autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

AURORA SERVICES

EV Charging in Aurora

Licensed EV charging services for Aurora and Arapahoe/Adams County. Charge at home or work.

What Aurora requires

Aurora City Code § 22-184 (amending IRC R105.2) exempts only: one-story detached accessory residential storage sheds, playhouses, or shade structures ≤120 sq ft, not attached to the residence, and not used for vehicle storage. § 22-184

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
EV Charging

Charge at home or work

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

EV Charging Services in Aurora, Colorado

Autotelic provides professional EV charging services throughout Aurora and the surrounding Arapahoe/Adams County area. Level 2 and commercial DC fast charger installation with dedicated circuits, conduit, and smart charging management. Whether you're in Aurora (Colorado's third-largest city) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permits & Licensing

Permits in Aurora

Aurora building permits are issued by the Building Division's Permit Center, which also handles public improvement, sign, and lawn and irrigation permits. Contractor licensing is a City of Aurora requirement, and applications go through the Aurora4Biz.org online portal. Authority: City of Aurora — Building Division (Permit Center).

Permit Thresholds

Aurora permit thresholds

Code reference
Permits are generally required for residential remodel work in Aurora, Colorado, per the adopted building codes (primarily the 2021 International Residential Code (IRC) with local amendments in Aurora City Code Chapter 22, Article V), unless specifically exempt.
Aurora City Code § 22-184 (amending IRC R105.2) exempts only
one-story detached accessory residential storage sheds, playhouses, or shade structures ≤120 sq ft, not attached to the residence, and not used for vehicle storage.§ 22-184
Code reference
Aurora City Code § 22-135 (amending IBC 105.2) has similar limited exemptions for certain small accessory structures, fences ≤7 ft high (plus all chain-link fences), and antennae/towers ≤25 ft high.§ 22-135
Structural triggers
Any structural alteration, addition, or work affecting load-bearing elements generally requires a permit under the adopted IRC (see R105 and amendments).
Use tax (construction materials use tax)
Prior to permit issuance, a deposit is required based on 3.75% (three and three-fourths percent) applied to 50% of the total estimated cost of the building/construction/reconstruction/alteration/expansion/modification/improvement (or 100% of the total estimated cost of construction materials/
Code reference
This is per Aurora City Code § 130-61.§ 130-61.
Code reference
All information is based on the Aurora Municipal Code (Chapter 22) and official city resources.

Codes are amended regularly — verify current requirements with City of Aurora — Building Division (Permit Center).

Zoning & Dimensional Standards

Setback & dimensional standards in Aurora

Zone-district dimensional standards for Aurora, quoted verbatim from the Aurora Unified Development Ordinance. Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

I-1setback & dimensional standards
StandardRequirement
Rear Setback (min)5 ft.

Aurora Unified Development Ordinance I-1 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

I-2setback & dimensional standards
StandardRequirement
Rear Setback (min)5 ft.

Aurora Unified Development Ordinance I-2 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-1setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)6,000 sf. [1]
Lot Frontage, Single-Family Detached (min)Subarea A: 50 ft. Subarea B: 60 ft.
Front Setback (min)25 ft. [4]
Side Interior Setback (min)5 ft. [6]
Side Setback Abutting Local Street (min)12.5 ft.
Rear Setback (min)20 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-1 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-2setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)6,000 sf. [1]
Lot Frontage, Single-Family Detached (min)Subarea A: 50 ft. Subarea B: 60 ft.
Front Setback (min)20 ft. [4]
Side Interior Setback (min)5 ft.[6]
Side Setback Abutting Local Street (min)10 ft.
Rear Setback (min)15 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-2 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-3setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)5,000 sf.
Lot Frontage, Single-Family Detached (min)50 ft.
Front Setback (min)15 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)10 ft.
Rear Setback (min)10 ft.
Building Height (max)45 ft.[7]

Aurora Unified Development Ordinance R-3 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-4setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)5,000 sf.
Lot Frontage, Single-Family Detached (min)50 ft.
Front Setback (min)12 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)7.5 ft.
Rear Setback (min)10 ft.
Building Height (max)65 ft.[8]

Aurora Unified Development Ordinance R-4 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-MHsetback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)[2]
Front Setback (min)15 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)15 ft.
Rear Setback (min)8 ft.
Building Height (max)20 ft.[9]

Aurora Unified Development Ordinance R-MH setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-Rsetback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)43,560 sf.
Lot Frontage, Single-Family Detached (min)120 ft.
Front Setback (min)30 ft.
Side Interior Setback (min)10 ft.
Side Setback Abutting Local Street (min)25 ft.
Rear Setback (min)25 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-R setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What EV charging work covers

EV charging projects in the Denver metro typically include selecting a Level 2 charger location, running a dedicated circuit from the panel, mounting the equipment, and inspecting the install. Some sites need a panel or service upgrade first. A municipally licensed Denver general contractor coordinates the project and licensed specialty trades for the electrical work. Cost is project-specific and depends on run length, amperage, and panel condition.

text

Capacity first

Panel space and service size determine whether a charger circuit can be added as-is. Long runs and outdoor mounts add conduit and weatherproofing details.

text

Permits and who coordinates the work

New EV circuits typically need electrical permits and inspections through City and County of Denver Community Planning and Development (or the local building department). Colorado DORA regulates electrical licensing. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades for EV charging scopes.

text

What buyers should prepare

Vehicle charging needs, parking spot, panel photos if available, and whether the charger is indoor or outdoor.

FAQ

Common questions

Do EV chargers need a Denver permit?

Usually yes for the new electrical circuit. CPD is the common local path inside Denver.

Who handles EV charging permits and licensing?

A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Colorado has no statewide general contractor license.

Will my panel support a Level 2 charger?

It depends on service size and existing loads. A site assessment should check capacity before ordering equipment.

Hardwired or plug-in EVSE?

Both exist. Hardwired units are common outdoors; the electrical design should match the manufacturer instructions and code.

What information helps define scope?

Parking location, desired amperage, panel photos, indoor vs outdoor, and city or county.

Service Area

Serving Aurora and Arapahoe/Adams County

We serve Aurora, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Aurora project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free EV charging estimate in Aurora

Tell us about your Aurora project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…