autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

ERIE SERVICES

EV Charger Install — Level 2 in Erie

Licensed EV charger install — level 2 services for Erie and Boulder/Weld County. Charge at home. Every night..

What Erie requires

Code reference: This adoption was approved by the Erie Town Council via Ordinance No. 12-2026. Ord. No. 12-2026

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
EV Charger Install — Level 2

Charge at home. Every night.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

EV Charger Install — Level 2 Services in Erie, Colorado

Autotelic provides professional EV charger install — level 2 services throughout Erie and the surrounding Boulder/Weld County area. Level 2 EV charger installation across the Denver metro by a Tesla Certified Installer — Tesla Wall Connector and universal J1772/NACS units. We run a panel-capacity check and load calculation before quoting, then install a dedicated 240V circuit for garage or weather-rated exterior mounting. The municipal permit, inspection, and load-management setup for multi-EV homes are handled under one electrical scope. Whether you're in Erie (fast-growing between Denver and Boulder) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Erie permit thresholds

Code reference
The Town of Erie has adopted the 2021 International Residential Code (IRC).
Code reference
Roofing (more than 1 square aggregate)
Code reference
Retaining walls over 4 feet from the bottom of the trench to the top of the wall
Code reference
Detached accessory structures 200 sq. ft. or less (not including patio covers, and provided there is no electrical and/or plumbing work)
Code reference
Minor fence repair (3 sections or less)
Code reference
Minor roof repairs (1 square or less)
Code reference
Decks, platforms, walks, and driveways not more than 30 inches above grade and not over any basement or story below
Code reference
Examples of square foot construction costs for valuation (as of January 1, 2026):

Codes are amended regularly — verify current requirements with **Town of Erie Building Division (Town of Erie, Colorado).

Energy Code

Erie energy code quick facts

Code reference
The Town of Erie, Colorado, has adopted the 2024 International Energy Conservation Code (IECC) with local amendments, effective April 24, 2026.
Code reference
This adoption was approved by the Erie Town Council via Ordinance No. 12-2026.Ord. No. 12-2026
Code reference
Erie is located in Climate Zone 5B.
Code reference
While Erie has adopted the 2024 IECC with local amendments, the specific details of these amendments relevant to prescriptive requirements for remodels and additions were not detailed in the publicly available information.
Code reference
Therefore, the following prescriptive requirements are based on the base 2024 IECC for Climate Zone 5B, which Erie adopted, and are subject to any specific local modifications enacted through Ordinance No. 12-2026.Ord. No. 12-2026
Wall Insulation (Residential)
The building thermal envelope for walls shall meet requirements specified in Table R402.1.2.
Code reference
A common prescriptive option for framed walls in Climate Zone 5B is R-20 continuous insulation, or R-13 cavity insulation plus R-5 continuous insulation (denoted as "13&5").
Code reference
The 2024 IECC also offers additional flexibility for wall insulation in Climate Zones 4 and 5 if additional credits are achieved.
Ord. No. 12-2026

Codes are amended regularly — verify current requirements with **Town of Erie Building Division (Town of Erie, Colorado).

text

What this covers

Level 2 AC charger at a residence or small commercial stall, on a dedicated circuit. Panel capacity, run length, and indoor/outdoor rating are checked before gear is ordered.

text

Technical scope

Level 2 AC charger at a residence or small commercial stall, on a dedicated circuit. Panel capacity, run length, and indoor/outdoor rating are checked before gear is ordered. A municipally licensed Denver general contractor coordinates specialty trades for the circuit and charger.

text

How the work is coordinated

A municipally licensed Denver general contractor coordinates specialty trades for the circuit and charger. Denver-metro work is permitted locally. Colorado has no statewide general-contractor license. Cities and counties license general contractors. DORA licenses electrical and plumbing (and similar regulated trades), not general contractors. Autotelic is a municipally licensed Denver general contractor that coordinates licensed specialty trades. Denver building permits run through Community Planning and Development (CPD). Costs are project-specific; no dollar figures.

Service Area

Serving Erie and Boulder/Weld County

We serve Erie, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Erie project.

FAQ

Common questions

Do I need a panel upgrade for a Level 2 charger?

Often no. We run a load calculation on your existing panel before quoting. If your service has headroom, a dedicated 240V circuit fits without an upgrade. If the load is tight, load management can delay or avoid a 200A upgrade; we only recommend an upgrade when the math actually requires it.

Should I choose the Tesla Wall Connector or a universal charger?

The Tesla Wall Connector is the cleanest fit for Tesla vehicles and is installed by our Tesla Certified Installer. Universal J1772 or NACS units suit households with mixed EV brands or drivers who want one charger for future vehicles. We match the hardware to what you drive now and expect to drive next.

Can you install a charger outside?

Yes. We mount chargers on garage interiors or weather-rated exterior locations, with conduit, enclosures, and hardware rated for Colorado sun, snow, and freeze-thaw. The install is permitted and inspected like any permanent electrical addition.

Do EV charger installs require a permit?

Yes — a Level 2 charger adds a dedicated 240V circuit, which requires a municipal electrical permit and inspection. We pull the permit and schedule the inspection as part of the project.

What if my household has more than one EV?

We plan for total charging load from the start. Load management shares the available capacity between vehicles, charges when demand is low, and keeps most homes off a costly panel upgrade. We size the circuit and settings for your current and expected fleet.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free EV charger install — level 2 estimate in Erie

Tell us about your Erie project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…