autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

CENTENNIAL SERVICES

MEP Engineering in Centennial

Licensed MEP engineering services for Centennial and Arapahoe County. Mechanical, electrical, and plumbing design.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
MEP Engineering

Mechanical, electrical, and plumbing design

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

MEP Engineering Services in Centennial, Colorado

Autotelic provides professional MEP engineering services throughout Centennial and the surrounding Arapahoe County area. Professional MEP engineering services including HVAC design, electrical load calculations, plumbing layouts, and energy code compliance. Whether you're in Centennial (south Denver metro) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permits & Licensing

Permits in Centennial

Centennial building permits, inspections, and contractor license approvals are handled by the city's Building Division. Permits and contractor licenses must be applied for online through the city's Self-Service Portal, and we handle that process as part of every project. Authority: City of Centennial — Building Division.

Permit Thresholds

Centennial permit thresholds

Code reference
In Centennial, Colorado, building permits for residential remodel work are governed by the 2021 International Residential Code (IRC) Section R105 (adopted via Centennial Municipal Code Chapter 18 – Building Regulations, per Ordinance 2023-O-06 and related adoptions of the 2021 I-Codes).Section R105
Code reference
Typically exempt work (aligning with IRC R105.2 exemptions, with local application) includes:
Code reference
One-story detached accessory structures (e.g., sheds) ≤200 sq ft.
Code reference
Fences ≤7 ft high; retaining walls ≤4 ft high (measured from bottom of footing).
Code reference
Prefabricated swimming pools <24 inches deep.
Code reference
Window awnings projecting ≤54 inches.
Code reference
Decks ≤200 sq ft, ≤30 inches above grade, and not attached to the dwelling.
Use tax (not collapsed into a single rate)
City of Centennial Use Tax of 2.5% applied to the actual cost of materials, plus Arapahoe County Use Tax of 0.25% applied to the actual cost of materials.

Codes are amended regularly — verify current requirements with City of Centennial — Building Division.

text

What MEP coordination covers

MEP engineering coordination on Denver-metro projects means bringing design professionals into mechanical, electrical, and plumbing scopes: HVAC loads and duct layouts, electrical one-lines and panel schedules, plumbing risers, and energy-code documentation. The general contractor coordinates schedule, permitting, and construction around sealed drawings. A municipally licensed Denver general contractor does not replace the engineer of record; it coordinates design professionals and the build team. Cost is project-specific and depends on building type and system complexity.

text

When CPD wants engineered packages

City and County of Denver Community Planning and Development asks for engineered drawings, calculations, specifications, and energy-code information when commercial or multifamily work includes electrical, mechanical, or plumbing changes. Additions typically need building plus electrical, mechanical, plumbing, and Sewer Use and Drainage (SUDP) review through DOTI. Equipment replacements can trigger mechanical review for capacity, makeup air, and exhaust.

text

Permits and who coordinates the work

MEP packages are submitted through Denver CPD e-permits with the building permit. Colorado DORA regulates electrical and plumbing licensing. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades plus the design professionals required for the project.

text

What buyers should prepare

Project type (tenant finish, addition, equipment swap), any existing drawings, and known panel, HVAC, or plumbing capacity limits.

FAQ

Common questions

Do MEP changes need engineered drawings in Denver?

Often yes for commercial and multifamily work. CPD commercial plan review lists electrical, mechanical, and plumbing as drawing-review items when those systems change.

Who handles MEP permits and licensing?

A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.

Is the GC the MEP engineer of record?

No. Sealed mechanical, electrical, and plumbing design is provided by design professionals who seal the documents. The GC coordinates construction around those documents.

When is an SUDP involved?

Denver DOTI reviews Sewer Use and Drainage with most building-permit packages, including many remodels, because fixture or drainage changes can affect sewer use.

What information helps define scope?

Desired system changes, existing drawings if any, photos of equipment and panels, and city or county.

Service Area

Serving Centennial and Arapahoe County

We serve Centennial, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Centennial project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free MEP engineering estimate in Centennial

Tell us about your Centennial project — we respond fast, and estimates are always free.

Name, phone, and email required.