(720) 287-7958

DESIGN · BUILD · AUTOMATE

WHEAT RIDGE SERVICES

Motorized Shades & Lighting Control in Wheat Ridge

Smart Home Assessment & Roadmap, $189

See all 2 jobs

Licensed motorized shades & lighting control services for Wheat Ridge and Jefferson County. Privacy and light on your schedule.

What Wheat Ridge requires

Use tax: Per City Code Section 22-68, use tax is charged at 3.5% of 60% of the project valuation (60% of valuation is assumed to be materials subject to tax). §22-68

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Motorized Shades & Lighting Control

Privacy and light on your schedule

Jobs you can book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • Smart Home Assessment & Roadmap

    Walk-through of your home covering lighting, locks, climate, shades, and network readiness, delivered as a written phased roadmap with firm pricing per phase.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Walk-through of your home covering lighting, locks, climate, shades, and network readiness, delivered as a written phased roadmap with firm pricing per phase. Device hardware and installation labor are not included.

  • Control System Programming Visit (Site-Priced)

    $189 visit fee — credited toward the work

    On-site programming session for professionally installed control and automation systems — scene changes, device additions, driver updates, and troubleshooting — with a firm quote for any work beyond the first visit;…

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    On-site programming session for professionally installed control and automation systems — scene changes, device additions, driver updates, and troubleshooting — with a firm quote for any work beyond the first visit; the trip fee is credited toward that work. Manufacturer licensing fees and new hardware are not included.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Motorized Shades & Lighting Control Services in Wheat Ridge, Colorado

Autotelic provides professional motorized shades & lighting control services throughout Wheat Ridge and the surrounding Jefferson County area. Motorized shades and Lutron lighting control across the Denver metro — roller shades, drapes, keypads, dimmers, scene programming, and automation. Whether you're in Wheat Ridge (central Jefferson County) or nearby communities, our team delivers quality workmanship, licensed and insured.

Permit Thresholds

Wheat Ridge permit thresholds

Code reference
Retaining walls over 4' high (or supporting a surcharge) and other structural elements like decks or room additions explicitly require permits; any structural work in a remodel would qualify as an alteration requiring a permit.
Code reference
These requirements are enforced under the City of Wheat Ridge Municipal Code, Chapter 5, Article II, Division 2 (Building Permits).
Use tax
Per City Code Section 22-68, use tax is charged at 3.5% of 60% of the project valuation (60% of valuation is assumed to be materials subject to tax).§22-68
Code reference
Permit fees are based on the higher of the applicant’s valuation or the building official’s minimum (using ICC Building Valuation Data); a separate plan review fee (65% of the permit fee) applies where required.

Codes are amended regularly — verify current requirements with **City of Wheat Ridge Building Division (City of Wheat Ridge, Colorado) issues residential building permits.

Zoning & Dimensional Standards

Setback & dimensional standards in Wheat Ridge

Zone-district dimensional standards for Wheat Ridge, quoted verbatim from the Wheat Ridge Code of Ordinances (Ch.26 Zoning). Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

A-1setback & dimensional standards
StandardRequirement
Front Setback (min)30' (c)
Side Setback (min)15'
Rear Setback (min)15' (g)
Building Coverage (max)25%
Building Height (max)35'
Lot Area (min)1 acre
Lot Width (min)140'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) A-1 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

A-2setback & dimensional standards
StandardRequirement
Front Setback (min)30' (c)
Side Setback (min)15'
Rear Setback (min)15' (g)
Building Coverage (max)25%
Building Height (max)35'
Lot Area (min)1 acre
Lot Width (min)140'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) A-2 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-1setback & dimensional standards
StandardRequirement
Front Setback (min)30' (c)
Side Setback (min)15'
Rear Setback (min)15'
Building Coverage (max)25%
Building Height (max)35'
Lot Area (min)12,500 sf
Lot Width (min)100'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-1 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-1Asetback & dimensional standards
StandardRequirement
Front Setback (min)25' (c)
Side Setback (min)10'
Rear Setback (min)15' (h)
Building Coverage (max)30%
Building Height (max)35'
Lot Area (min)9,000 sf
Lot Width (min)75'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-1A setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-1Bsetback & dimensional standards
StandardRequirement
Front Setback (min)25' (d)
Side Setback (min)5' (e)
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)7,500 sf
Lot Width (min)60'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-1B setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-1Csetback & dimensional standards
StandardRequirement
Front Setback (min)20' (d)
Side Setback (min)5'
Rear Setback (min)5'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)5,000 sf
Lot Width (min)50'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-1C setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-2setback & dimensional standards
StandardRequirement
Front Setback (min)25' (d)
Side Setback (min)5' (e)
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)9,000 sf
Lot Width (min)75'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-2 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-2Asetback & dimensional standards
StandardRequirement
Front Setback (min)25' (d)
Side Setback (min)5' (d)
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)7,500 sf
Lot Width (min)60'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-2A setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-3setback & dimensional standards
StandardRequirement
Front Setback (min)25' (e)
Side Setback (min)5'
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)7,500 sf
Lot Width (min)60'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-3 setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

R-3Asetback & dimensional standards
StandardRequirement
Front Setback (min)25' (e)
Side Setback (min)5'
Rear Setback (min)10'
Building Coverage (max)40%
Building Height (max)35'
Lot Area (min)7,500 sf
Lot Width (min)60'

Wheat Ridge Code of Ordinances (Ch.26 Zoning) R-3A setback standards (Ch.26 Art.II district standards tables) — effective 2025-01-27 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

overview

overview

This trade is shade hardware plus lighting-control hardware, not a branded whole-home automation platform. Scope includes roller, dual-roller, cellular, drapery, and exterior-screen motors; battery, 24 V Class 2, or 120 V shade power; LED drivers and dimmers (0–10 V, phase-cut, or DALI where specified); occupancy or vacancy sensors; photocells; and timeclock or astronomical schedules. Integration is typically dry-contact, RS-485, IP, or a lighting-control panel.

methods

methods

Specify shade fabric (solar, room-darkening, or dual) and pocket depth before framing closes. Conceal shade power in headers. Match LED drivers to the existing control protocol instead of mixing 0–10 V and phase-cut on one circuit. Keep lighting control off fire-alarm and emergency-lighting circuits. Exterior screens need a wind-sensor lockout. Cost is project-specific.

FAQ

Common questions

How much does Smart Home Assessment & Roadmap cost in Wheat Ridge?

$189.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

What's not included?

Device hardware and installation labor are not included.

When does Landmark apply?

Exterior motorized screens or façade lighting on a designated structure or in a historic district may need Landmark Preservation review in addition to electrical permits.

Service Area

Serving Wheat Ridge and Jefferson County

We serve Wheat Ridge, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Wheat Ridge project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free motorized shades & lighting control estimate in Wheat Ridge

Tell us about your Wheat Ridge project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…