(720) 287-7958

DESIGN · BUILD · AUTOMATE

BOULDER SERVICES

Bathroom Remodel in Boulder

Bathroom Remodel Design Consultation, $225

See all 10 jobs

Licensed bathroom remodel services for Boulder and Boulder County. Transform your bathroom into a retreat.

What Boulder requires

Exempt work (no permit required, though work must still comply with all applicab: The complete list is referenced in Boulder Revised Code (B.R.C.) 1981, Title 10, Chapter 5, Section 10-5-2 (Adoption of International Building Code with Modifications, including exemptions in section J). §10-5-2

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Bathroom Remodel

Transform your bathroom into a retreat

Jobs you can book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

Fixed-price jobs

  • Bath Accessory Set Install (Up to 5 Pieces)

    Install up to 5 customer-supplied bathroom accessories — towel bars, towel rings, toilet paper holders, robe hooks, hand-towel holders — level and anchored into studs or with rated drywall/tile anchors, including…

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Install up to 5 customer-supplied bathroom accessories — towel bars, towel rings, toilet paper holders, robe hooks, hand-towel holders — level and anchored into studs or with rated drywall/tile anchors, including removal of old hardware and hole patching where old holes are covered by new hardware. NOT included: the accessories, patching and painting of exposed old holes, grab bars (separate load-rated SKU), or glass shelves into tile (quoted on site).

  • Bathroom Exhaust Fan Replacement (Same Size, Fan Included)

    Replace an existing bathroom exhaust fan with a new same-size or same-housing-compatible unit (standard 80-110 CFM quiet fan included, or install your supplied unit), reconnect to the existing duct and switched…

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Replace an existing bathroom exhaust fan with a new same-size or same-housing-compatible unit (standard 80-110 CFM quiet fan included, or install your supplied unit), reconnect to the existing duct and switched circuit, seal the housing, and verify airflow. Attic access or ceiling-side access required. NOT included: first-time installs with no existing fan, new duct runs or roof/wall cap work, larger cutouts requiring drywall patch and paint, humidity-sensing switch wiring beyond a direct swap, or heater/light combo units on multi-switch circuits (quoted on site).

  • Bathroom Exhaust Fan Swap (Same Size, Customer-Supplied Fan)

    Replace existing bathroom exhaust fan with a customer-supplied unit of the same housing footprint, reusing the existing duct connection, switch leg, and ceiling opening.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Replace existing bathroom exhaust fan with a customer-supplied unit of the same housing footprint, reusing the existing duct connection, switch leg, and ceiling opening. Includes housing swap or motor/grille insert, duct reconnection at the unit, wiring, and airflow test. Assumes existing duct is connected and serviceable and attic or below-ceiling access to the housing. Excludes ceiling enlargement/patch for larger housings, new duct runs or roof caps, and humidity-sensor switch wiring (separate device task).

  • Bathroom Mirror Install (Customer-Supplied)

    Hang a customer-supplied framed mirror or standard frameless mirror (up to 36x48) over a vanity, level and centered, using rated anchors or J-channel clips appropriate to the mirror weight, including removal of an…

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Hang a customer-supplied framed mirror or standard frameless mirror (up to 36x48) over a vanity, level and centered, using rated anchors or J-channel clips appropriate to the mirror weight, including removal of an existing mirror. NOT included: the mirror, glue-mounted plate mirror removal (risk of wall damage — quoted on site), lighted/smart mirrors needing electrical, or wall repair and paint.

  • Bathroom Remodel Design Consultation

    An in-home consult covering layout options, plumbing constraints, and finish selections for one bathroom.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    An in-home consult covering layout options, plumbing constraints, and finish selections for one bathroom. Includes a written scope summary with a budget range you can plan against.

  • Bathroom Vanity Install (Customer-Supplied)

    Remove existing vanity, set and secure customer-supplied vanity cabinet and top, connect drain and supply lines to existing standard plumbing in the same location, install customer-supplied faucet if on site, and…

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Remove existing vanity, set and secure customer-supplied vanity cabinet and top, connect drain and supply lines to existing standard plumbing in the same location, install customer-supplied faucet if on site, and leak-test. NOT included: plumbing relocation, wall repair or paint behind the old unit, countertop fabrication, disposal of the new unit's packaging beyond bagging, or vanities over 60 inches (book a visit for those).

  • Medicine Cabinet Install (Recessed)

    Install a customer-supplied recessed medicine cabinet into an existing recessed opening, or cut a new opening in a non-load-bearing interior stud bay: locate studs and scan for utilities, cut drywall, frame the opening…

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Install a customer-supplied recessed medicine cabinet into an existing recessed opening, or cut a new opening in a non-load-bearing interior stud bay: locate studs and scan for utilities, cut drywall, frame the opening with header/sill blocking, set and shim the cabinet, and trim the edges. Price holds only if the stud bay is clear of wiring, plumbing, and ducts — if we open the wall and find utilities, we install surface-mount style or reschedule with a quote, your choice. NOT included: the cabinet, utility relocation, exterior or load-bearing walls, or paint.

  • Medicine Cabinet Install (Surface Mount)

    Remove existing mirror or cabinet and install a customer-supplied surface-mount medicine cabinet, anchored level into studs or with rated anchors, doors adjusted.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Remove existing mirror or cabinet and install a customer-supplied surface-mount medicine cabinet, anchored level into studs or with rated anchors, doors adjusted. NOT included: the cabinet, lighted cabinets requiring new electrical, recessed conversions (separate SKU), wall repair behind the old unit beyond what the new cabinet covers, or mirror disposal beyond your bin.

  • Shower Door Install (Customer-Supplied)

    Install a customer-supplied framed or semi-frameless sliding or pivot shower door kit on an existing tub or shower opening: measure, cut tracks, drill tile, set panels plumb, seal, and adjust.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Install a customer-supplied framed or semi-frameless sliding or pivot shower door kit on an existing tub or shower opening: measure, cut tracks, drill tile, set panels plumb, seal, and adjust. Confirm your opening size matches the kit before booking. NOT included: the door kit, heavy frameless glass requiring two-person glazing crews, out-of-square openings needing custom glass, old-door haul-away beyond your bin, or tile repair.

Priced per item

  • Grab Bar Install (Per Bar)

    $185 each · $145 each for 2–3 · $125 each for 4+ · $129 minimum visit

    Install ADA-rated grab bars (customer-supplied or our standard stainless stock) anchored into studs where available or with rated hollow-wall/tile anchors, including tile drilling with proper bits, torque-tested to…

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    Install ADA-rated grab bars (customer-supplied or our standard stainless stock) anchored into studs where available or with rated hollow-wall/tile anchors, including tile drilling with proper bits, torque-tested to rated load. Price is per bar; book the total count. NOT included: opening walls to add blocking, fiberglass surround reinforcement panels, or fold-down shower seats (variable scope — book a visit).

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Bathroom Remodel Services in Boulder, Colorado

Autotelic provides professional bathroom remodel services throughout Boulder and the surrounding Boulder County area. Full bathroom remodels across the Denver metro from cosmetic refreshes to luxury gut renovations. Tile, fixtures, vanities, and Kerdi waterproofing. Whether you're in Boulder (home to CU Boulder) or nearby communities, our team delivers quality workmanship, licensed and insured.

A recent build

Full-home remodel after a burst pipe

Denver metro

Trigger
Burst waterline → insurance claim
Structure
Bearing wall out, flush beam in
Master bath
Curbless wet room, tub-in-shower
Result
Sold at a profit at resale
  • Insurance-claim restoration folded into a full remodel design
  • Kitchen remodel opening to the dining space
  • Living/dining bearing wall removed — flush beam, no soffit
  • Master bath expanded into a curbless wet room — shower and soaking tub in one glass enclosure
  • Second full bath remodeled
  • New flooring throughout the home

A burst waterline flooded the home while the owners were away, triggering an insurance claim for floors and drywall. Rather than a like-for-like patch, the claim was folded into a full remodel — kitchen, two baths, a bearing wall removed for an open living/dining plan, a curbless wet-room master bath, and new floors throughout. The owners invested beyond the claim, and the home sold at a profit a few years later.

Dining and living as one open space after the bearing wall came out
Living room opening to the sunroom bar
White kitchen island under the vaulted window wall
New flooring running through the main level
Master bath wet room — glass enclosure with marble shower
Second bath with patterned tile and navy vanity

Permit Thresholds

Boulder permit thresholds

Exempt work (no permit required, though work must still comply with all applicab
The complete list is referenced in Boulder Revised Code (B.R.C.) 1981, Title 10, Chapter 5, Section 10-5-2 (Adoption of International Building Code with Modifications, including exemptions in section J).§10-5-2
Code reference
Minor drywall repairs (<1 sheet or 32 sq ft).
Code reference
One-story accessory sheds (≤120 sq ft, ≤10 ft high, no utilities/electrical/mechanical/plumbing).
Code reference
Fences ≤7 ft high.
Code reference
Flatwork (private sidewalks, patios, driveways) ≤30 inches above grade, not over a basement/story below, and not part of an accessible route.
Code reference
Playground equipment accessory to 1- or 2-family dwellings.
Code reference
Prefabricated above-ground swimming pools accessory to 1- or 2-family dwellings (<24 inches deep, ≤5,000 gallons).
Code reference
Retaining walls ≤3 ft high (measured from footing bottom to wall top), unless supporting a surcharge or impounding certain flammables.

Codes are amended regularly — verify current requirements with **City of Boulder Planning and Development Services (P&DS; specifically its Building Permits and Inspections section) issues residential building permits for properties within Boulder city limits.

Energy Code

Boulder energy code quick facts

Code reference
2024 City of Boulder Energy Conservation Code (CoBECC), effective December 1, 2024 (based on the 2024 ICC suite of codes with local amendments; all-electric requirements for new construction, additions, and major alterations).
Code reference
This applies to the City of Boulder (not unincorporated Boulder County, which follows the 2021 IECC with amendments effective July 1, 2026).
Code reference
The code emphasizes performance paths (e.g., ERI/HERS targets) for most projects but retains prescriptive options for smaller additions/remodels (≤1,000 sf for residential).
Code reference
Boulder is in Climate Zone 5B.
Code reference
Prescriptive requirements align closely with or reference 2024 IECC Table R402.1.2 (and related sections R401–R404, R407–R408) unless locally amended; projects often use performance paths due to stringency.
Code reference
Key prescriptive requirements relevant to remodels/additions (from CoBECC/2024 IECC Table R402.1.2 and related sections for CZ 5B; cite the adopting code section or CoBECC equivalent):
Ceiling/attic insulation
R-49 minimum (R402.1.2 / CoBECC Chapter 4 RE).
Wood-frame above-grade walls
R-20 + R-5 continuous insulation (ci), or R-13 + R-10 ci, or R-20 ci (R402.1.2 / CoBECC Chapter 4 RE).

Codes are amended regularly — verify current requirements with **City of Boulder Planning and Development Services (P&DS; specifically its Building Permits and Inspections section) issues residential building permits for properties within Boulder city limits.

Zoning & Dimensional Standards

Setback & dimensional standards in Boulder

Zone-district dimensional standards for Boulder, quoted verbatim from the Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026). Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

Asetback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)15'
Side Setback Abutting Street (min)25'
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) A setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BCsetback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BC setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BCSsetback & dimensional standards
StandardRequirement
Front Setback (min)10'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)10'
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BCS setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BMSsetback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0' for first and second stories 12' for third story and above
Rear Setback (min)0'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BMS setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BRsetback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BR setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BT-1setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BT-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BT-2setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)10'
Side Setback Abutting Street (min)15'
Rear Setback (min)25'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) BT-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-1setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0' (k)
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) DT-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-2setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0' (k)
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) DT-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-3setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0' (k)
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) DT-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-4setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0'
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) DT-4 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-5setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0' (k)
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) DT-5 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IGsetback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) IG setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IMsetback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) IM setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IMSsetback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0'
Rear Setback (min)10'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) IMS setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IS-1setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) IS-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IS-2setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) IS-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MHsetback & dimensional standards
StandardRequirement
Front Setback (min)See section 9-7-13
Side Interior Setback (min)See section 9-7-13
Rear Setback (min)See section 9-7-13
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) MH setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MU-1setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0' or 5' (b)
Rear Setback (min)10'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) MU-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MU-2setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0'
Rear Setback (min)10'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) MU-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MU-3setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0' for first and second stories 12' for third story and above
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) MU-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MU-4setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0' for first and second stories 12' for third story and above
Rear Setback (min)0'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) MU-4 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

Psetback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) P setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

REsetback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)25'
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RE setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-1setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' or 3'
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-2setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-3setback & dimensional standards
StandardRequirement
Front Setback (min)10'
Side Interior Setback (min)1' per 3' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)40'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-4setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)1' per 2' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-4 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-5setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-5 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-6setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' or 3'
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-6 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-7setback & dimensional standards
StandardRequirement
Front Setback (min)10'
Side Interior Setback (min)1' per 3' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)40'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RH-7 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RL-1setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)5'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RL-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RL-2setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)1' per 2' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)10'
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RL-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RM-1setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)1' per 2' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)10'
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RM-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RM-2setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)5'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RM-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RM-3setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' or 3'
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RM-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RMX-1setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)5'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RMX-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RMX-2setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' (attached DUs); 1' per 2' of bldg. height, 5' min. (detached DUs) (i)
Side Setback Abutting Street (min)0' (attached DUs); 1' per 2' of bldg. height, 5' min. (detached DUs) (i)
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RMX-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RR-1setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)15'
Side Setback Abutting Street (min)25'
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RR-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RR-2setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)25'
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (Supplement 167, 2026) RR-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What a bathroom remodel usually includes

A residential bathroom remodel in the Denver metro can mean a cosmetic refresh or a full gut. Full scopes commonly cover demolition, plumbing and electrical rough-in, ventilation, waterproofing, shower or tub rebuilds, tile, vanity and lighting, and finish trim. Keeping fixtures in place is simpler than moving the toilet, shower, or sink, because relocating drains and vents changes rough-in complexity. A municipally licensed Denver general contractor coordinates the overall remodel and the licensed specialty trades required for plumbing, electrical, and related work. Cost is project-specific and depends on layout changes, wet-area rebuilds, finish selections, and access.

text

Layout, waterproofing, and ventilation

Good bathroom plans start with clearances, door swings, storage, and how water moves to the drain. Shower and tub surrounds need a continuous waterproofing strategy behind the finish surface. Exhaust ventilation should pull moist air out of the room so finishes and framing stay drier over time. If the remodel opens walls or ceilings, it is also the practical window to update outdated wiring, add GFCI protection where required, and correct undersized or missing exhaust routes.

text

Finishes and sequencing

Tile, waterproof membranes, vanity tops, fixtures, glass, paint, and flooring need a defined sequence so wet work cures before finishes go in. Material lead times often drive the schedule more than labor once demolition is done. A written selection list before rough-in reduces change orders after walls close. Accessibility updates such as curbless showers, grab-bar blocking, and clearer floor space can be planned into the same remodel when that is a goal.

text

Permits and who coordinates the work

Many bathroom remodels that move plumbing, change electrical circuits, or alter walls require permits and inspections through the local city or county. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades for the remodel package. Permit responsibility and inspection sequencing should be stated in the project plan.

Service Area

Serving Boulder and Boulder County

We serve Boulder, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Boulder project.

FAQ

Common questions

How much does Bathroom Remodel Design Consultation cost in Boulder?

$225.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Do bathroom remodels need permits?

Almost always — moving plumbing, changing electrical, or altering walls triggers a municipal permit. We pull the permit with your city or county and schedule the inspections.

Can you renovate multiple bathrooms at once?

Yes. We regularly run multi-bath renovation packages and sequence the work so you keep at least one working bathroom throughout.

How fast can it start?

We'll follow up with next steps. The Instant Estimate tool gives you a real scored estimate right away. Start dates depend on permit turnaround in your city and material lead times, which we lay out in the proposal.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY