(720) 287-7958

DESIGN · BUILD · AUTOMATE

BROOMFIELD SERVICES

Demolition in Broomfield

Site visit and written estimate, $149

Licensed demolition services for Broomfield. Controlled demo with precision.

What Broomfield requires

Code reference: Permits and inspections verify compliance with adopted codes (primarily the 2024 International Residential Code and related codes via Ordinance 2295, effective April 15, 2026, under Title 15 / Chapter 15-03 of the Broomfield Municipal Code). Ord. 2295

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Demolition

Controlled demo with precision

Book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • Site visit and written estimate

    We come out, look at the job and send you a written estimate.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    We come out, look at the job and send you a written estimate. The visit is credited to the job if you go ahead.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Demolition Services in Broomfield, Colorado

Autotelic provides professional demolition services throughout Broomfield and the surrounding area. Selective and full demolition services including hazardous material abatement, structural demo, and complete haul-off. Whether you're in Broomfield (city and county between Denver and Boulder) or nearby communities, our team delivers quality workmanship, licensed and insured.

The build sequence for a Demolition project

Every project starts with a feasibility study; this trade is priced from the same assemblies.

  1. Demolition feasibility in Broomfield
  2. How a Demolition project is estimated

Start a Demolition feasibility study

Permit Thresholds

Broomfield permit thresholds

Code reference
Permits and inspections verify compliance with adopted codes (primarily the 2024 International Residential Code and related codes via Ordinance 2295, effective April 15, 2026, under Title 15 / Chapter 15-03 of the Broomfield Municipal Code).Ord. 2295
Use tax (not collapsed into a single rate)
Broomfield collects use tax of 4.15% applied to 50% of the total project valuation (assumed materials portion) at permit issuance for building materials.
Code reference
Use tax of 4.15% is also charged on 50% of site work valuation (e.g., landscaping, patios) per BMC §§ 3-08-040 and 3-08-060; exemptions are in BMC § 3-08-050.§ 3-08-040
Code reference
All information derives from Broomfield’s official Building Division resources and municipal code references (Title 15, Chapter 15-03, and use tax chapter 3-08).

Codes are amended regularly — verify current requirements with **The City and County of Broomfield (specifically its Building Division in the Community Development Department) issues residential building permits.

Energy Code

Broomfield energy code quick facts

Code reference
Broomfield, Colorado (climate zone 5B), has adopted the 2024 International Energy Conservation Code (IECC) as amended by the Colorado Model Low Energy and Carbon Code (MLECC/LECC), via Ordinance 2295 (effective April 15, 2026, for permits issued on or after that date).Ord. 2295
Code reference
This replaces the prior 2021 IECC cycle.
Code reference
Key prescriptive or related requirements relevant to remodels/additions (drawn from the adopted 2024 IECC + MLECC framework; specific numeric envelope values like R-values or U-factors follow the base 2024 IECC tables for zone 5B unless further amended locally, with emphasis on performance/credits,
Air leakage/ testing thresholds (R402.5.1.3 or equivalent in MLECC amendments)
Maximum air leakage rates vary by climate zone and compliance path (e.g., prescriptive or ERI); testing required for many additions/alterations affecting the envelope.
Electric-ready requirements (new Section R409/C410 in MLECC, integrated with pri
Dedicated branch circuits, appropriately sized panel space, labeling, and condensate drainage provisions for future electrification of space heating, water heating, cooking, and clothes drying where combustion equipment is present (applies to alterations adding or replacing such systems).§R409
Solar-ready zone (R409/C410 in MLECC)
Designated solar-ready roof zone with construction document specifications for single-family, townhomes, and certain multifamily (applies to new roofs or major roof work in remodels/additions).
EV-ready spaces (R409/C410 in MLECC, with local amendment)
Conduit/raceway, panel capacity, wiring, and overcurrent protection for future EV charging; local amendment adjusts thresholds (e.g., for smaller lots) and requires at least 20% or a minimum of 2 spaces EV-ready in certain commercial contexts.
Energy efficiency credits (R408/C406 in MLECC)
Additional credits required based on conditioned floor area, occupancy, climate zone (5B), and combustion vs.

Codes are amended regularly — verify current requirements with **The City and County of Broomfield (specifically its Building Division in the Community Development Department) issues residential building permits.

text

What demolition work covers

Demolition in the Denver metro ranges from selective interior tear-out to partial exterior removal and full structure demo with haul-off. Dust, noise, and utility disconnects are part of planning. A municipally licensed Denver general contractor coordinates demolition and related specialty trades for disconnects and abatement when required. Cost is project-specific and depends on volume, access, disposal, and hazardous-material handling.

text

Selective vs full demo

Selective demo protects adjacent finishes and structure. Full demo needs clear limits, safety fencing, and often more formal permitting and noticing.

text

What buyers should prepare

Demo limits, salvage preferences, building age, and whether hazardous materials testing has been done.

FAQ

Common questions

How much does Site visit and written estimate cost in Broomfield?

$149.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Who handles demolition permits and licensing?

A municipally licensed Denver general contractor coordinates the project and related specialty trades. Colorado has no statewide general contractor license.

What about lead paint in older buildings?

Disturbing paint in pre-1978 housing can trigger EPA RRP requirements. Testing and work practices should be planned before demo.

Can materials be salvaged?

Sometimes. Salvage goals should be written into the scope before tear-out starts.

What information helps define scope?

Photos or plans of what stays vs goes, building age, access constraints, and city or county.

Service Area

Serving Broomfield

We serve Broomfield, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Broomfield project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free demolition estimate in Broomfield

Tell us about your Broomfield project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…