(720) 287-7958

DESIGN · BUILD · AUTOMATE

ARVADA SERVICES

Garage Conversion in Arvada

ADU Feasibility Consultation, $350

See all 2 jobs

Licensed garage conversion services for Arvada and Jefferson/Adams County. Turn your garage into livable space.

What Arvada requires

Code reference: Arvada requires building permits for most residential construction, alteration, repair, enlargement, replacement, equipment installation, use/occupancy changes, and demolition work, per the City’s Building Permits page and Chapter 18 of the Arvada City Code (which adopts the 2024 International Res Ord. No. 4921

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Garage Conversion

Turn your garage into livable space

Jobs you can book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • ADU Feasibility Consultation

    An on-site review of your lot against local ADU zoning, setbacks, and utility access.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    An on-site review of your lot against local ADU zoning, setbacks, and utility access. You get a verbal go/no-go read plus a one-page summary of constraints and next steps.

  • ADU Feasibility Package

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget.

    $475 deposit to book, the rest when the work is done · morning (8–12) or afternoon (12–4)

    What's included

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget. A documented go/no-go you can take to a lender.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Garage Conversion Services in Arvada, Colorado

Autotelic provides professional garage conversion services throughout Arvada and the surrounding Jefferson/Adams County area. Garage to living space conversions across the Denver metro — studios, offices, guest suites, and ADUs with full HVAC, insulation, and code-compliant egress. Whether you're in Arvada (historic Olde Town and rapid growth) or nearby communities, our team delivers quality workmanship, licensed and insured.

Permits & Licensing

Permits in Arvada

Arvada building permits are issued by Building Services, and the city notes that unpermitted work can jeopardize a contractor's licensing as well as a property's resale value. Permit applications, inspection scheduling, and status checks are handled through the separate Arvada Permits (eTRAKiT) site. Authority: City of Arvada — Building Services.

Permit Thresholds

Arvada permit thresholds

Code reference
Arvada requires building permits for most residential construction, alteration, repair, enlargement, replacement, equipment installation, use/occupancy changes, and demolition work, per the City’s Building Permits page and Chapter 18 of the Arvada City Code (which adopts the 2024 International ResOrd. No. 4921
Code reference
This is assessed in lieu of sales tax on construction materials used in Arvada (Arvada Municipal Code § 98-84).§ 98-84
Code reference
A separate 2026 Building Fee Schedule PDF is referenced but not detailed on the main pages.
Code reference
For the most current or project-specific details (including any local amendments to the 2024 IRC that might address minor/exempt work or structural thresholds), contact the Arvada Building Safety Division or check the adopted codes on the City website, as published information emphasizes case-by-cas

Codes are amended regularly — verify current requirements with City of Arvada — Building Services.

Energy Code

Arvada energy code quick facts

Code reference
Arvada, Colorado, has adopted the Colorado Low Energy Carbon Code (or Model Low Energy and Carbon Code/MLECC/LECC), based on the 2024 International Energy Conservation Code (IECC), with no additional local energy-code amendments noted beyond the state model. This applies alongside the 2024 Inter
Code reference
Adoption occurred via City Council action on March 24, 2026 (effective for permits submitted on or after approximately July 1, 2026).
Code reference
Arvada (Climate Zone 5B) does not use the Denver Green Code or Energize Denver program.
Code reference
For remodels and additions, the modified/new portions generally must comply with the current code (per IECC/LECC Sections C502/C503 or R502/R503 equivalents) without necessarily triggering updates to unmodified existing systems.
Code reference
Key prescriptive requirements (drawn from the 2024 IECC residential provisions as adopted in the Colorado LECC; values for CZ 5; relevant to new or modified envelope elements in additions/remodels):
Ceiling/attic insulation
Minimum R-49 (Table R402.1.3 / equivalent in LECC).
Wood-frame above-grade wall insulation
Options include R-20 + R-5 ci, R-13 + R-10 ci, or equivalent assembly U-factor ≤ 0.045 (or reduced options such as R-20 cavity with additional efficiency credits per R408); see Table R402.1.2/R402.1.3.
Air leakage (blower-door testing)
Maximum 3.0 ACH50 at 50 Pa for the tested dwelling unit or building under the prescriptive path in CZ 3–5 (R402.5.1.3 / equivalent).

Codes are amended regularly — verify current requirements with City of Arvada — Building Services.

Zoning & Dimensional Standards

Setback & dimensional standards in Arvada

Zone-district dimensional standards for Arvada, quoted verbatim from the Arvada Land Development Code. Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

RN-12.5setback & dimensional standards
StandardRequirement
Front Setback (min)30 ft.
Side Interior Setback (min)10 ft.
Rear Setback (min)15 ft.
Building Coverage (max)35%
Building Height (max)28 ft.
Lot Area (min)12,500 sf.
Lot Width (min)100 ft.

Arvada Land Development Code RN-12.5 setback standards (2-1-3-3 Table 2-1-3-3A (RN)) — effective 2025-12-16 · View the code

RN-32.5setback & dimensional standards
StandardRequirement
Front Setback (min)30 ft.
Side Interior Setback (min)15 ft.
Rear Setback (min)15 ft.
Building Coverage (max)25%
Building Height (max)35 ft.
Lot Area (min)32,500 sf.
Lot Width (min)100 ft.

Arvada Land Development Code RN-32.5 setback standards (2-1-3-3 Table 2-1-3-3A (RN)) — effective 2025-12-16 · View the code

RN-4setback & dimensional standards
StandardRequirement
Front Setback (min)18 ft.
Side Interior Setback (min)5 ft.
Rear Setback (min)10 ft.
Building Coverage (max)40%
Building Height (max)28 ft.
Lot Area (min)4,000 sf.
Lot Width (min)40 ft.

Arvada Land Development Code RN-4 setback standards (2-1-3-3 Table 2-1-3-3A (RN)) — effective 2025-12-16 · View the code

RN-6setback & dimensional standards
StandardRequirement
Front Setback (min)18 ft.
Side Interior Setback (min)5 ft.
Rear Setback (min)10 ft.
Building Coverage (max)40%
Building Height (max)28 ft.
Lot Area (min)6,000 sf.
Lot Width (min)50 ft.

Arvada Land Development Code RN-6 setback standards (2-1-3-3 Table 2-1-3-3A (RN)) — effective 2025-12-16 · View the code

RN-7.5setback & dimensional standards
StandardRequirement
Front Setback (min)20 ft.
Side Interior Setback (min)7.5 ft.
Rear Setback (min)10 ft.
Building Coverage (max)40%
Building Height (max)28 ft.
Lot Area (min)7,500 sf.
Lot Width (min)75 ft.

Arvada Land Development Code RN-7.5 setback standards (2-1-3-3 Table 2-1-3-3A (RN)) — effective 2025-12-16 · View the code

RN-Dsetback & dimensional standards
StandardRequirement
Front Setback (min)18 ft.
Side Interior Setback (min)5 ft.
Rear Setback (min)10 ft.
Building Coverage (max)40%
Building Height (max)28 ft.
Lot Area (min)6,000 sf.
Lot Width (min)60 ft.

Arvada Land Development Code RN-D setback standards (2-1-3-3 Table 2-1-3-3A (RN)) — effective 2025-12-16 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What garage conversion covers

Garage conversions in the Denver metro turn an attached or detached garage into conditioned living space or, where zoning allows, an accessory dwelling unit. Work typically includes insulation, new openings, electrical, HVAC, and often a bath or kitchen. Parking on the lot still has to satisfy zoning. A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Cost is project-specific and depends on attached versus detached, ADU versus extra rooms, and how much of the envelope changes.

text

What buyers should prepare

Attached versus detached, living space versus ADU, whether a bath or kitchen is included, and how parking will be handled.

FAQ

Common questions

How much does ADU Feasibility Consultation cost in Arvada?

$350.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Who handles garage conversion permits and licensing?

A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.

Is extra living space the same as an ADU?

No. Extra rooms for the main house stay one dwelling. An ADU is a separate dwelling and is only allowed in districts that permit it.

What information helps define scope?

Attached vs detached, ADU vs extra rooms, parking plan, and city or county.

Service Area

Serving Arvada and Jefferson/Adams County

We serve Arvada, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Arvada project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY