(720) 287-7958

DESIGN · BUILD · AUTOMATE

LOUISVILLE SERVICES

MEP Engineering in Louisville

Site visit and written estimate, $149

Licensed MEP engineering services for Louisville and Boulder County. Mechanical, electrical, and plumbing design.

What Louisville requires

Code/municipal code sections: Louisville Municipal Code Chapter 15 (Buildings and Construction), which incorporates the 2024 ICC codes (IBC, IRC, IECC, IEBC, etc., effective December 6, 2025) with local amendments via Ordinance 2025-1907 (No. 1907-2025). Ord. 2025-1907

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
MEP Engineering

Mechanical, electrical, and plumbing design

Book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • Site visit and written estimate

    We come out, look at the job and send you a written estimate.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    We come out, look at the job and send you a written estimate. The visit is credited to the job if you go ahead.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

MEP Engineering Services in Louisville, Colorado

Autotelic provides professional MEP engineering services throughout Louisville and the surrounding Boulder County area. Professional MEP engineering services including HVAC design, electrical load calculations, plumbing layouts, and energy code compliance. Whether you're in Louisville (between Denver and Boulder) or nearby communities, our team delivers quality workmanship, licensed and insured.

Permit Thresholds

Louisville permit thresholds

Code/municipal code sections
Louisville Municipal Code Chapter 15 (Buildings and Construction), which incorporates the 2024 ICC codes (IBC, IRC, IECC, IEBC, etc., effective December 6, 2025) with local amendments via Ordinance 2025-1907 (No. 1907-2025).Ord. 2025-1907
Building permit fee follows a progressive table (e.g., $0–$500
$28; higher brackets up to $1M+ with per-$1,000 increments; exact amounts per the published schedule).
Plan review (in-house)
65% of the building fee.
Boulder County Use Tax
1.185% of 50% of Total Valuation.
City of Louisville Use Tax
3.775% of 50% of Total Valuation.
Code reference
Impact fees may apply for additions or remodels increasing finished floor area over 500 sq ft (per category tables; first 500 sq ft often exempt).

Codes are amended regularly — verify current requirements with **The City of Louisville, Colorado’s Building Safety Division (part of the city government) issues residential building permits.

text

What MEP coordination covers

MEP engineering coordination on Denver-metro projects means bringing design professionals into mechanical, electrical, and plumbing scopes: HVAC loads and duct layouts, electrical one-lines and panel schedules, plumbing risers, and energy-code documentation. The general contractor coordinates schedule, permitting, and construction around sealed drawings. A municipally licensed Denver general contractor does not replace the engineer of record; it coordinates design professionals and the build team. Cost is project-specific and depends on building type and system complexity.

text

What buyers should prepare

Project type (tenant finish, addition, equipment swap), any existing drawings, and known panel, HVAC, or plumbing capacity limits.

FAQ

Common questions

How much does Site visit and written estimate cost in Louisville?

$149.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Who handles MEP permits and licensing?

A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.

Is the GC the MEP engineer of record?

No. Sealed mechanical, electrical, and plumbing design is provided by design professionals who seal the documents. The GC coordinates construction around those documents.

When is an SUDP involved?

Denver DOTI reviews Sewer Use and Drainage with most building-permit packages, including many remodels, because fixture or drainage changes can affect sewer use.

What information helps define scope?

Desired system changes, existing drawings if any, photos of equipment and panels, and city or county.

Service Area

Serving Louisville and Boulder County

We serve Louisville, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Louisville project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free MEP engineering estimate in Louisville

Tell us about your Louisville project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…