(720) 287-7958

DESIGN · BUILD · AUTOMATE

LAFAYETTE SERVICES

EV Charger Install — Level 2 in Lafayette

EV Charging Outlet NEMA 14-50 — Garage, Panel-Adjacent, $595

See all 3 jobs

Licensed EV charger install — level 2 services for Lafayette and Boulder County. Charge at home. Every night..

What Lafayette requires

Code reference: Exempt work (from building permit requirements, per the City’s website and 2023 Lafayette Colorado Building Code amendments to IRC Section R105.2 / equivalent) includes (non-exhaustive list relevant to remodels): §R105.2

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
EV Charger Install — Level 2

Charge at home. Every night.

Jobs you can book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • EV Charger Install (Level 2, Standard)

    Permitted install of a customer-supplied Level 2 charger on a new 50A circuit within 25 feet of a panel with available capacity.

    $250 deposit to book, the rest when the work is done · morning (8–12) or afternoon (12–4)

    What's included

    Permitted install of a customer-supplied Level 2 charger on a new 50A circuit within 25 feet of a panel with available capacity. Longer runs or panel upgrades are quoted after a load calculation.

  • EV Charger Installation — Level 2 (Site-Priced)

    $189 visit fee — credited toward the work

    On-site electrical evaluation — panel capacity, breaker space, and run distance — with a firm permitted-installation quote for a Level 2 charger; the trip fee is credited toward the installation.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    On-site electrical evaluation — panel capacity, breaker space, and run distance — with a firm permitted-installation quote for a Level 2 charger; the trip fee is credited toward the installation. The charger unit, permit fees, and any panel upgrade are itemized in the quote, not covered by the fee.

  • EV Charging Outlet NEMA 14-50 — Garage, Panel-Adjacent

    Install one NEMA 14-50 receptacle in the garage within 10 ft of the existing panel, surface-run in conduit, on a new 50A GFCI-protected 2-pole breaker (breaker, conduit, wire, industrial-grade receptacle included),…

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Install one NEMA 14-50 receptacle in the garage within 10 ft of the existing panel, surface-run in conduit, on a new 50A GFCI-protected 2-pole breaker (breaker, conduit, wire, industrial-grade receptacle included), with torque-spec terminations and load test. HARD ASSUMPTIONS — verified before work starts: panel is in or adjacent to the garage, has two open adjacent breaker spaces, and a load calculation confirms spare capacity for a 40A continuous load. If the panel lacks space or capacity, or the run exceeds 10 ft, this task does not apply and the job is visit-quoted as panel/new-circuit work (excluded from this price book). Hardwired wall chargers and load-management devices also excluded.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

EV Charger Install — Level 2 Services in Lafayette, Colorado

Autotelic provides professional EV charger install — level 2 services throughout Lafayette and the surrounding Boulder County area. Level 2 EV charger installation across the Denver metro by a Tesla Certified Installer — Tesla Wall Connector and universal J1772/NACS units. We run a panel-capacity check and load calculation before quoting, then install a dedicated 240V circuit for garage or weather-rated exterior mounting. The municipal permit, inspection, and load-management setup for multi-EV homes are handled under one electrical scope. Whether you're in Lafayette (east Boulder County) or nearby communities, our team delivers quality workmanship, licensed and insured.

Permit Thresholds

Lafayette permit thresholds

Code reference
This follows the City’s adopted codes (primarily the 2021 International Residential Code with local amendments in the 2023 Lafayette Colorado Building Code, effective August 1, 2023).
Code reference
Exempt work (from building permit requirements, per the City’s website and 2023 Lafayette Colorado Building Code amendments to IRC Section R105.2 / equivalent) includes (non-exhaustive list relevant to remodels):§R105.2
Code reference
One-story detached accessory storage sheds under 120 sq ft.
Code reference
Retaining walls under 3 ft high (measured from bottom of footing to top of wall, unless supporting a surcharge).
Code reference
Sidewalks, driveways, and patios less than 30 inches above adjacent grade and not part of an accessible route.
Code reference
Window awnings projecting no more than 54 inches from a residence (no additional support required).
Construction use tax
Any person obtaining a building permit must pay a use tax deposit of 3.87% on 60% of the value of the permit (per Sec. 110-37 of the Municipal Code).§110-37

Codes are amended regularly — verify current requirements with **City of Lafayette, Colorado Building Division (part of the Planning & Building Department) issues residential building permits within city limits.

Energy Code

Lafayette energy code quick facts

Code reference
2021 IECC (residential and commercial provisions) with local amendments, as adopted in the 2023 Lafayette, Colorado Building Code (effective August 1, 2023).
Code reference
This is confirmed on the City’s official Building Code & Design Information page and in the adopted code document (which includes Article 9 amendments to the 2021 IECC).
Code reference
The base prescriptive requirements follow the 2021 IECC (Climate Zone 5B for the Lafayette area).
Code reference
The City is in the process of considering 2024 I-Codes (including a Metro Cohort Model Code based on the 2024 IECC) but has not yet adopted them.
Code reference
Key prescriptive requirements relevant to remodels/additions (drawn from the 2021 IECC as adopted/amended locally; specific numeric values and sections are from the base 2021 IECC unless locally modified in Article 9 of the 2023 Lafayette code—local amendments focus more on electrification/solar
Wall insulation (wood-frame above-grade)
R-20 + R-5 ci or R-13 + R-10 ci (2021 IECC Table R402.1.2 / prescriptive path; applies to additions and alterations per R503).
Ceiling/attic insulation
R-49 (or higher per table footnotes; 2021 IECC Table R402.1.2; relevant for additions and certain alterations).
Fenestration (windows/doors)
Maximum U-factor typically 0.30 (or as specified in Table R402.1.2 for CZ 5; SHGC requirements also apply; relevant for replacement windows in remodels).

Codes are amended regularly — verify current requirements with **City of Lafayette, Colorado Building Division (part of the Planning & Building Department) issues residential building permits within city limits.

text

What this covers

Level 2 AC charger at a residence or small commercial stall, on a dedicated circuit. Panel capacity, run length, and indoor/outdoor rating are checked before gear is ordered.

text

Technical scope

Level 2 AC charger at a residence or small commercial stall, on a dedicated circuit. Panel capacity, run length, and indoor/outdoor rating are checked before gear is ordered. A municipally licensed Denver general contractor coordinates specialty trades for the circuit and charger.

Service Area

Serving Lafayette and Boulder County

We serve Lafayette, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Lafayette project.

FAQ

Common questions

How much does EV Charging Outlet NEMA 14-50 — Garage, Panel-Adjacent cost in Lafayette?

$595.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Do I need a panel upgrade for a Level 2 charger?

Often no. We run a load calculation on your existing panel before quoting. If your service has headroom, a dedicated 240V circuit fits without an upgrade. If the load is tight, load management can delay or avoid a 200A upgrade; we only recommend an upgrade when the math actually requires it.

Should I choose the Tesla Wall Connector or a universal charger?

The Tesla Wall Connector is the cleanest fit for Tesla vehicles and is installed by our Tesla Certified Installer. Universal J1772 or NACS units suit households with mixed EV brands or drivers who want one charger for future vehicles. We match the hardware to what you drive now and expect to drive next.

Can you install a charger outside?

Yes. We mount chargers on garage interiors or weather-rated exterior locations, with conduit, enclosures, and hardware rated for Colorado sun, snow, and freeze-thaw. The install is permitted and inspected like any permanent electrical addition.

Do EV charger installs require a permit?

Yes — a Level 2 charger adds a dedicated 240V circuit, which requires a municipal electrical permit and inspection. We pull the permit and schedule the inspection as part of the project.

What if my household has more than one EV?

We plan for total charging load from the start. Load management shares the available capacity between vehicles, charges when demand is low, and keeps most homes off a costly panel upgrade. We size the circuit and settings for your current and expected fleet.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free EV charger install — level 2 estimate in Lafayette

Tell us about your Lafayette project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…