autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

CHERRY HILLS VILLAGE SERVICES

EV Charging in Cherry Hills Village

Licensed EV charging services for Cherry Hills Village and Arapahoe County. Charge at home or work.

What Cherry Hills Village requires

Code reference: ### Exempt Work (Cherry Hills Village Municipal Code Section 105.2, referencing adopted I-Codes) §105.2

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
EV Charging

Charge at home or work

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

EV Charging Services in Cherry Hills Village, Colorado

Autotelic provides professional EV charging services throughout Cherry Hills Village and the surrounding Arapahoe County area. Level 2 and commercial DC fast charger installation with dedicated circuits, conduit, and smart charging management. Whether you're in Cherry Hills Village (affluent south Denver) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Cherry Hills Village permit thresholds

Code reference
The Village adopted the 2024 International Codes (I-Codes) at the beginning of 2026, including the 2024 International Residential Code (IRC), and adheres to Chapter 18 of the Cherry Hills Village Municipal Code for building regulations.
Code reference
If an addition is more than 50% of the existing square footage, or if the aggregate floor area is demolished or reconstructed by more than 50%, or increased by 50% or more, the project is considered "redevelopment" and may have additional submittal and drainage requirements per Chapter 9 of the zoni
Code reference
Any electrical work on 400 amps (320 continuous) or greater requires a separate plan review.
Impervious Surface
If more than 2,500 square feet of impervious surface is added cumulatively (e.g., house addition, driveway, patio), a Phase III Drainage Plan is required.
Code Reference
Cherry Hills Village Municipal Code, Chapter 18, and the adopted 2024 International Residential Code.
Code reference
### Exempt Work (Cherry Hills Village Municipal Code Section 105.2, referencing adopted I-Codes)§105.2
Code reference
One-story detached, prefabricated storage sheds that do not exceed 120 square feet.
Code Reference
Cherry Hills Village Municipal Code, Section 105.2, referencing adopted I-Codes.§105.2
§105.2

Codes are amended regularly — verify current requirements with **The City of Cherry Hills Village (specifically its Building Division under Community Development) issues residential building permits.

text

What EV charging work covers

EV charging projects in the Denver metro typically include selecting a Level 2 charger location, running a dedicated circuit from the panel, mounting the equipment, and inspecting the install. Some sites need a panel or service upgrade first. A municipally licensed Denver general contractor coordinates the project and licensed specialty trades for the electrical work. Cost is project-specific and depends on run length, amperage, and panel condition.

text

Capacity first

Panel space and service size determine whether a charger circuit can be added as-is. Long runs and outdoor mounts add conduit and weatherproofing details.

text

Permits and who coordinates the work

New EV circuits typically need electrical permits and inspections through City and County of Denver Community Planning and Development (or the local building department). Colorado DORA regulates electrical licensing. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades for EV charging scopes.

text

What buyers should prepare

Vehicle charging needs, parking spot, panel photos if available, and whether the charger is indoor or outdoor.

FAQ

Common questions

Do EV chargers need a Denver permit?

Usually yes for the new electrical circuit. CPD is the common local path inside Denver.

Who handles EV charging permits and licensing?

A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Colorado has no statewide general contractor license.

Will my panel support a Level 2 charger?

It depends on service size and existing loads. A site assessment should check capacity before ordering equipment.

Hardwired or plug-in EVSE?

Both exist. Hardwired units are common outdoors; the electrical design should match the manufacturer instructions and code.

What information helps define scope?

Parking location, desired amperage, panel photos, indoor vs outdoor, and city or county.

Service Area

Serving Cherry Hills Village and Arapahoe County

We serve Cherry Hills Village, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Cherry Hills Village project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free EV charging estimate in Cherry Hills Village

Tell us about your Cherry Hills Village project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…