepare

Target rooms, roof and attic photos, known foundation issues, and landmark or historic-district status.

FAQ

Common questions

Is a pop-top different from a second-story addition?

A pop-top usually stays on the existing footprint and is controlled by bulk plane. A second-story addition may also expand walls. Both need structural review in Denver.

Who handles pop-top permits and licensing?

A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.

Do historic houses need extra review?

Yes. Landmark lists pop-top/rooftop additions. Approval comes before zoning and building permits on designated properties.

Will the existing foundation work?

Only after a design professional inspects it. CPD asks for a sealed structural-integrity letter for second-story and attic work.

What information helps define scope?

Desired rooms, roof photos, landmark status, and city or county.

Service Area

Serving Commerce City and Adams County

We serve Commerce City, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Commerce City project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Let's design your perfect Pop-Top Addition together

Get a personalized estimate in about 2 minutes — no pressure, no obligation.

Licensed & Insured ContractorVeteran-Owned

How This Works (2 minutes)

  1. 1Tell us about your project (30 seconds)
  2. 2Answer a few quick questions for an accurate estimate (60 seconds)
  3. 3Get your personalized estimate instantly (30 seconds)

No pressure. No obligation. No spam calls. If we're not the right fit, we'll tell you — and even recommend someone who is.