autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

GOLDEN SERVICES

Motorized Shades & Lighting Control in Golden

Licensed motorized shades & lighting control services for Golden and Jefferson County. Privacy and light on your schedule.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Motorized Shades & Lighting Control

Privacy and light on your schedule

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Motorized Shades & Lighting Control Services in Golden, Colorado

Autotelic provides professional motorized shades & lighting control services throughout Golden and the surrounding Jefferson County area. Motorized shades and Lutron lighting control across the Denver metro — roller shades, drapes, keypads, dimmers, scene programming, and automation. Whether you're in Golden (gateway to the mountains) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Golden permit thresholds

Code reference
Building Permit Fees table (effective 05/01/11, as modified by resolutions).
Exterior
One-story detached accessory structures ≤200 sq ft (residential only); fences ≤7 ft tall (unless front yard, corner lot, or historic district); landscaping; minor roof or siding repairs/replacement (10% or less of total area); minor maintenance/repairs; painting; retaining/landscape walls ≤4 ft tall
Code reference
Retaining/landscape walls over 4 ft (or supporting surcharge) also trigger requirements, often needing engineering.
For homeowners doing their own work
materials cost × 2.
Building permit fees are calculated from a tiered table based on total valuation
$1–$500 = $25.85; higher tiers add per-$100 or per-$1,000 increments up to $1M+).
Additional plan review fee (when applicable)
65% of the permit fee.
Building use tax
3% use tax on building materials, stated as 1.5% of total valuation.

Codes are amended regularly — verify current requirements with **The City of Golden (specifically its Building Division/Building Department) issues residential building permits for properties within Golden city limits.

overview

overview

This trade is shade hardware plus lighting-control hardware, not a branded whole-home automation platform. Scope includes roller, dual-roller, cellular, drapery, and exterior-screen motors; battery, 24 V Class 2, or 120 V shade power; LED drivers and dimmers (0–10 V, phase-cut, or DALI where specified); occupancy or vacancy sensors; photocells; and timeclock or astronomical schedules. Integration is typically dry-contact, RS-485, IP, or a lighting-control panel.

permits

permits

City and County of Denver Community Planning and Development issues electrical permits for new circuits, lighting replacements, and line-voltage shade motors. CPD commercial plan-review guidance states that lighting replacements are reviewed so new lighting and lighting controls meet electrical and energy codes. Some minor electrical work can use a CPD quick permit without electrical plan review. DORA licenses electrical contractors. Cities and counties license general contractors. Colorado has no statewide general contractor license.

code

code

Denver Energy Code commercial lighting replacements are reviewed for control compliance. CASR trade guidance for DEC R404.1 states that new lighting in alterations must meet current lighting-control requirements, and Denver does not grant an exception based on the percentage of lighting replaced. Confirm the current DEC edition with CPD at permit. Landmark Preservation reviews exterior work on designated structures and in historic districts. Exterior screens or façade lighting on a designated property may need Landmark review. Interior battery shades that do not change the exterior typically do not.

methods

methods

Specify shade fabric (solar, room-darkening, or dual) and pocket depth before framing closes. Conceal shade power in headers. Match LED drivers to the existing control protocol instead of mixing 0–10 V and phase-cut on one circuit. Keep lighting control off fire-alarm and emergency-lighting circuits. Exterior screens need a wind-sensor lockout. Cost is project-specific.

FAQ

Common questions

Who handles the electrical permits and licensing?

A municipally licensed Denver general contractor coordinates licensed specialty trades. CPD issues electrical permits. DORA licenses electrical contractors. Colorado has no statewide general contractor license.

Do battery shades need a permit?

Interior battery shades that do not add line-voltage wiring typically do not need a building permit. Hardwired 120 V motors and new lighting circuits do. Confirm with CPD for the specific scope.

Does replacing some of the lights skip energy-code controls?

Denver CASR trade guidance for DEC R404.1 states that new lighting in alterations must meet current lighting-control requirements. Denver does not grant an exception based on the percentage of lighting replaced. Confirm the current edition with CPD.

When does Landmark apply?

Exterior motorized screens or façade lighting on a designated structure or in a historic district may need Landmark Preservation review in addition to electrical permits.

Service Area

Serving Golden and Jefferson County

We serve Golden, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Golden project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free motorized shades & lighting control estimate in Golden

Tell us about your Golden project — we respond fast, and estimates are always free.

Name, phone, and email required.