autotelic.build
Selected Work

Designed. Built. Automated.

Real projects, verified — from free-roam VR arenas to school campuses, each tagged with the pillars it proves.

Venue Technology

The “Automate” flagships

Spaces we built and then made intelligent — including one venue running our own Barbot software on infrastructure we installed.

More Case Studies
Under-slab plumbing rough-in and wall framing underway inside the ADU

RESIDENTIAL / ADU · 2026

Currently building

Backyard ADU — Denver

A ground-up backyard ADU in Denver — designed, permitted, and now under construction by Autotelic, and the first project managed end-to-end on Buildbot, Autotelic’s own construction-management platform.

  • Design
  • Build
  • Automate
Case study →
Finished high-bay showroom with polished concrete floors and powersports inventory staged

RETAIL / COMMERCIAL · 2017

Powersports Dealership — Tenant Finish

Autotelic delivered the commercial tenant finish that transformed a raw high-bay shell into a complete powersports dealership — showroom, service department, parts counter, and customer lounge — ready for the dealership’s summer 2017 opening.

  • Build
Case study →
White kitchen island under the vaulted window wall

RESIDENTIAL / FULL-HOME REMODEL

From Burst Pipe to Full-Home Equity Play

A waterline burst while the owners were on vacation, triggering an insurance claim for floors and drywall. Instead of a like-for-like patch, Autotelic showed the owners how combining the claim with a planned remodel would buy a real equity position — then delivered the full scope: kitchen, two baths, a bearing wall out with a flush beam, a master-bath expansion with a curbless wet room, and new floors throughout. The owners sold a few years later at a profit.

  • Design
  • Build
Case study →
Custom timber pergola frame under construction against the restaurant’s glass front

RESTAURANT & HOSPITALITY

Italian Restaurant Patio — Outdoor Dining

Autotelic designed and built an expanded outdoor dining patio for a family-owned Italian restaurant — adding revenue-generating seat capacity and a branded al-fresco experience.

  • Design
  • Build
Case study →
Front elevation — brick screen tower and board-and-batten upper — Sunnyside modular

RESIDENTIAL / MODULAR NEW BUILD · 2026

Just completed

Sunnyside Modular New Build

A 5-bed, 4-bath, 4,000 sq ft modular home in Denver’s Sunnyside neighborhood — factory-built modules set by crane, finished on site, and sold in 2026 for $1.7M.

  • Design
  • Build
Case study →
COMING SOON

HOSPITALITY TECHNOLOGY / ENTERTAINMENT VENUE · 2026

Just completed

BARna SCTB — Full Venue A/V, Edge Compute & Barbot Platform

Autotelic delivered BARna SCTB’s complete technology layer across two floors — a 10-display bar video wall, 28+ independently addressable screens, custom karaoke suites, zoned DJ audio, AI-camera surveillance, and edge compute running Autotelic’s own Barbot venue-operations platform — one headend, no third-party SaaS subscriptions.

  • Design
  • Automate
Case study →
COMING SOON

RESTAURANT & HOSPITALITY

Bender’s Bar & Grill — Lakeside Patio

Autotelic designed and built Bender’s 80-seat lakeside patio at the Westminster Promenade — a scenic, high-capacity outdoor dining deck overlooking Promenade Lake that meaningfully expands revenue-generating seat count.

  • Design
  • Build
Case study →
More Projects

From the job archive — real Autotelic sites across the Front Range. Full write-ups as project details are documented.

Red-iron steel frame and roof purlins going up on open prairie in Sedalia

COMMERCIAL / STRUCTURAL STEEL · 2025

Steel Building — Red-Iron Frame

Sedalia, CO

Red-iron steel building on open prairie — frame, secondary steel, and erection (Aug–Nov 2025).

Dual-bay A/V rack with patch panel, network gear, matrix and multichannel amplifiers

SMART HOME / A/V

Whole-Home A/V Rack Build

Denver metro

Dual-bay rack — patch panel, network, matrix/DSP, multichannel amplification, UPS.

Drilled-pier rig on a fenced Denver jobsite next to the existing brick home

RESIDENTIAL / NEW BUILD · 2024

New Build + Addition

Denver, CO

Ground-up build with drilled-pier foundation — permitted jobsite (2024).

Platt Park custom home exterior at completion

RESIDENTIAL / CUSTOM HOME · 2016

Platt Park Custom Home

Platt Park, Denver

Custom home build — completed December 2016.

Littleton custom home through exterior completion, scaffolding still up

RESIDENTIAL / CUSTOM HOME · 2017

Littleton Custom Home

Littleton, CO

Custom home through exterior completion (2017).

Brick Arvada ranch with lumber package staged and new framing underway

RESIDENTIAL / ADDITION · 2018

Arvada Home Addition

Arvada, CO

Brick ranch gaining new framing and roof structure (2018).

Finished kitchen inside the remodel

RESIDENTIAL / REMODEL · 2025

Kitchen & Two-Bath Remodel

Denver metro

Interior remodel — kitchen and bathrooms, demo through finish. Completed early 2025.

Open-concept kitchen remodel in finish stage

RESIDENTIAL / KITCHEN · 2025

Open-Concept Kitchen Remodel

Denver metro

Kitchen remodel with kitchen/living wall removal and whole-floor refinish (2025–2026).

Ready to start your project?