(720) 287-7958

DESIGN · BUILD · AUTOMATE

WHEAT RIDGE SERVICES

Garage Conversion in Wheat Ridge

ADU Feasibility Consultation, $350

See all 2 jobs

Licensed garage conversion services for Wheat Ridge and Jefferson County. Turn your garage into livable space.

What Wheat Ridge requires

Use tax: Per City Code Section 22-68, use tax is charged at 3.5% of 60% of the project valuation (60% of valuation is assumed to be materials subject to tax). §22-68

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Garage Conversion

Turn your garage into livable space

Jobs you can book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • ADU Feasibility Consultation

    An on-site review of your lot against local ADU zoning, setbacks, and utility access.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    An on-site review of your lot against local ADU zoning, setbacks, and utility access. You get a verbal go/no-go read plus a one-page summary of constraints and next steps.

  • ADU Feasibility Package

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget.

    $475 deposit to book, the rest when the work is done · morning (8–12) or afternoon (12–4)

    What's included

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget. A documented go/no-go you can take to a lender.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Garage Conversion Services in Wheat Ridge, Colorado

Autotelic provides professional garage conversion services throughout Wheat Ridge and the surrounding Jefferson County area. Garage to living space conversions across the Denver metro — studios, offices, guest suites, and ADUs with full HVAC, insulation, and code-compliant egress. Whether you're in Wheat Ridge (central Jefferson County) or nearby communities, our team delivers quality workmanship, licensed and insured.

Permit Thresholds

Wheat Ridge permit thresholds

Code reference
Retaining walls over 4' high (or supporting a surcharge) and other structural elements like decks or room additions explicitly require permits; any structural work in a remodel would qualify as an alteration requiring a permit.
Code reference
These requirements are enforced under the City of Wheat Ridge Municipal Code, Chapter 5, Article II, Division 2 (Building Permits).
Use tax
Per City Code Section 22-68, use tax is charged at 3.5% of 60% of the project valuation (60% of valuation is assumed to be materials subject to tax).§22-68
Code reference
Permit fees are based on the higher of the applicant’s valuation or the building official’s minimum (using ICC Building Valuation Data); a separate plan review fee (65% of the permit fee) applies where required.

Codes are amended regularly — verify current requirements with **City of Wheat Ridge Building Division (City of Wheat Ridge, Colorado) issues residential building permits.

Energy Code

Wheat Ridge energy code quick facts

Code reference
2024 IECC (with Colorado Model Low Energy and Carbon Code, 2025 edition, and Colorado Model Electric Ready and Solar Ready Code), adopted by reference with primarily administrative/local amendments (no technical energy amendments noted).
Code reference
This replaces the prior 2018 I-Codes.
Code reference
City Council approved on October 27, 2025 (Ordinance 1883); the 2024 codes (including 2024 IECC, excluding Chapter 1 but retaining Sections C102, R102, C107, and R107) apply to all new permit applications beginning January 1, 2026.Ord. 1883
Code reference
Wheat Ridge is in Climate Zone 5B.
Code reference
Requirements for remodels/additions generally follow the 2024 IECC (and Colorado model code) provisions applicable to existing buildings (often via IEBC cross-references or specific existing-building sections), with no local technical amendments identified that alter prescriptive values.
Code reference
Specific numeric prescriptive requirements (e.g., R-values, U-factors, air-sealing thresholds) are those in the base 2024 IECC/Colorado model code for CZ 5B; local adoption does not modify them.
Permit-related tax/fee (construction use tax)
Use tax of 3.5% applied to 60% of the project valuation (separate from and in addition to the building permit fee, which is calculated via a tiered schedule based on valuation).
Code reference
Adopting references include Chapter 5 of the Wheat Ridge Municipal Code (incorporating the listed codes by reference) and Ordinance 1883.Ord. 1883

Codes are amended regularly — verify current requirements with **City of Wheat Ridge Building Division (City of Wheat Ridge, Colorado) issues residential building permits.

Zoning & Dimensional Standards

Setback & dimensional standards in Wheat Ridge

Zone-district dimensional standards for Wheat Ridge, quoted verbatim from the Wheat Ridge Code of Ordinances (Ch.26 Zoning). Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

A-1setback & dimensional standards
StandardRequirement
Front Setback (min)30' (c)
Side Setback (min)15'
Rear Setback (min)15' (g)
Building Coverage (max)25%
Building Height (max)35'
Lot Area (min)1 acre
Lot Width (min)140'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) A-1 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

A-2setback & dimensional standards
StandardRequirement
Front Setback (min)30' (c)
Side Setback (min)15'
Rear Setback (min)15' (g)
Building Coverage (max)25%
Building Height (max)35'
Lot Area (min)1 acre
Lot Width (min)140'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) A-2 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-1setback & dimensional standards
StandardRequirement
Front Setback (min)30' (c)
Side Setback (min)15'
Rear Setback (min)15'
Building Coverage (max)25%
Building Height (max)35'
Lot Area (min)12,500 sf
Lot Width (min)100'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-1 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-1Asetback & dimensional standards
StandardRequirement
Front Setback (min)25' (c)
Side Setback (min)10'
Rear Setback (min)15' (h)
Building Coverage (max)30%
Building Height (max)35'
Lot Area (min)9,000 sf
Lot Width (min)75'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-1A setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-1Bsetback & dimensional standards
StandardRequirement
Front Setback (min)25' (d)
Side Setback (min)5' (e)
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)7,500 sf
Lot Width (min)60'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-1B setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-1Csetback & dimensional standards
StandardRequirement
Front Setback (min)20' (d)
Side Setback (min)5'
Rear Setback (min)5'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)5,000 sf
Lot Width (min)50'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-1C setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-2setback & dimensional standards
StandardRequirement
Front Setback (min)25' (d)
Side Setback (min)5' (e)
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)9,000 sf
Lot Width (min)75'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-2 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-2Asetback & dimensional standards
StandardRequirement
Front Setback (min)25' (d)
Side Setback (min)5' (d)
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)7,500 sf
Lot Width (min)60'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-2A setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-3setback & dimensional standards
StandardRequirement
Front Setback (min)25' (e)
Side Setback (min)5'
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)7,500 sf
Lot Width (min)60'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-3 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-3Asetback & dimensional standards
StandardRequirement
Front Setback (min)25' (e)
Side Setback (min)5'
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)7,500 sf
Lot Width (min)60'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-3A setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What garage conversion covers

Garage conversions in the Denver metro turn an attached or detached garage into conditioned living space or, where zoning allows, an accessory dwelling unit. Work typically includes insulation, new openings, electrical, HVAC, and often a bath or kitchen. Parking on the lot still has to satisfy zoning. A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Cost is project-specific and depends on attached versus detached, ADU versus extra rooms, and how much of the envelope changes.

text

What buyers should prepare

Attached versus detached, living space versus ADU, whether a bath or kitchen is included, and how parking will be handled.

FAQ

Common questions

How much does ADU Feasibility Consultation cost in Wheat Ridge?

$350.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Who handles garage conversion permits and licensing?

A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.

Is extra living space the same as an ADU?

No. Extra rooms for the main house stay one dwelling. An ADU is a separate dwelling and is only allowed in districts that permit it.

What information helps define scope?

Attached vs detached, ADU vs extra rooms, parking plan, and city or county.

Service Area

Serving Wheat Ridge and Jefferson County

We serve Wheat Ridge, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Wheat Ridge project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY