(720) 287-7958

DESIGN · BUILD · AUTOMATE

NORTHGLENN SERVICES

Garage Conversion in Northglenn

ADU Feasibility Consultation, $350

See all 2 jobs

Licensed garage conversion services for Northglenn and Adams County. Turn your garage into livable space.

What Northglenn requires

Code reference: Residential remodel permits in Northglenn, CO, are administered by the Building Division (contracted to SAFEbuilt) under the adopted and locally amended 2021 International Residential Code (IRC), per Northglenn Municipal Code Chapter 10, Article 8 (Section 10-8-5 amendments). §10-8-5

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Garage Conversion

Turn your garage into livable space

Jobs you can book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • ADU Feasibility Consultation

    An on-site review of your lot against local ADU zoning, setbacks, and utility access.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    An on-site review of your lot against local ADU zoning, setbacks, and utility access. You get a verbal go/no-go read plus a one-page summary of constraints and next steps.

  • ADU Feasibility Package

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget.

    $475 deposit to book, the rest when the work is done · morning (8–12) or afternoon (12–4)

    What's included

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget. A documented go/no-go you can take to a lender.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Garage Conversion Services in Northglenn, Colorado

Autotelic provides professional garage conversion services throughout Northglenn and the surrounding Adams County area. Garage to living space conversions across the Denver metro — studios, offices, guest suites, and ADUs with full HVAC, insulation, and code-compliant egress. Whether you're in Northglenn (north Denver metro) or nearby communities, our team delivers quality workmanship, licensed and insured.

Permit Thresholds

Northglenn permit thresholds

Code reference
Residential remodel permits in Northglenn, CO, are administered by the Building Division (contracted to SAFEbuilt) under the adopted and locally amended 2021 International Residential Code (IRC), per Northglenn Municipal Code Chapter 10, Article 8 (Section 10-8-5 amendments).§10-8-5
Code reference
Permits are generally required for most residential remodel, alteration, addition, or repair work unless it qualifies for one of the narrow exemptions in the amended IRC Section R105.2.§R105.2.
Code reference
### Key Exemptions (IRC R105.2, as amended)
Exception 1 (amended)
Detached accessory structures (as defined in Chapter 11 of the Northglenn Municipal Code) with floor area ≤ 200 square feet.
Code reference
(Standard IRC Exception 1 deleted in full and replaced.)
Exception 2
Deleted in its entirety.
Code reference
Permit and plan-review fees are based on project valuation (determined via square footage applied to the ICC Building Valuation Data Table, currently referencing the Feb 2019 table, or as otherwise established).
Code reference
Fees follow the 1997 Uniform Building Code schedule.

Codes are amended regularly — verify current requirements with **The City of Northglenn Building Division (contracted services provided by SAFEbuilt) issues residential building permits.

Zoning & ADU

Northglenn zoning & ADU quick facts

RS-1 — Minimum Lot Area
12500 sfRS-1
RS-1 — Minimum Lot Width
100'RS-1
RS-1 — Front Setback (min)
30'RS-1
RS-1 — Side Interior Setback (min)
10'RS-1
RS-1 — Rear Setback (min)
20'RS-1
RS-1 — Lot Coverage (max)
40%RS-1
RS-1 — Building Height (max)
28'RS-1
RS1 — Front Setback (min)
30'RS1
Northglenn UDO Table 2-18-A/B/C (Ord. 1966, 2019) RS-1 setback standards (11-2-18 Summary Tables of Lot and Building Standards) — effective 2019-02-01 · Northglenn UDO Table 2-18-A/B/C (Ord. 1966, 2019) RS1 setback standards (11-2-18 Summary Tables of Lot and Building Standards) — effective 2019-02-01Source: municode.northglenn.org

Codes are amended regularly — verify current requirements with **The City of Northglenn Building Division (contracted services provided by SAFEbuilt) issues residential building permits.

Energy Code

Northglenn energy code quick facts

Code reference
2021 IECC (with local amendments), per Northglenn Municipal Code Article 10-11 (adopted by Ord. 1799, 2020; Ord. 1847, 2023).
Code reference
Northglenn has not yet adopted the 2024 codes (scheduled for summer 2026).
Code reference
mixed-fuel building definitions/credits (e.g., 10 credits for all-electric new buildings or 20 for mixed-fuel from specified tables), and related provisions, but do not alter the base prescriptive insulation/U-factor tables or air-leakage thresholds from the 2021 IECC for Climate Zone 5B.
Code reference
Key prescriptive requirements relevant to remodels/additions (drawn from the adopted 2021 IECC provisions for CZ 5B, which apply unless a specific alteration triggers full compliance or exceptions; see IECC Chapter 5 / R5 sections for existing buildings):
Ceiling/attic insulation
R-60 (2021 IECC Table R402.1.2 / equivalent commercial table; applicable when accessible during remodels/additions).
Wood-frame wall insulation
R-20 + R-5 ci or R-13 + R-10 ci (2021 IECC Table R402.1.2; relevant for additions or wall alterations exposing cavities).
Air leakage / blower-door testing threshold
Maximum 3 ACH50 (2021 IECC R402.4.1.2; mandatory for new construction and often triggered or recommended for major remodels/additions meeting certain thresholds).
Additional electric infrastructure for combustion equipment (amendment to 2021 I
Junction box, continuous raceway to panel, reserved breaker space, and labeling “For future electric equipment” sized for equivalent electric load (Section C405.13 / equivalent residential; applies to alterations involving combustion equipment).§C405.13

Codes are amended regularly — verify current requirements with **The City of Northglenn Building Division (contracted services provided by SAFEbuilt) issues residential building permits.

text

What garage conversion covers

Garage conversions in the Denver metro turn an attached or detached garage into conditioned living space or, where zoning allows, an accessory dwelling unit. Work typically includes insulation, new openings, electrical, HVAC, and often a bath or kitchen. Parking on the lot still has to satisfy zoning. A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Cost is project-specific and depends on attached versus detached, ADU versus extra rooms, and how much of the envelope changes.

text

What buyers should prepare

Attached versus detached, living space versus ADU, whether a bath or kitchen is included, and how parking will be handled.

FAQ

Common questions

How much does ADU Feasibility Consultation cost in Northglenn?

$350.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Who handles garage conversion permits and licensing?

A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.

Is extra living space the same as an ADU?

No. Extra rooms for the main house stay one dwelling. An ADU is a separate dwelling and is only allowed in districts that permit it.

What information helps define scope?

Attached vs detached, ADU vs extra rooms, parking plan, and city or county.

Service Area

Serving Northglenn and Adams County

We serve Northglenn, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Northglenn project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY