DESIGN · BUILD · AUTOMATE
GREENWOOD VILLAGE SERVICES
Tesla Solar Roof in Greenwood Village
Licensed tesla solar roof services for Greenwood Village and Arapahoe County. Your roof is your power plant.
What Greenwood Village requires
Code reference: (IECC 2018, Table R402.1.2) IECC 2018
See full local requirements ↓- Full Design Lifecycle
- Construction & Tenant Finish
- Smart Home · A/V · Edge Compute

Your roof is your power plant
FREE PLANNING TOOLS
Both tools are free and take a couple of minutes — start in either one.
EVERY PROJECT STARTS WITH DESIGN
Local Service
Tesla Solar Roof Services in Greenwood Village, Colorado
Autotelic provides professional tesla solar roof services throughout Greenwood Village and the surrounding Arapahoe County area. Tesla Solar Roof installation across the Denver metro by a Tesla Certified Installer. We treat the roof as one integrated project: tear-off, decking and structural assessment, full replacement with tempered glass solar tiles, Powerwall battery pairing, and Xcel Energy interconnection under a single contract. One veteran-owned design-build team manages the reroof and energy system together, so you avoid sequencing a separate roofer and solar contractor. Whether you're in Greenwood Village (Denver Tech Center) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.
The build sequence for a Tesla Solar Roof project
Every project starts with a feasibility study; this trade is priced from the same assemblies.
Permit Thresholds
Greenwood Village permit thresholds
- Code reference
- The city operates under the 2018 International Residential Code (IRC) and other 2018 International Codes, along with the 2023 National Electrical Code (NEC) standards.
- Code reference
- Concrete or asphalt work exceeding 100 square feet
- Code reference
- Re-roofs/Repairs involving the removal of 25% or more of the decking
- Code reference
- Landscaping or grading that is more than 10 feet from a property line, not within a drainage easement, involves less than 500 square feet of disturbed area, and less than 10 cubic yards of earthwork
- Code reference
- Re-roofing that only involves laying new shingles and patching unsound decking (less than 25% of decking removal)
- Snow loads
- 30 lbs.
- Ultimate wind speed
- 120 mph (Basic Design) and nominal: 93 mph (allowable stress design)
- Frost depth
- 36 inches
Codes are amended regularly — verify current requirements with **The City of Greenwood Village (specifically its Community Development Department / Building Division) issues residential building permits.
Energy Code
Greenwood Village energy code quick facts
- Code reference
- Greenwood Village, Colorado, has adopted the 2018 International Energy Conservation Code (IECC) as its energy code.
- Code reference
- There is no indication of a specific "Greenwood Green Code" or "Energize Denver" equivalent adopted by Greenwood Village; however, Colorado state law requires local jurisdictions to adopt and enforce the 2021 IECC and the Colorado Model Electric Ready and Solar Ready Code upon updating any other bui
- Code reference
- The adopting ordinance for the 2018 IECC is referenced on the Greenwood Village Official Website under "Adopted Codes & Manuals" and "Fee Schedule," stating that the 2018 International Energy Conservation Code is currently in effect.
- Code reference
- Given that Greenwood Village operates under the 2018 IECC and is in Climate Zone 5B, the following are key prescriptive requirements for residential construction, generally applicable to remodels and additions when the scope of work includes these elements:
- Code reference
- While specific local amendments to the 2018 IECC would need to be thoroughly reviewed within the Greenwood Village Municipal Code, the general prescriptive requirements for Climate Zone 5B from the 2018 IECC (which Greenwood Village has adopted) are as follows:
- Ceiling Insulation (Attic)
- R-49.
- Code reference
- (IECC 2018, Table R402.1.2)IECC 2018
- Wood Frame Wall Insulation
- R-20 continuous insulation (c.i.) or R-13 + R-5 c.i.
Codes are amended regularly — verify current requirements with **The City of Greenwood Village (specifically its Community Development Department / Building Division) issues residential building permits.
text
What this covers
Roofing assembly that includes integrated PV tiles or equivalent Tesla Solar Roof product. Roof structure, underlayment, and electrical interconnection are all in the coordination path.
text
Technical scope
Roofing assembly that includes integrated PV tiles or equivalent Tesla Solar Roof product. Roof structure, underlayment, and electrical interconnection are all in the coordination path. No installer-certification or production- claim is made.
text
How the work is coordinated
No installer-certification or production- claim is made. Denver-metro work is permitted locally. Colorado has no statewide general-contractor license. Cities and counties license general contractors. DORA licenses electrical and plumbing (and similar regulated trades), not general contractors. Autotelic is a municipally licensed Denver general contractor that coordinates licensed specialty trades. Denver building permits run through Community Planning and Development (CPD). Costs are project-specific; no dollar figures.
Service Area
Serving Greenwood Village and Arapahoe County
We serve Greenwood Village, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Greenwood Village project.
FAQ
Common questions
Is Solar Roof a separate project from a reroof?
No. If your roof is due, Solar Roof is the reroof — tear-off, decking repair, and tile installation happen as one project instead of hiring a roofer and then a solar contractor.
What changed with the federal solar credit in 2026?
The federal residential clean energy credit expired for systems placed in service after December 31, 2025. Homeowners paying cash or financing with a loan in 2026 receive no federal credit; leased/PPA systems still capture roughly 30% via the section 48E credit (through 2032), passed through by the lessor.
What warranty covers Solar Roof?
Tesla backs the solar tiles and power production with a 25-year tile and power warranty. Our installation workmanship is covered under the project contract and closeout documentation.
How does Solar Roof handle Colorado hail and snow?
The tiles are tempered glass and rated for the impact and wind loads required by code. We install to Tesla specifications and local building department requirements, and we inspect decking and structural readiness before the tiles go on.
What does the design-build process look like?
We start with a site assessment and roof condition check, then produce a fixed-price scope covering tear-off, decking, tile install, Powerwall, and Xcel Energy interconnection and net metering. Permitting and utility approval run on their own calendars; we keep schedule visibility in our operations platform from start to closeout.
Does Colorado offer a tax credit for Solar Roof?
Colorado's 10% state tax credit applies to qualifying energy-storage equipment — such as a paired Powerwall — not to the solar tiles themselves. We identify the eligible components in the proposal so you can confirm the credit with your tax advisor.
How It Runs
01
Survey
02
Design
03
Build
04
Verify
DESIGN SERVICES
Discovery & Site Analysis
Needs + preference programming, site survey, as-built documentation, feasibility.
We walk, measure, and photograph your property — existing conditions, utilities, structure, and constraints. You get the as-built documentation and feasibility read that every later decision rests on.
Learn more →Concept Design & Space Planning
Schematic design, floor plan studies, layout options.
Your scope becomes schematic floor plans you can compare side by side — circulation, daylight, adjacencies, and what each option does to the budget. Layout decisions happen on paper, where changes are cheap.
Learn more →Architectural Design & 3D Renderings
Design development, materials + finishes, photorealistic visualization.
The chosen concept resolves into materials, finishes, fixtures, and lighting — with the automation layer drawn in. Photorealistic renderings let you walk the space and adjust before anything is priced.
Learn more →Construction Documents & Permitting
Full CD sets, structural + MEP engineering coordination, permit-ready drawings.
Approved designs become coordinated architectural, structural, and MEP sheets — the set your jurisdiction permits from and trades build from. We submit, track, and answer review comments.
Learn more →CONSTRUCTION
New Construction & Custom Homes
Ground-up homes and light commercial, dirt to keys.
Ground-up residential and light commercial builds — foundations through finishes, including modular and steel construction. One accountable builder from dirt to keys.
Learn more →Remodels & Additions
Kitchens, baths, basements, pop-tops, whole-home.
Kitchens, baths, basements, pop-tops, and whole-home renovations that respect the house you already have. We handle structure, permits, and the dust.
Learn more →Commercial Tenant Finish & Build-Outs
Shells to working spaces — retail, office, restaurant, school.
Raw shells become working spaces — showrooms, offices, restaurants, schools. Dealer-spec finishes, code compliance, and opening dates held.
Learn more →ADUs & Modular Construction
Backyard cottages, garage conversions, factory-built homes.
Backyard cottages, garage conversions, and factory-built homes — zoning, design, permits, and set. Denver’s ADU rules are a specialty, not a surprise.
Learn more →Outdoor Living & Patio Structures
Decks, pergolas, and dining patios built for Colorado weather.
Decks, pergolas, and dining patios engineered for Colorado sun, snow, and hail — structure, shade, and drainage done right the first time.
Learn more →TECHNOLOGY
Smart Home Automation
Lighting, shades, climate, audio, security — one interface.
Whole-home control of lighting, shades, climate, audio, and security from a single interface — Crestron, Lutron, Savant, and Control4 designed in, not bolted on.
Learn more →A/V Systems
Theaters, distributed audio, video walls, commercial sound.
Theaters, distributed audio, video walls, and commercial sound — designed, installed, and tuned by the same team for over 20 years.
Learn more →Control Systems
Custom programming — scenes and schedules that fit the space.
Every subsystem brought into one elegant interface — custom programming for homes and venues, with scenes and schedules that match how the space is actually used.
Learn more →Networking & Edge Compute
Enterprise Wi-Fi, structured cabling, racks, on-prem compute.
Enterprise-grade Wi-Fi, structured cabling, racks, and on-premise compute — the backbone that makes everything else reliable, including our own Barbot platform.
Learn more →Solar & Energy Storage
Solar arrays, Tesla Powerwall, EV charging — certified install.
Solar arrays, Tesla Powerwall, and EV charging designed and installed by a Tesla Energy Certified team — roof, electrical, and app in one scope.
Learn more →Explore