(720) 287-7958

DESIGN · BUILD · AUTOMATE

CENTENNIAL SERVICES

Demolition in Centennial

Site visit and written estimate, $149

Licensed demolition services for Centennial and Arapahoe County. Controlled demo with precision.

What Centennial requires

Code reference: In Centennial, Colorado, building permits for residential remodel work are governed by the 2021 International Residential Code (IRC) Section R105 (adopted via Centennial Municipal Code Chapter 18 – Building Regulations, per Ordinance 2023-O-06 and related adoptions of the 2021 I-Codes). §R105

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Demolition

Controlled demo with precision

Book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • Site visit and written estimate

    We come out, look at the job and send you a written estimate.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    We come out, look at the job and send you a written estimate. The visit is credited to the job if you go ahead.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Demolition Services in Centennial, Colorado

Autotelic provides professional demolition services throughout Centennial and the surrounding Arapahoe County area. Selective and full demolition services including hazardous material abatement, structural demo, and complete haul-off. Whether you're in Centennial (south Denver metro) or nearby communities, our team delivers quality workmanship, licensed and insured.

The build sequence for a Demolition project

Every project starts with a feasibility study; this trade is priced from the same assemblies.

  1. Demolition feasibility in Centennial
  2. How a Demolition project is estimated

Start a Demolition feasibility study

Permits & Licensing

Permits in Centennial

Centennial building permits, inspections, and contractor license approvals are handled by the city's Building Division. Permits and contractor licenses must be applied for online through the city's Self-Service Portal, and we handle that process as part of every project. Authority: City of Centennial — Building Division.

Permit Thresholds

Centennial permit thresholds

Code reference
In Centennial, Colorado, building permits for residential remodel work are governed by the 2021 International Residential Code (IRC) Section R105 (adopted via Centennial Municipal Code Chapter 18 – Building Regulations, per Ordinance 2023-O-06 and related adoptions of the 2021 I-Codes).§R105
Code reference
Typically exempt work (aligning with IRC R105.2 exemptions, with local application) includes:
Code reference
One-story detached accessory structures (e.g., sheds) ≤200 sq ft.
Code reference
Fences ≤7 ft high; retaining walls ≤4 ft high (measured from bottom of footing).
Code reference
Prefabricated swimming pools <24 inches deep.
Code reference
Window awnings projecting ≤54 inches.
Code reference
Decks ≤200 sq ft, ≤30 inches above grade, and not attached to the dwelling.
Use tax (not collapsed into a single rate)
City of Centennial Use Tax of 2.5% applied to the actual cost of materials, plus Arapahoe County Use Tax of 0.25% applied to the actual cost of materials.

Codes are amended regularly — verify current requirements with City of Centennial — Building Division.

Energy Code

Centennial energy code quick facts

Code reference
Centennial, Colorado, has adopted the 2018 IECC (with the 2021 I-Codes package) as its energy code, with no mention of Denver-specific overlays such as the Denver Green Code or Energize Denver.
Code reference
This is enforced by the City’s Building Division under Ordinance No. 2023-O-06 (adopting the referenced codes by reference, effective as part of the 2021/2023 code update package).Ord. No. 2023-O-06
Code reference
Centennial is in Climate Zone 5B.
Code reference
The code applies to alterations, additions, and remodels per IECC Chapter 5 (existing buildings), with the prescriptive requirements of Chapter 4 (or equivalent U-factor/UA paths) generally applying to new or modified portions of the thermal envelope.
Code reference
Key prescriptive requirements relevant to remodels/additions (drawn from 2018 IECC Table R402.1.2 and related sections for CZ 5; these are the base code values with no local amendments identified that alter them):
Ceiling/attic insulation
Minimum R-49 (or equivalent U-factor ≤ 0.026).
Adopting reference
2018 IECC R402.1.2 (Table R402.1.2).
Wood-frame wall insulation
R-20 cavity or R-13 cavity + R-5 continuous insulation (or equivalent U-factor ≤ 0.060).
Ord. No. 2023-O-06Source: centennialco.gov

Codes are amended regularly — verify current requirements with City of Centennial — Building Division.

text

What demolition work covers

Demolition in the Denver metro ranges from selective interior tear-out to partial exterior removal and full structure demo with haul-off. Dust, noise, and utility disconnects are part of planning. A municipally licensed Denver general contractor coordinates demolition and related specialty trades for disconnects and abatement when required. Cost is project-specific and depends on volume, access, disposal, and hazardous-material handling.

text

Selective vs full demo

Selective demo protects adjacent finishes and structure. Full demo needs clear limits, safety fencing, and often more formal permitting and noticing.

text

What buyers should prepare

Demo limits, salvage preferences, building age, and whether hazardous materials testing has been done.

FAQ

Common questions

How much does Site visit and written estimate cost in Centennial?

$149.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Who handles demolition permits and licensing?

A municipally licensed Denver general contractor coordinates the project and related specialty trades. Colorado has no statewide general contractor license.

What about lead paint in older buildings?

Disturbing paint in pre-1978 housing can trigger EPA RRP requirements. Testing and work practices should be planned before demo.

Can materials be salvaged?

Sometimes. Salvage goals should be written into the scope before tear-out starts.

What information helps define scope?

Photos or plans of what stays vs goes, building age, access constraints, and city or county.

Service Area

Serving Centennial and Arapahoe County

We serve Centennial, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Centennial project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free demolition estimate in Centennial

Tell us about your Centennial project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…