(720) 287-7958

DESIGN · BUILD · AUTOMATE

CENTENNIAL SERVICES

Garage Conversion in Centennial

ADU Feasibility Consultation, $350

See all 2 jobs

Licensed garage conversion services for Centennial and Arapahoe County. Turn your garage into livable space.

What Centennial requires

Code reference: In Centennial, Colorado, building permits for residential remodel work are governed by the 2021 International Residential Code (IRC) Section R105 (adopted via Centennial Municipal Code Chapter 18 – Building Regulations, per Ordinance 2023-O-06 and related adoptions of the 2021 I-Codes). §R105

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Garage Conversion

Turn your garage into livable space

Jobs you can book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • ADU Feasibility Consultation

    An on-site review of your lot against local ADU zoning, setbacks, and utility access.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    An on-site review of your lot against local ADU zoning, setbacks, and utility access. You get a verbal go/no-go read plus a one-page summary of constraints and next steps.

  • ADU Feasibility Package

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget.

    $475 deposit to book, the rest when the work is done · morning (8–12) or afternoon (12–4)

    What's included

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget. A documented go/no-go you can take to a lender.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Garage Conversion Services in Centennial, Colorado

Autotelic provides professional garage conversion services throughout Centennial and the surrounding Arapahoe County area. Garage to living space conversions across the Denver metro — studios, offices, guest suites, and ADUs with full HVAC, insulation, and code-compliant egress. Whether you're in Centennial (south Denver metro) or nearby communities, our team delivers quality workmanship, licensed and insured.

Permits & Licensing

Permits in Centennial

Centennial building permits, inspections, and contractor license approvals are handled by the city's Building Division. Permits and contractor licenses must be applied for online through the city's Self-Service Portal, and we handle that process as part of every project. Authority: City of Centennial — Building Division.

Permit Thresholds

Centennial permit thresholds

Code reference
In Centennial, Colorado, building permits for residential remodel work are governed by the 2021 International Residential Code (IRC) Section R105 (adopted via Centennial Municipal Code Chapter 18 – Building Regulations, per Ordinance 2023-O-06 and related adoptions of the 2021 I-Codes).§R105
Code reference
Typically exempt work (aligning with IRC R105.2 exemptions, with local application) includes:
Code reference
One-story detached accessory structures (e.g., sheds) ≤200 sq ft.
Code reference
Fences ≤7 ft high; retaining walls ≤4 ft high (measured from bottom of footing).
Code reference
Prefabricated swimming pools <24 inches deep.
Code reference
Window awnings projecting ≤54 inches.
Code reference
Decks ≤200 sq ft, ≤30 inches above grade, and not attached to the dwelling.
Use tax (not collapsed into a single rate)
City of Centennial Use Tax of 2.5% applied to the actual cost of materials, plus Arapahoe County Use Tax of 0.25% applied to the actual cost of materials.

Codes are amended regularly — verify current requirements with City of Centennial — Building Division.

Zoning & ADU

Centennial zoning & ADU quick facts

NC5 — Minimum Lot Area
5000 sfNC5
NC5 — Minimum Lot Width
50 ftNC5
NC5 — Front Setback (min)
15'NC5
NC5 — Side Interior Setback (min)
5'NC5
NC5 — Side Setback Abutting Street (min)
10'NC5
NC5 — Rear Setback (min)
15'NC5
NC5 — Lot Coverage (max)
42%NC5
NC5 — Building Height (max)
30'NC5
City of Centennial Land Development Code / official Zoning District Descriptions (2011 LDC summaries as published by the City) NC5 setback standards (Centennial Zoning District Descriptions (city website; verify against Chapter 12 LDC)) — effective 2011-01-01Source: centennialco.gov

Codes are amended regularly — verify current requirements with City of Centennial — Building Division.

Energy Code

Centennial energy code quick facts

Code reference
Centennial, Colorado, has adopted the 2018 IECC (with the 2021 I-Codes package) as its energy code, with no mention of Denver-specific overlays such as the Denver Green Code or Energize Denver.
Code reference
This is enforced by the City’s Building Division under Ordinance No. 2023-O-06 (adopting the referenced codes by reference, effective as part of the 2021/2023 code update package).Ord. No. 2023-O-06
Code reference
Centennial is in Climate Zone 5B.
Code reference
The code applies to alterations, additions, and remodels per IECC Chapter 5 (existing buildings), with the prescriptive requirements of Chapter 4 (or equivalent U-factor/UA paths) generally applying to new or modified portions of the thermal envelope.
Code reference
Key prescriptive requirements relevant to remodels/additions (drawn from 2018 IECC Table R402.1.2 and related sections for CZ 5; these are the base code values with no local amendments identified that alter them):
Ceiling/attic insulation
Minimum R-49 (or equivalent U-factor ≤ 0.026).
Adopting reference
2018 IECC R402.1.2 (Table R402.1.2).
Wood-frame wall insulation
R-20 cavity or R-13 cavity + R-5 continuous insulation (or equivalent U-factor ≤ 0.060).
Ord. No. 2023-O-06Source: centennialco.gov

Codes are amended regularly — verify current requirements with City of Centennial — Building Division.

text

What garage conversion covers

Garage conversions in the Denver metro turn an attached or detached garage into conditioned living space or, where zoning allows, an accessory dwelling unit. Work typically includes insulation, new openings, electrical, HVAC, and often a bath or kitchen. Parking on the lot still has to satisfy zoning. A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Cost is project-specific and depends on attached versus detached, ADU versus extra rooms, and how much of the envelope changes.

text

What buyers should prepare

Attached versus detached, living space versus ADU, whether a bath or kitchen is included, and how parking will be handled.

FAQ

Common questions

How much does ADU Feasibility Consultation cost in Centennial?

$350.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Who handles garage conversion permits and licensing?

A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.

Is extra living space the same as an ADU?

No. Extra rooms for the main house stay one dwelling. An ADU is a separate dwelling and is only allowed in districts that permit it.

What information helps define scope?

Attached vs detached, ADU vs extra rooms, parking plan, and city or county.

Service Area

Serving Centennial and Arapahoe County

We serve Centennial, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Centennial project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY