What Boulder requires

Exempt work (no permit required, though work must still comply with all applicab: The complete list is referenced in Boulder Revised Code (B.R.C.) 1981, Title 10, Chapter 5, Section 10-5-2 (Adoption of International Building Code with Modifications, including exemptions in section J). §10-5-2

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Tesla Solar Roof

Your roof is your power plant

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Tesla Solar Roof Services in Boulder, Colorado

Autotelic provides professional tesla solar roof services throughout Boulder and the surrounding Boulder County area. Tesla Solar Roof installation across the Denver metro by a Tesla Certified Installer. We treat the roof as one integrated project: tear-off, decking and structural assessment, full replacement with tempered glass solar tiles, Powerwall battery pairing, and Xcel Energy interconnection under a single contract. One veteran-owned design-build team manages the reroof and energy system together, so you avoid sequencing a separate roofer and solar contractor. Whether you're in Boulder (home to CU Boulder) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

The build sequence for a Tesla Solar Roof project

Every project starts with a feasibility study; this trade is priced from the same assemblies.

  1. Tesla Solar Roof feasibility in Boulder
  2. How a Tesla Solar Roof project is estimated

Start a Tesla Solar Roof feasibility study

Permit Thresholds

Boulder permit thresholds

Exempt work (no permit required, though work must still comply with all applicab
The complete list is referenced in Boulder Revised Code (B.R.C.) 1981, Title 10, Chapter 5, Section 10-5-2 (Adoption of International Building Code with Modifications, including exemptions in section J).§10-5-2
Code reference
Minor drywall repairs (<1 sheet or 32 sq ft).
Code reference
One-story accessory sheds (≤120 sq ft, ≤10 ft high, no utilities/electrical/mechanical/plumbing).
Code reference
Fences ≤7 ft high.
Code reference
Flatwork (private sidewalks, patios, driveways) ≤30 inches above grade, not over a basement/story below, and not part of an accessible route.
Code reference
Playground equipment accessory to 1- or 2-family dwellings.
Code reference
Prefabricated above-ground swimming pools accessory to 1- or 2-family dwellings (<24 inches deep, ≤5,000 gallons).
Code reference
Retaining walls ≤3 ft high (measured from footing bottom to wall top), unless supporting a surcharge or impounding certain flammables.

Codes are amended regularly — verify current requirements with **City of Boulder Planning and Development Services (P&DS; specifically its Building Permits and Inspections section) issues residential building permits for properties within Boulder city limits.

Energy Code

Boulder energy code quick facts

Code reference
2024 City of Boulder Energy Conservation Code (CoBECC), effective December 1, 2024 (based on the 2024 ICC suite of codes with local amendments; all-electric requirements for new construction, additions, and major alterations).
Code reference
This applies to the City of Boulder (not unincorporated Boulder County, which follows the 2021 IECC with amendments effective July 1, 2026).
Code reference
The code emphasizes performance paths (e.g., ERI/HERS targets) for most projects but retains prescriptive options for smaller additions/remodels (≤1,000 sf for residential).
Code reference
Boulder is in Climate Zone 5B.
Code reference
Prescriptive requirements align closely with or reference 2024 IECC Table R402.1.2 (and related sections R401–R404, R407–R408) unless locally amended; projects often use performance paths due to stringency.
Code reference
Key prescriptive requirements relevant to remodels/additions (from CoBECC/2024 IECC Table R402.1.2 and related sections for CZ 5B; cite the adopting code section or CoBECC equivalent):
Ceiling/attic insulation
R-49 minimum (R402.1.2 / CoBECC Chapter 4 RE).
Wood-frame above-grade walls
R-20 + R-5 continuous insulation (ci), or R-13 + R-10 ci, or R-20 ci (R402.1.2 / CoBECC Chapter 4 RE).

Codes are amended regularly — verify current requirements with **City of Boulder Planning and Development Services (P&DS; specifically its Building Permits and Inspections section) issues residential building permits for properties within Boulder city limits.

Zoning & Dimensional Standards

Setback & dimensional standards in Boulder

Zone-district dimensional standards for Boulder, quoted verbatim from the Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024). Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

Asetback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)15'
Side Setback Abutting Street (min)25'
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) A setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BCsetback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) BC setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BCSsetback & dimensional standards
StandardRequirement
Front Setback (min)10'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)10'
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) BCS setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BMSsetback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0' for first and second stories 12' for third story and above
Rear Setback (min)0'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) BMS setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BRsetback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) BR setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BT-1setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) BT-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BT-2setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)10'
Side Setback Abutting Street (min)15'
Rear Setback (min)25'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) BT-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-1setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0' (k)
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) DT-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-2setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0' (k)
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) DT-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-3setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0' (k)
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) DT-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-4setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0'
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) DT-4 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-5setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0' (k)
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) DT-5 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IGsetback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) IG setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IMsetback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) IM setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IMSsetback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0'
Rear Setback (min)10'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) IMS setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IS-1setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) IS-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IS-2setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) IS-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MHsetback & dimensional standards
StandardRequirement
Front Setback (min)See section 9-7-13
Side Interior Setback (min)See section 9-7-13
Rear Setback (min)See section 9-7-13
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) MH setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MU-1setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0' or 5' (b)
Rear Setback (min)10'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) MU-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MU-2setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0'
Rear Setback (min)10'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) MU-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MU-3setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0' for first and second stories 12' for third story and above
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) MU-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MU-4setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0' for first and second stories 12' for third story and above
Rear Setback (min)0'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) MU-4 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

Psetback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) P setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

REsetback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)25'
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RE setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-1setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' or 3'
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RH-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-2setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RH-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-3setback & dimensional standards
StandardRequirement
Front Setback (min)10'
Side Interior Setback (min)1' per 3' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)40'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RH-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-4setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)1' per 2' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RH-4 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-5setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RH-5 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-6setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' or 3'
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RH-6 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-7setback & dimensional standards
StandardRequirement
Front Setback (min)10'
Side Interior Setback (min)1' per 3' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)40'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RH-7 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RL-1setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)5'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RL-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RL-2setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)1' per 2' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)10'
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RL-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RM-1setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)1' per 2' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)10'
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RM-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RM-2setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)5'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RM-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RM-3setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' or 3'
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RM-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RMX-1setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)5'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RMX-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RMX-2setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' (attached DUs); 1' per 2' of bldg. height, 5' min. (detached DUs) (i)
Side Setback Abutting Street (min)0' (attached DUs); 1' per 2' of bldg. height, 5' min. (detached DUs) (i)
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RMX-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RR-1setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)15'
Side Setback Abutting Street (min)25'
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RR-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RR-2setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)25'
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RR-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What this covers

Roofing assembly that includes integrated PV tiles or equivalent Tesla Solar Roof product. Roof structure, underlayment, and electrical interconnection are all in the coordination path.

text

Technical scope

Roofing assembly that includes integrated PV tiles or equivalent Tesla Solar Roof product. Roof structure, underlayment, and electrical interconnection are all in the coordination path. No installer-certification or production- claim is made.

text

How the work is coordinated

No installer-certification or production- claim is made. Denver-metro work is permitted locally. Colorado has no statewide general-contractor license. Cities and counties license general contractors. DORA licenses electrical and plumbing (and similar regulated trades), not general contractors. Autotelic is a municipally licensed Denver general contractor that coordinates licensed specialty trades. Denver building permits run through Community Planning and Development (CPD). Costs are project-specific; no dollar figures.

Service Area

Serving Boulder and Boulder County

We serve Boulder, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Boulder project.

FAQ

Common questions

Is Solar Roof a separate project from a reroof?

No. If your roof is due, Solar Roof is the reroof — tear-off, decking repair, and tile installation happen as one project instead of hiring a roofer and then a solar contractor.

What changed with the federal solar credit in 2026?

The federal residential clean energy credit expired for systems placed in service after December 31, 2025. Homeowners paying cash or financing with a loan in 2026 receive no federal credit; leased/PPA systems still capture roughly 30% via the section 48E credit (through 2032), passed through by the lessor.

What warranty covers Solar Roof?

Tesla backs the solar tiles and power production with a 25-year tile and power warranty. Our installation workmanship is covered under the project contract and closeout documentation.

How does Solar Roof handle Colorado hail and snow?

The tiles are tempered glass and rated for the impact and wind loads required by code. We install to Tesla specifications and local building department requirements, and we inspect decking and structural readiness before the tiles go on.

What does the design-build process look like?

We start with a site assessment and roof condition check, then produce a fixed-price scope covering tear-off, decking, tile install, Powerwall, and Xcel Energy interconnection and net metering. Permitting and utility approval run on their own calendars; we keep schedule visibility in our operations platform from start to closeout.

Does Colorado offer a tax credit for Solar Roof?

Colorado's 10% state tax credit applies to qualifying energy-storage equipment — such as a paired Powerwall — not to the solar tiles themselves. We identify the eligible components in the proposal so you can confirm the credit with your tax advisor.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free tesla solar roof estimate in Boulder

Tell us about your Boulder project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…