autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

CHERRY HILLS VILLAGE SERVICES

Smart Home Automation in Cherry Hills Village

Licensed smart home automation services for Cherry Hills Village and Arapahoe County. Whole-home intelligence.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Smart Home Automation

Whole-home intelligence

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Smart Home Automation Services in Cherry Hills Village, Colorado

Autotelic provides professional smart home automation services throughout Cherry Hills Village and the surrounding Arapahoe County area. Complete smart home systems with Crestron, Lutron, Savant, and Control4 — lighting, shades, climate, security, and AV under one interface. Whether you're in Cherry Hills Village (affluent south Denver) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Cherry Hills Village permit thresholds

Code reference
The Village adopted the 2024 International Codes (I-Codes) at the beginning of 2026, including the 2024 International Residential Code (IRC), and adheres to Chapter 18 of the Cherry Hills Village Municipal Code for building regulations.
Code reference
If an addition is more than 50% of the existing square footage, or if the aggregate floor area is demolished or reconstructed by more than 50%, or increased by 50% or more, the project is considered "redevelopment" and may have additional submittal and drainage requirements per Chapter 9 of the zoni
Code reference
Any electrical work on 400 amps (320 continuous) or greater requires a separate plan review.
Impervious Surface
If more than 2,500 square feet of impervious surface is added cumulatively (e.g., house addition, driveway, patio), a Phase III Drainage Plan is required.
Code Reference
Cherry Hills Village Municipal Code, Chapter 18, and the adopted 2024 International Residential Code.
Code reference
### Exempt Work (Cherry Hills Village Municipal Code Section 105.2, referencing adopted I-Codes)Section 105.2
Code reference
One-story detached, prefabricated storage sheds that do not exceed 120 square feet.
Code Reference
Cherry Hills Village Municipal Code, Section 105.2, referencing adopted I-Codes.Section 105.2

Codes are amended regularly — verify current requirements with **The City of Cherry Hills Village (specifically its Building Division under Community Development) issues residential building permits.

text

What smart-home work covers

Smart-home projects in the Denver metro typically include lighting control (line-voltage dimmers, 0-10 V, occupancy or vacancy sensors, scene keypads), thermostats, motorized shades, contact sensors, and a local hub or controller using protocols such as Matter or Thread. Low-voltage sensors are different from line-voltage lighting circuits. A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Cost is project-specific and depends on room count, existing wiring, and whether new circuits are needed.

text

Lighting circuits and energy code

Replacing lighting or adding controls on 120 V circuits is electrical work. City and County of Denver Community Planning and Development reviews commercial and multifamily interior lighting replacements for energy-code controls. Residential alterations that add new lighting systems follow Denver Energy Code lighting provisions (DEC R404.1 when those systems are in the alteration). Minor electrical work may qualify for a quick permit.

text

Permits and who coordinates the work

CPD electrical permits typically apply when devices are swapped on lighting circuits, new circuits are added, or line-voltage load controllers are installed. Colorado DORA regulates electrical licensing. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades for smart-home scopes.

text

What buyers should prepare

Rooms in scope, photos of existing switches, whether a dedicated controller is desired, and any shade or thermostat goals.

FAQ

Common questions

Do smart switches need a Denver permit?

Often yes when they replace devices on lighting circuits. Plug-in hubs alone usually do not. Confirm with CPD if the work is mixed.

Who handles smart-home permits and licensing?

A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Colorado has no statewide general contractor license.

Wi-Fi bulbs or a wired control system?

Wi-Fi bulbs avoid new wiring but depend on the network. Wired dimmers, 0-10 V, and a local hub are more durable for whole-house lighting.

Do occupancy sensors count as energy-code controls?

They are a common control type. Commercial lighting replacements are reviewed against energy-code control requirements.

What information helps define scope?

Room list, switch photos, shade motors yes or no, and city or county.

Service Area

Serving Cherry Hills Village and Arapahoe County

We serve Cherry Hills Village, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Cherry Hills Village project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free smart home automation estimate in Cherry Hills Village

Tell us about your Cherry Hills Village project — we respond fast, and estimates are always free.

Name, phone, and email required.