(720) 287-7958

DESIGN · BUILD · AUTOMATE

DENVER SERVICES

Trim & Millwork in Denver

Baseboard Installation (Per Linear Foot), $6.50 each · $99 minimum visit

See all 4 jobs

Licensed trim & millwork services for Denver. The details that define a space.

What Denver requires

Code reference: Exemptions and permit triggers align with administrative sections (e.g., analogous to IBC/IRC Section 105 or city-specific Admin provisions such as those referenced in policy documents like ADMIN 131/138). §105

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Trim & Millwork

The details that define a space

Jobs you can book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • Baseboard Installation (Per Linear Foot)

    $6.50 each · $5.50 each for 61–150 · $4.75 each for 151+ · $99 minimum visit

    Supply and install primed MDF baseboard up to 4.25 in tall: remove and haul away old base, cut, cope inside corners, nail, fill nail holes, and caulk top edge.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Supply and install primed MDF baseboard up to 4.25 in tall: remove and haul away old base, cut, cope inside corners, nail, fill nail holes, and caulk top edge. The per-linear-foot rate includes standard material. Duration shown is typical for ~100 lf; larger jobs scale (~2 min/lf). Excludes finish painting, stain-grade or hardwood profiles (quote separately), tile/stone base, and floor repairs behind removed base.

  • Crown Molding, Paint-Grade (Per Linear Foot)

    $9.50 each · $8.50 each for 61+ · $99 minimum visit

    Supply and install primed MDF crown molding up to 4.5 in: cut compound miters, cope inside corners, nail to blocking/studs, fill, and caulk both edges.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Supply and install primed MDF crown molding up to 4.5 in: cut compound miters, cope inside corners, nail to blocking/studs, fill, and caulk both edges. Ceilings up to 10 ft. The per-foot rate includes standard paint-grade material. Duration typical for one room (~55 lf). Excludes finish painting, vaulted/angled ceiling transitions, stain-grade wood, and rooms with heavy ceiling texture requiring extra caulk detail (small upcharge quoted on site).

  • Quarter-Round / Shoe Molding (Per Linear Foot)

    $3.25 each · $2.75 each for 81+ · $99 minimum visit

    Supply and install primed quarter-round or shoe molding along existing baseboard: cut, cope, nail, and fill nail holes.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Supply and install primed quarter-round or shoe molding along existing baseboard: cut, cope, nail, and fill nail holes. The per-linear-foot rate includes primed material. Duration typical for ~80 lf. Excludes painting, baseboard replacement (see baseboard SKU), and stain-grade material matching.

  • Window Casing (Per Window)

    $135 each · $115 each for 4+ · $99 minimum visit

    Case one standard window (up to 4x5 ft) in primed MDF: picture-frame or stool-and-apron style, mitered, nailed, filled, and caulked.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Case one standard window (up to 4x5 ft) in primed MDF: picture-frame or stool-and-apron style, mitered, nailed, filled, and caulked. Per-window rate includes standard material. Duration typical for 2 windows; add ~75 min per additional window. Excludes painting, drywall returns repair, stain-grade material, and windows above first-story exterior ladder height on interior stairwells requiring scaffold.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Trim & Millwork Services in Denver, Colorado

Autotelic provides professional trim & millwork services throughout Denver and the surrounding area. Baseboard, crown molding, door casing, wainscoting, and custom millwork installation with paint or stain finish. Whether you're in Denver (Colorado's capital city) or nearby communities, our team delivers quality workmanship, licensed and insured.

The build sequence for a Trim & Millwork project

Every project starts with a feasibility study; this trade is priced from the same assemblies.

  1. Trim & Millwork feasibility in Denver
  2. How a Trim & Millwork project is estimated

Start a Trim & Millwork feasibility study

Permits & Licensing

Permits in Denver

Building permits in Denver are issued by Community Planning and Development, and contractor licensing here is municipal — a Denver-licensed contractor pulls Denver permits. We handle permit applications and inspections as part of every project. Authority: City and County of Denver — Community Planning and Development.

Permit Thresholds

Denver permit thresholds

Code reference
Drywall patching or replacement of one sheet no larger than 4 ft by 8 ft.
Code/municipal-code references
Requirements are administered under the Denver Building and Fire Code (2025 edition, effective December 31, 2025, incorporating 2024 I-Codes with local amendments; prior editions referenced similar administrative provisions).
Code reference
Exemptions and permit triggers align with administrative sections (e.g., analogous to IBC/IRC Section 105 or city-specific Admin provisions such as those referenced in policy documents like ADMIN 131/138).§105
Code reference
Demolition has a specific reference (Denver Commercial Building Code Section 130.3 for exempted work).§130.3
There is a tiered schedule (e.g., $1–$500
$20 permit fee; higher tiers add per-$1,000 amounts with 50% plan review on many ranges); see the full table in the Development Fees policy for exact tiers.

Codes are amended regularly — verify current requirements with City and County of Denver — Community Planning and Development.

Energy Code

Denver energy code quick facts

Code reference
2021 IECC (with local Denver amendments) as adopted in the 2025 Denver Building and Fire Codes / Denver Energy Code (effective December 31, 2025); Denver Green Code (DGC) provisions may also apply to certain commercial/multifamily projects.
Code reference
Denver (Climate Zone 5B) follows the 2021 IECC base with amendments incorporated into the Denver Energy Code (DEC; residential provisions start around p.
Code reference
312 of the code document).
Code reference
The 2025 adoption explicitly incorporates the 2021 IECC for energy (distinct from the 2024 I-codes used for other building/fire provisions).
Code reference
Chapter 5 [RE] / [CE] addresses additions, alterations, repairs, and changes of occupancy to existing buildings.
Code reference
The DGC (2022, effective ~May 2023) is largely voluntary but includes mandatory elements for some larger buildings alongside Energize Denver performance standards (primarily for existing large buildings).
Code reference
Key prescriptive requirements relevant to remodels/additions (drawn from 2021 IECC Table R402.1.3 / equivalent, applicable via Chapter 5 for new envelope work unless otherwise exempted; Denver-specific checklist references confirm use of these tables or U-factor alternatives):
Ceiling/attic insulation
Minimum R-60 (Climate Zone 5).

Codes are amended regularly — verify current requirements with City and County of Denver — Community Planning and Development.

Zoning & Dimensional Standards

Setback & dimensional standards in Denver

Zone-district dimensional standards for Denver, quoted verbatim from the Denver Zoning Code. Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

E-CC-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)0'
Side Street Setback (min)0'
Side Interior Setback (min)0'

Denver Zoning Code E-CC-3 setback standards (4.3, p.37) — effective 2010-06-25 · View the code

E-MS-2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-MS-2 setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-MS-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-MS-3 setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-MS-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-MS-5 setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-MU-2.5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)7.5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)6,000 sf
Zone Lot Width (min)50'
Height in Feet (max)30'/30'
Height in Stories (max)2.5/2.5
Bulk Plane10'/10'

Denver Zoning Code E-MU-2.5 setback standards (4.3, p.19) — effective 2010-06-25 · View the code

E-MX-2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-MX-2 setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-MX-2Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-MX-2A setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-MX-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-MX-3 setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-MX-3Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-MX-3A setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-MX-Esetback & dimensional standards
StandardRequirement
Primary Street Setback (min)40% E-MS: 60%
Side Street Setback (min)25%

Denver Zoning Code E-MX-E setback standards (4.3, p.39) — effective 2010-06-25 · View the code

E-RH-2.5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)7.5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)6,000 sf
Zone Lot Width (min)50'
Height in Feet (max)30'/30'
Height in Stories (max)2.5/2.5
Bulk Plane10'/10'

Denver Zoning Code E-RH-2.5 setback standards (4.3, p.19) — effective 2010-06-25 · View the code

E-RX-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-RX-3 setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-RX-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code E-RX-5 setback standards (4.3, p.33) — effective 2010-06-25 · View the code

E-SU-Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Rear Setback where no alley (min)Not in our sourced tables for this municipality — we confirm with the city.
Rear Setback where alley abuts (min)Not in our sourced tables for this municipality — we confirm with the city.
Building Coverage (max)45%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code E-SU-A setback standards (4.3, p.21) — effective 2010-06-25 · View the code

E-SU-Bsetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Rear Setback where no alley (min)Not in our sourced tables for this municipality — we confirm with the city.
Rear Setback where alley abuts (min)Not in our sourced tables for this municipality — we confirm with the city.
Zone Lot Area (min)4,500 sf
Zone Lot Width (min)35'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code E-SU-B setback standards (4.3, p.21) — effective 2010-06-25 · View the code

E-SU-Dsetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)6,000 sf
Zone Lot Width (min)50'
Height in Feet (max)30'/30'
Height in Stories (max)2.5/2.5
Bulk Plane10'/10'

Denver Zoning Code E-SU-D setback standards (4.3, p.19) — effective 2010-06-25 · View the code

E-SU-Gsetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Rear Setback where no alley (min)Not in our sourced tables for this municipality — we confirm with the city.
Rear Setback where alley abuts (min)Not in our sourced tables for this municipality — we confirm with the city.
Building Coverage (max)45%
Zone Lot Area (min)9,000 sf
Zone Lot Width (min)62.5'
Height in Feet (max)30'/30'
Height in Stories (max)2.5/2.5
Bulk Plane10'/10'

Denver Zoning Code E-SU-G setback standards (4.3, p.19) — effective 2010-06-25 · View the code

E-TU-Bsetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)3'
Side Interior Setback (min)3'
Rear Setback where no alley (min)Not in our sourced tables for this municipality — we confirm with the city.
Rear Setback where alley abuts (min)Not in our sourced tables for this municipality — we confirm with the city.
Building Coverage (max)45%
Zone Lot Area (min)4,500 sf
Zone Lot Width (min)35'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code E-TU-B setback standards (4.3, p.21) — effective 2010-06-25 · View the code

E-TU-Csetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)3' min one side/ 10' min combined
Rear Setback where no alley (min)Not in our sourced tables for this municipality — we confirm with the city.
Rear Setback where alley abuts (min)Not in our sourced tables for this municipality — we confirm with the city.
Building Coverage (max)45%
Zone Lot Area (min)5,500 sf
Zone Lot Width (min)50'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code E-TU-C setback standards (4.3, p.21) — effective 2010-06-25 · View the code

G-MS-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code G-MS-3 setback standards (6.3, p.27) — effective 2010-06-25 · View the code

G-MS-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code G-MS-5 setback standards (6.3, p.27) — effective 2010-06-25 · View the code

G-MU-12setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)5'
Side Interior Setback (min)7.5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)10'
Zone Lot Area (min)6,000 sf
Zone Lot Width (min)50'

Denver Zoning Code G-MU-12 setback standards (6.3, p.29) — effective 2010-06-25 · View the code

G-MU-20setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)5'
Side Interior Setback (min)7.5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)10'
Zone Lot Area (min)6,000 sf
Zone Lot Width (min)50'

Denver Zoning Code G-MU-20 setback standards (6.3, p.29) — effective 2010-06-25 · View the code

G-MU-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)3' min one side/10' min combined
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'

Denver Zoning Code G-MU-3 setback standards (6.3, p.17) — effective 2010-06-25 · View the code

G-MU-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'

Denver Zoning Code G-MU-5 setback standards (6.3, p.17) — effective 2010-06-25 · View the code

G-MU-8setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)7.5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)40%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'

Denver Zoning Code G-MU-8 setback standards (6.3, p.17) — effective 2010-06-25 · View the code

G-MX-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code G-MX-3 setback standards (6.3, p.27) — effective 2010-06-25 · View the code

G-RH-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)15'
Side Interior Setback (min)3'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)60%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Bulk Plane12'

Denver Zoning Code G-RH-3 setback standards (6.3, p.17) — effective 2010-06-25 · View the code

G-RO-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)3' min one side/10' min combined
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'

Denver Zoning Code G-RO-3 setback standards (6.3, p.17) — effective 2010-06-25 · View the code

G-RO-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Street Setback (min)5'
Side Interior Setback (min)5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'

Denver Zoning Code G-RO-5 setback standards (6.3, p.17) — effective 2010-06-25 · View the code

G-RX-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code G-RX-3 setback standards (6.3, p.27) — effective 2010-06-25 · View the code

G-RX-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code G-RX-5 setback standards (6.3, p.27) — effective 2010-06-25 · View the code

S-CC-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)0'
Side Street Setback (min)0'
Side Interior Setback (min)0'

Denver Zoning Code S-CC-3 setback standards (3.3, p.29) — effective 2010-06-25 · View the code

S-CC-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)0'
Side Street Setback (min)0'
Side Interior Setback (min)5'

Denver Zoning Code S-CC-5 setback standards (3.3, p.33) — effective 2010-06-25 · View the code

S-MS-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)0'
Side Street Setback (min)0'
Side Interior Setback (min)0'

Denver Zoning Code S-MS-3 setback standards (3.3, p.29) — effective 2010-06-25 · View the code

S-MU-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)13.1.5.9 or 20' , whichever
Side Street Setback (min)5'
Side Interior Setback (min)5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)50%
Zone Lot Area (min)4,500 sf
Zone Lot Width (min)37.5'
Height in Feet (max)32'/32'
Height in Stories (max)3/3

Denver Zoning Code S-MU-3 setback standards (3.3, p.21) — effective 2010-06-25 · View the code

S-MX-12setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20' 20'/25'
Side Interior Setback (min)Not in our sourced tables for this municipality — we confirm with the city.

Denver Zoning Code S-MX-12 setback standards (3.3, p.39) — effective 2010-06-25 · View the code

S-MX-12Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20' 20'/25'
Side Interior Setback (min)Not in our sourced tables for this municipality — we confirm with the city.

Denver Zoning Code S-MX-12A setback standards (3.3, p.39) — effective 2010-06-25 · View the code

S-MX-2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)0'
Side Street Setback (min)0'
Side Interior Setback (min)0'

Denver Zoning Code S-MX-2 setback standards (3.3, p.29) — effective 2010-06-25 · View the code

S-MX-2Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)40% Residential Only Buildings: 30%
Side Street Setback (min)25%
Side Interior Setback (min)0'

Denver Zoning Code S-MX-2A setback standards (3.3, p.37) — effective 2010-06-25 · View the code

S-MX-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)0'
Side Street Setback (min)0'
Side Interior Setback (min)0'

Denver Zoning Code S-MX-3 setback standards (3.3, p.31) — effective 2010-06-25 · View the code

S-MX-3Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)15'

Denver Zoning Code S-MX-3A setback standards (3.3, p.39) — effective 2010-06-25 · View the code

S-MX-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Interior Setback (min)Not in our sourced tables for this municipality — we confirm with the city.

Denver Zoning Code S-MX-5 setback standards (3.3, p.39) — effective 2010-06-25 · View the code

S-MX-5Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'
Side Interior Setback (min)Not in our sourced tables for this municipality — we confirm with the city.

Denver Zoning Code S-MX-5A setback standards (3.3, p.39) — effective 2010-06-25 · View the code

S-MX-8Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)20'

Denver Zoning Code S-MX-8A setback standards (3.3, p.39) — effective 2010-06-25 · View the code

S-RH-2.5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)5'
Side Interior Setback (min)5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)50%
Zone Lot Area (min)4,500 sf
Zone Lot Width (min)37.5'
Height in Feet (max)30'/30'
Height in Stories (max)2.5/2.5
Bulk Plane10'/10'

Denver Zoning Code S-RH-2.5 setback standards (3.3, p.21) — effective 2010-06-25 · View the code

S-SU-Asetback & dimensional standards
StandardRequirement
Side Interior Setback (min)3' 5'
Rear Setback where alley abuts (min)12'
Building Coverage (max)50%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Height in Feet (max)30'/30'
Height in Stories (max)2.5/2.5
Bulk Plane10'/10'

Denver Zoning Code S-SU-A setback standards (3.3, p.19) — effective 2010-06-25 · View the code

S-SU-FAsetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10' 5'/15'
Side Interior Setback (min)5'/15'
Rear Setback where alley abuts (min)12'
Building Coverage (max)50%
Zone Lot Area (min)8,500 sf
Zone Lot Width (min)62.5'
Height in Feet (max)30'/30'
Height in Stories (max)2.5/2.5
Bulk Plane10'

Denver Zoning Code S-SU-FA setback standards (3.3, p.19) — effective 2010-06-25 · View the code

S-SU-Isetback & dimensional standards
StandardRequirement
Side Street Setback (min)5'
Zone Lot Area (min)12,000 sf
Zone Lot Width (min)62.5'
Height in Feet (max)30'/30'
Height in Stories (max)3/3
Bulk Plane10'/10' 10'/10'

Denver Zoning Code S-SU-I setback standards (3.3, p.19) — effective 2010-06-25 · View the code

U-MS-2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code U-MS-2 setback standards (5.3, p.27) — effective 2010-06-25 · View the code

U-MS-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code U-MS-3 setback standards (5.3, p.27) — effective 2010-06-25 · View the code

U-MS-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code U-MS-5 setback standards (5.3, p.27) — effective 2010-06-25 · View the code

U-MX-2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code U-MX-2 setback standards (5.3, p.27) — effective 2010-06-25 · View the code

U-MX-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code U-MX-3 setback standards (5.3, p.27) — effective 2010-06-25 · View the code

U-RH-2.5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)10'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)40%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-RH-2.5 setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-RH-3Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)10'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)40%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-RH-3A setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-RX-3setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code U-RX-3 setback standards (5.3, p.27) — effective 2010-06-25 · View the code

U-RX-5setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)7.5'
Side Interior Setback (min)5'

Denver Zoning Code U-RX-5 setback standards (5.3, p.27) — effective 2010-06-25 · View the code

U-SU-Asetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)3'
Side Interior Setback (min)3'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)60%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-SU-A setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-SU-A2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)3'
Side Interior Setback (min)3'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)60%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-SU-A2 setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-SU-Bsetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Zone Lot Area (min)4,500 sf
Zone Lot Width (min)35'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-SU-B setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-SU-B2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)3'
Side Interior Setback (min)3'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)60%
Zone Lot Area (min)4,500 sf
Zone Lot Width (min)35'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-SU-B2 setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-SU-Csetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Interior Setback (min)3' min one 10' min combined
Zone Lot Area (min)5,500 sf
Zone Lot Width (min)50'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-SU-C setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-SU-C2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)3'
Side Interior Setback (min)3' min one 10' min combined
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)60%
Zone Lot Area (min)5,500 sf
Zone Lot Width (min)50'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-SU-C2 setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-SU-Esetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)7,000 sf
Zone Lot Width (min)50'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-SU-E setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-SU-Hsetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)5'
Side Interior Setback (min)5'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)45%
Zone Lot Area (min)10,000 sf
Zone Lot Width (min)75'
Height in Feet (max)30'/17'
Height in Stories (max)3/1
Bulk Plane17'/10'

Denver Zoning Code U-SU-H setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-TU-Bsetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)3'
Side Interior Setback (min)3'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)60%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-TU-B setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-TU-B2setback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)3'
Side Interior Setback (min)3'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)60%
Zone Lot Area (min)3,000 sf
Zone Lot Width (min)25'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-TU-B2 setback standards (5.3, p.19) — effective 2010-06-25 · View the code

U-TU-Csetback & dimensional standards
StandardRequirement
Primary Street Setback (min)10'
Side Street Setback (min)5'
Side Interior Setback (min)10'
Rear Setback where no alley (min)20'
Rear Setback where alley abuts (min)12'
Building Coverage (max)40%
Zone Lot Area (min)4,500 sf
Zone Lot Width (min)35'
Height in Feet (max)30'/17'
Height in Stories (max)2.5/1
Bulk Plane17'/10'

Denver Zoning Code U-TU-C setback standards (5.3, p.19) — effective 2010-06-25 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What this covers

Interior millwork: casing, base, crowns, and simple built-ins. Field measure existing openings; shop drawings only when the brief asks.

text

How the work is coordinated

Same quality bar as finish carpentry; this slug is the trim-focused page. Denver-metro work is permitted locally. Colorado has no statewide general-contractor license. Cities and counties license general contractors. DORA licenses electrical and plumbing (and similar regulated trades), not general contractors. Autotelic is a municipally licensed Denver general contractor that coordinates licensed specialty trades. Denver building permits run through Community Planning and Development (CPD). Costs are project-specific; no dollar figures.

FAQ

Common questions

How much does Baseboard Installation (Per Linear Foot) cost in Denver?

$6.50 each · $5.50 each for 61–150 · $4.75 each for 151+ · $99 minimum visit.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Who handles the trim & millwork permits and licensing?

A municipally licensed Denver general contractor coordinates licensed specialty trades. Colorado has no statewide general-contractor license; cities and counties license general contractors. DORA licenses electrical and plumbing, not general contractors.

What is typically in scope for trim & millwork in Denver?

Interior millwork: casing, base, crowns, and simple built-ins.

When do you need drawings or a permit?

Anything that changes structure, occupancy, or regulated electrical or plumbing usually needs a local permit. Denver building permits are reviewed by Community Planning and Development. Confirm the exact trigger with CPD for the address.

Service Area

Serving Denver

We serve Denver, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Denver project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free trim & millwork estimate in Denver

Tell us about your Denver project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…