autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

LITTLETON SERVICES

Demolition in Littleton

Licensed demolition services for Littleton and Arapahoe County. Controlled demo with precision.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Demolition

Controlled demo with precision

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Demolition Services in Littleton, Colorado

Autotelic provides professional demolition services throughout Littleton and the surrounding Arapahoe County area. Selective and full demolition services including hazardous material abatement, structural demo, and complete haul-off. Whether you're in Littleton (historic downtown Littleton) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permits & Licensing

Permits in Littleton

Littleton building permits are issued by the Community Development Department's Building Division and Permit Center, and a license or registration certificate is required to obtain permits for work within city limits. Applications, plan submittals, and inspection scheduling run through the eTRAKiT online system. Authority: City of Littleton — Community Development Department (Building Division / Permit Center).

Permit Thresholds

Littleton permit thresholds

Code reference
Littleton has adopted the 2024 International Residential Code (IRC) and other International Codes (with local amendments) under Littleton City Code Title 4, Building Regulations, Chapter 1.
Code reference
Standard IRC Section R105.2 exemptions typically apply (e.g., certain minor non-structural repairs, painting, or very small accessory structures), but Littleton provides no separate local valuation threshold below which permits are automatically waived for remodel/alteration work.Section R105.2
Code reference
Exempt work lists and structural triggers are governed by the adopted 2024 IRC (with amendments) and Littleton’s submittal policies.
Code reference
Minor cosmetic or non-structural work (e.g., painting, flooring replacement without affecting structure) is typically exempt under IRC R105.2.
Building permit fees follow a tiered schedule based on total valuation (e.g., $1
$25.85; higher tiers add incremental amounts per $100 or $1,000).
Code reference
Plan review fee is 65% of the permit fee(s) when blueprints/construction documents are reviewed.
Code reference
Use tax deposit = 0.01969 × total job valuation, calculated as ((total job valuation × 52.5%) × 3.75%).
Code reference
Arapahoe County Open Space Tax = 0.00125 × total valuation, calculated as ((total job valuation × 50%) × 0.25%).

Codes are amended regularly — verify current requirements with City of Littleton — Community Development Department (Building Division / Permit Center).

Energy Code

Littleton energy code quick facts

Code reference
2024 IECC (residential and commercial provisions), as adopted by reference with amendments in Littleton City Code Title 4, Chapter 1 (Ordinance 11, Series 2025). The city also adopts the Colorado Model Electric Ready and Solar Ready Code (June 1, 2023 version).Ordinance 11
Code reference
Prescriptive R-values/U-factors are unchanged from the 2024 I-codes (no local reductions or increases).
Code reference
Littleton is in Climate Zone 5B.
Code reference
Alterations/additions to the building thermal envelope (new assemblies, modifications, or change-in-use) must generally meet the new-construction prescriptive requirements below; existing assemblies that are exposed but not modified may be insulated to the greatest extent possible without exceeding
Code reference
Some exceptions apply (e.g., storm windows, roof recovers) provided energy use is not increased (amended C503.2 / R503.1.1).
Ceiling/attic insulation
R-49 (or R-38 over 100% of the area if uncompressed R-38 extends over the wall top plate at eaves; limited reduction to R-30 allowed for certain roof/ceiling designs up to 500 sf or 20% of ceiling area).
Adopting reference/ordinance
2024 IECC Table R402.1.2 / IRC Table N1102.1.2 (as consolidated in city table, note b/c).
Wood-framed above-grade walls
R-20ci only, or R-13cav + R-10ci, or R-20cav + R-5ci, or R-30cav only.

Codes are amended regularly — verify current requirements with City of Littleton — Community Development Department (Building Division / Permit Center).

text

What demolition work covers

Demolition in the Denver metro ranges from selective interior tear-out to partial exterior removal and full structure demo with haul-off. Dust, noise, and utility disconnects are part of planning. A municipally licensed Denver general contractor coordinates demolition and related specialty trades for disconnects and abatement when required. Cost is project-specific and depends on volume, access, disposal, and hazardous-material handling.

text

Selective vs full demo

Selective demo protects adjacent finishes and structure. Full demo needs clear limits, safety fencing, and often more formal permitting and noticing.

text

Permits and who coordinates the work

City and County of Denver Community Planning and Development commonly requires demolition permits for substantial or full demolitions, and partial demo may need plans showing what remains. Landmark or citywide demolition review can apply. Pre-1978 paint disturbance can trigger EPA RRP rules. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades when utility or abatement work is included.

text

What buyers should prepare

Demo limits, salvage preferences, building age, and whether hazardous materials testing has been done.

FAQ

Common questions

Do I need a Denver demolition permit?

Often yes for full or substantial demolitions. Confirm with CPD; partial interior demo rules depend on scope.

Who handles demolition permits and licensing?

A municipally licensed Denver general contractor coordinates the project and related specialty trades. Colorado has no statewide general contractor license.

What about lead paint in older buildings?

Disturbing paint in pre-1978 housing can trigger EPA RRP requirements. Testing and work practices should be planned before demo.

Can materials be salvaged?

Sometimes. Salvage goals should be written into the scope before tear-out starts.

What information helps define scope?

Photos or plans of what stays vs goes, building age, access constraints, and city or county.

Service Area

Serving Littleton and Arapahoe County

We serve Littleton, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Littleton project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free demolition estimate in Littleton

Tell us about your Littleton project — we respond fast, and estimates are always free.

Name, phone, and email required.