(720) 287-7958

DESIGN · BUILD · AUTOMATE

FEDERAL HEIGHTS SERVICES

Demolition in Federal Heights

Site visit and written estimate, $149

Licensed demolition services for Federal Heights and Adams County. Controlled demo with precision.

What Federal Heights requires

Code reference: Federal Heights, CO (Municipal Code Chapter 10, Article II, as amended by Ordinance No. 21-01, adopting the 2018 International Codes with local amendments) requires building permits for most residential remodel/alteration work, with limited exemptions. Ord. No. 21-01

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Demolition

Controlled demo with precision

Book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • Site visit and written estimate

    We come out, look at the job and send you a written estimate.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    We come out, look at the job and send you a written estimate. The visit is credited to the job if you go ahead.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Demolition Services in Federal Heights, Colorado

Autotelic provides professional demolition services throughout Federal Heights and the surrounding Adams County area. Selective and full demolition services including hazardous material abatement, structural demo, and complete haul-off. Whether you're in Federal Heights (north central Denver metro) or nearby communities, our team delivers quality workmanship, licensed and insured.

The build sequence for a Demolition project

Every project starts with a feasibility study; this trade is priced from the same assemblies.

  1. Demolition feasibility in Federal Heights
  2. How a Demolition project is estimated

Start a Demolition feasibility study

Permit Thresholds

Federal Heights permit thresholds

Code reference
Federal Heights, CO (Municipal Code Chapter 10, Article II, as amended by Ordinance No. 21-01, adopting the 2018 International Codes with local amendments) requires building permits for most residential remodel/alteration work, with limited exemptions.Ord. No. 21-01
Code reference
The city adopts the 2018 IBC, IRC (for residential), IEBC, and related codes (with amendments in Sec. 10-16 and 10-18).§10-16
Exempt work list (amended Sec. 105.2 of the codes)
Standard IRC/IBC exemptions are significantly restricted.§105.2
Code reference
The exemption for fences less than 7 feet high.
Code reference
The city uses the 2018 codes’ general framework for when work requires permitting.
Code reference
Fees (per city Building Permit Fees page and Municipal Code Sec. 10-17):§10-17
Building permit fee
Based on total project valuation (labor + materials); tiered schedule applies (examples): $1–$500 = $23.50; $501–$2,000 = $23.50 + $3.05 per additional $100 (or fraction) up to $2,000; higher tiers up to $1M+ with decreasing per-$1,000 rates.
Plan review fee
65% of the building permit fee (waived for certain simple projects like water heaters/furnaces/roofing without plan review; collected upfront for valuations > $25,000).

Codes are amended regularly — verify current requirements with **The City of Federal Heights Building Department issues residential building permits.

Energy Code

Federal Heights energy code quick facts

Code reference
2018 IECC (no local amendments noted; kept as the 2018 edition when the city adopted the 2021 ICC codes effective April 15, 2023).
Code reference
Federal Heights explicitly retained the 2018 International Energy Conservation Code for energy requirements rather than updating it alongside other 2021 ICC codes (per city website and related ordinances such as those referenced in the 2023 adoption process, e.g., Ordinance No. 23-02 context).Ord. No. 23-02
Code reference
Federal Heights is in Climate Zone 5B.
Code reference
Key prescriptive requirements (from 2018 IECC, applicable to remodels/additions/alterations where triggered; no local amendments identified):
Ceiling/attic insulation
R-49 (Table R402.1.2).
Wood-frame wall insulation
R-20 cavity or R-13 cavity + R-5 continuous insulation (Table R402.1.2).
Floors over unconditioned space
R-30 (Table R402.1.2).
Air leakage
Building or dwelling unit tested and verified to ≤ 3 ACH50 (or per applicable table/zone provision in R402.4.1.2; exact threshold follows 2018 base code for CZ 3–8).

Codes are amended regularly — verify current requirements with **The City of Federal Heights Building Department issues residential building permits.

text

What demolition work covers

Demolition in the Denver metro ranges from selective interior tear-out to partial exterior removal and full structure demo with haul-off. Dust, noise, and utility disconnects are part of planning. A municipally licensed Denver general contractor coordinates demolition and related specialty trades for disconnects and abatement when required. Cost is project-specific and depends on volume, access, disposal, and hazardous-material handling.

text

Selective vs full demo

Selective demo protects adjacent finishes and structure. Full demo needs clear limits, safety fencing, and often more formal permitting and noticing.

text

What buyers should prepare

Demo limits, salvage preferences, building age, and whether hazardous materials testing has been done.

FAQ

Common questions

How much does Site visit and written estimate cost in Federal Heights?

$149.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Who handles demolition permits and licensing?

A municipally licensed Denver general contractor coordinates the project and related specialty trades. Colorado has no statewide general contractor license.

What about lead paint in older buildings?

Disturbing paint in pre-1978 housing can trigger EPA RRP requirements. Testing and work practices should be planned before demo.

Can materials be salvaged?

Sometimes. Salvage goals should be written into the scope before tear-out starts.

What information helps define scope?

Photos or plans of what stays vs goes, building age, access constraints, and city or county.

Service Area

Serving Federal Heights and Adams County

We serve Federal Heights, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Federal Heights project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free demolition estimate in Federal Heights

Tell us about your Federal Heights project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…