(720) 287-7958

DESIGN · BUILD · AUTOMATE

LITTLETON SERVICES

Garage Conversion in Littleton

ADU Feasibility Consultation, $350

See all 2 jobs

Licensed garage conversion services for Littleton and Arapahoe County. Turn your garage into livable space.

What Littleton requires

Code reference: Standard IRC Section R105.2 exemptions typically apply (e.g., certain minor non-structural repairs, painting, or very small accessory structures), but Littleton provides no separate local valuation threshold below which permits are automatically waived for remodel/alteration work. §R105.2

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Garage Conversion

Turn your garage into livable space

Jobs you can book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • ADU Feasibility Consultation

    An on-site review of your lot against local ADU zoning, setbacks, and utility access.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    An on-site review of your lot against local ADU zoning, setbacks, and utility access. You get a verbal go/no-go read plus a one-page summary of constraints and next steps.

  • ADU Feasibility Package

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget.

    $475 deposit to book, the rest when the work is done · morning (8–12) or afternoon (12–4)

    What's included

    Site visit plus a written feasibility report: local ADU zoning check, buildable envelope sketch, utility routing notes, and a preliminary budget. A documented go/no-go you can take to a lender.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Garage Conversion Services in Littleton, Colorado

Autotelic provides professional garage conversion services throughout Littleton and the surrounding Arapahoe County area. Garage to living space conversions across the Denver metro — studios, offices, guest suites, and ADUs with full HVAC, insulation, and code-compliant egress. Whether you're in Littleton (historic downtown Littleton) or nearby communities, our team delivers quality workmanship, licensed and insured.

Permits & Licensing

Permits in Littleton

Littleton building permits are issued by the Community Development Department's Building Division and Permit Center, and a license or registration certificate is required to obtain permits for work within city limits. Applications, plan submittals, and inspection scheduling run through the eTRAKiT online system. Authority: City of Littleton — Community Development Department (Building Division / Permit Center).

Permit Thresholds

Littleton permit thresholds

Code reference
Littleton has adopted the 2024 International Residential Code (IRC) and other International Codes (with local amendments) under Littleton City Code Title 4, Building Regulations, Chapter 1.
Code reference
Standard IRC Section R105.2 exemptions typically apply (e.g., certain minor non-structural repairs, painting, or very small accessory structures), but Littleton provides no separate local valuation threshold below which permits are automatically waived for remodel/alteration work.§R105.2
Code reference
Exempt work lists and structural triggers are governed by the adopted 2024 IRC (with amendments) and Littleton’s submittal policies.
Code reference
Minor cosmetic or non-structural work (e.g., painting, flooring replacement without affecting structure) is typically exempt under IRC R105.2.
Building permit fees follow a tiered schedule based on total valuation (e.g., $1
$25.85; higher tiers add incremental amounts per $100 or $1,000).
Code reference
Plan review fee is 65% of the permit fee(s) when blueprints/construction documents are reviewed.
Code reference
Use tax deposit = 0.01969 × total job valuation, calculated as ((total job valuation × 52.5%) × 3.75%).
Code reference
Arapahoe County Open Space Tax = 0.00125 × total valuation, calculated as ((total job valuation × 50%) × 0.25%).

Codes are amended regularly — verify current requirements with City of Littleton — Community Development Department (Building Division / Permit Center).

Zoning & ADU

Littleton zoning & ADU quick facts

ACR — Minimum Lot Area
2.75 acACR
ACR — Minimum Lot Width
175'ACR
ACR — Front Setback (min)
25'ACR
ACR — Side Interior Setback (min)
20'ACR
ACR — Side Setback Abutting Street (min)
50'ACR
ACR — Rear Setback (min)
50'ACR
ACR — Lot Coverage (max)
17%ACR
ACR — Building Height (max)
30'ACR
Littleton Unified Land Use Code Title 10 (Ord. 18 Series of 2022; Ord. 20 Series of 2023) ACR setback standards (Table 10-4-2.2 NB Lot and Building Standards) — effective 2023-10-13Source: online.encodeplus.com

Codes are amended regularly — verify current requirements with City of Littleton — Community Development Department (Building Division / Permit Center).

Energy Code

Littleton energy code quick facts

Code reference
2024 IECC (residential and commercial provisions), as adopted by reference with amendments in Littleton City Code Title 4, Chapter 1 (Ordinance 11, Series 2025). The city also adopts the Colorado Model Electric Ready and Solar Ready Code (June 1, 2023 version).Ord. 11
Code reference
Prescriptive R-values/U-factors are unchanged from the 2024 I-codes (no local reductions or increases).
Code reference
Littleton is in Climate Zone 5B.
Code reference
Alterations/additions to the building thermal envelope (new assemblies, modifications, or change-in-use) must generally meet the new-construction prescriptive requirements below; existing assemblies that are exposed but not modified may be insulated to the greatest extent possible without exceeding
Code reference
Some exceptions apply (e.g., storm windows, roof recovers) provided energy use is not increased (amended C503.2 / R503.1.1).
Ceiling/attic insulation
R-49 (or R-38 over 100% of the area if uncompressed R-38 extends over the wall top plate at eaves; limited reduction to R-30 allowed for certain roof/ceiling designs up to 500 sf or 20% of ceiling area).
Adopting reference/ordinance
2024 IECC Table R402.1.2 / IRC Table N1102.1.2 (as consolidated in city table, note b/c).
Wood-framed above-grade walls
R-20ci only, or R-13cav + R-10ci, or R-20cav + R-5ci, or R-30cav only.

Codes are amended regularly — verify current requirements with City of Littleton — Community Development Department (Building Division / Permit Center).

text

What garage conversion covers

Garage conversions in the Denver metro turn an attached or detached garage into conditioned living space or, where zoning allows, an accessory dwelling unit. Work typically includes insulation, new openings, electrical, HVAC, and often a bath or kitchen. Parking on the lot still has to satisfy zoning. A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Cost is project-specific and depends on attached versus detached, ADU versus extra rooms, and how much of the envelope changes.

text

What buyers should prepare

Attached versus detached, living space versus ADU, whether a bath or kitchen is included, and how parking will be handled.

FAQ

Common questions

How much does ADU Feasibility Consultation cost in Littleton?

$350.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Who handles garage conversion permits and licensing?

A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.

Is extra living space the same as an ADU?

No. Extra rooms for the main house stay one dwelling. An ADU is a separate dwelling and is only allowed in districts that permit it.

What information helps define scope?

Attached vs detached, ADU vs extra rooms, parking plan, and city or county.

Service Area

Serving Littleton and Arapahoe County

We serve Littleton, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Littleton project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY