autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

AURORA SERVICES

Demolition in Aurora

Licensed demolition services for Aurora and Arapahoe/Adams County. Controlled demo with precision.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Demolition

Controlled demo with precision

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Demolition Services in Aurora, Colorado

Autotelic provides professional demolition services throughout Aurora and the surrounding Arapahoe/Adams County area. Selective and full demolition services including hazardous material abatement, structural demo, and complete haul-off. Whether you're in Aurora (Colorado's third-largest city) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permits & Licensing

Permits in Aurora

Aurora building permits are issued by the Building Division's Permit Center, which also handles public improvement, sign, and lawn and irrigation permits. Contractor licensing is a City of Aurora requirement, and applications go through the Aurora4Biz.org online portal. Authority: City of Aurora — Building Division (Permit Center).

Zoning & Dimensional Standards

Setback & dimensional standards in Aurora

Zone-district dimensional standards for Aurora, quoted verbatim from the Aurora Unified Development Ordinance. Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

I-1setback & dimensional standards
StandardRequirement
Rear Setback (min)5 ft.

Aurora Unified Development Ordinance I-1 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

I-2setback & dimensional standards
StandardRequirement
Rear Setback (min)5 ft.

Aurora Unified Development Ordinance I-2 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-1setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)6,000 sf. [1]
Lot Frontage, Single-Family Detached (min)Subarea A: 50 ft. Subarea B: 60 ft.
Front Setback (min)25 ft. [4]
Side Interior Setback (min)5 ft. [6]
Side Setback Abutting Local Street (min)12.5 ft.
Rear Setback (min)20 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-1 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-2setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)6,000 sf. [1]
Lot Frontage, Single-Family Detached (min)Subarea A: 50 ft. Subarea B: 60 ft.
Front Setback (min)20 ft. [4]
Side Interior Setback (min)5 ft.[6]
Side Setback Abutting Local Street (min)10 ft.
Rear Setback (min)15 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-2 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-3setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)5,000 sf.
Lot Frontage, Single-Family Detached (min)50 ft.
Front Setback (min)15 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)10 ft.
Rear Setback (min)10 ft.
Building Height (max)45 ft.[7]

Aurora Unified Development Ordinance R-3 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-4setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)5,000 sf.
Lot Frontage, Single-Family Detached (min)50 ft.
Front Setback (min)12 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)7.5 ft.
Rear Setback (min)10 ft.
Building Height (max)65 ft.[8]

Aurora Unified Development Ordinance R-4 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-MHsetback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)[2]
Front Setback (min)15 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)15 ft.
Rear Setback (min)8 ft.
Building Height (max)20 ft.[9]

Aurora Unified Development Ordinance R-MH setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-Rsetback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)43,560 sf.
Lot Frontage, Single-Family Detached (min)120 ft.
Front Setback (min)30 ft.
Side Interior Setback (min)10 ft.
Side Setback Abutting Local Street (min)25 ft.
Rear Setback (min)25 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-R setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What demolition work covers

Demolition in the Denver metro ranges from selective interior tear-out to partial exterior removal and full structure demo with haul-off. Dust, noise, and utility disconnects are part of planning. A municipally licensed Denver general contractor coordinates demolition and related specialty trades for disconnects and abatement when required. Cost is project-specific and depends on volume, access, disposal, and hazardous-material handling.

text

Selective vs full demo

Selective demo protects adjacent finishes and structure. Full demo needs clear limits, safety fencing, and often more formal permitting and noticing.

text

Permits and who coordinates the work

City and County of Denver Community Planning and Development commonly requires demolition permits for substantial or full demolitions, and partial demo may need plans showing what remains. Landmark or citywide demolition review can apply. Pre-1978 paint disturbance can trigger EPA RRP rules. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades when utility or abatement work is included.

text

What buyers should prepare

Demo limits, salvage preferences, building age, and whether hazardous materials testing has been done.

FAQ

Common questions

Do I need a Denver demolition permit?

Often yes for full or substantial demolitions. Confirm with CPD; partial interior demo rules depend on scope.

Who handles demolition permits and licensing?

A municipally licensed Denver general contractor coordinates the project and related specialty trades. Colorado has no statewide general contractor license.

What about lead paint in older buildings?

Disturbing paint in pre-1978 housing can trigger EPA RRP requirements. Testing and work practices should be planned before demo.

Can materials be salvaged?

Sometimes. Salvage goals should be written into the scope before tear-out starts.

What information helps define scope?

Photos or plans of what stays vs goes, building age, access constraints, and city or county.

Service Area

Serving Aurora and Arapahoe/Adams County

We serve Aurora, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Aurora project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free demolition estimate in Aurora

Tell us about your Aurora project — we respond fast, and estimates are always free.

Name, phone, and email required.