autotelic.build

DESIGN · BUILD · AUTOMATE

BOULDER SERVICES

Security Cameras in Boulder

Licensed security cameras services for Boulder and Boulder County. Commercial-grade surveillance.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Security Cameras

Commercial-grade surveillance

Local Service

Security Cameras Services in Boulder, Colorado

Autotelic provides professional security cameras services throughout Boulder and the surrounding Boulder County area. PoE security camera systems with NVR, structured wiring, remote access, and analytics for homes and businesses. Whether you're in Boulder (home to CU Boulder) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Boulder permit thresholds

Exempt work (no permit required, though work must still comply with all applicab
The complete list is referenced in Boulder Revised Code (B.R.C.) 1981, Title 10, Chapter 5, Section 10-5-2 (Adoption of International Building Code with Modifications, including exemptions in section J).Section 10-5-2
Code reference
Minor drywall repairs (<1 sheet or 32 sq ft).
Code reference
One-story accessory sheds (≤120 sq ft, ≤10 ft high, no utilities/electrical/mechanical/plumbing).
Code reference
Fences ≤7 ft high.
Code reference
Flatwork (private sidewalks, patios, driveways) ≤30 inches above grade, not over a basement/story below, and not part of an accessible route.
Code reference
Playground equipment accessory to 1- or 2-family dwellings.
Code reference
Prefabricated above-ground swimming pools accessory to 1- or 2-family dwellings (<24 inches deep, ≤5,000 gallons).
Code reference
Retaining walls ≤3 ft high (measured from footing bottom to wall top), unless supporting a surcharge or impounding certain flammables.

Codes are amended regularly — verify current requirements with **City of Boulder Planning and Development Services (P&DS; specifically its Building Permits and Inspections section) issues residential building permits for properties within Boulder city limits.

Zoning & Dimensional Standards

Setback & dimensional standards in Boulder

Zone-district dimensional standards for Boulder, quoted verbatim from the Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024). Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

Asetback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)15'
Side Setback Abutting Street (min)25'
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) A setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BCsetback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) BC setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BCSsetback & dimensional standards
StandardRequirement
Front Setback (min)10'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)10'
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) BCS setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BMSsetback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0' for first and second stories 12' for third story and above
Rear Setback (min)0'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) BMS setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BRsetback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) BR setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BT-1setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) BT-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

BT-2setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)10'
Side Setback Abutting Street (min)15'
Rear Setback (min)25'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) BT-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-1setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0' (k)
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) DT-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-2setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0' (k)
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) DT-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-3setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0' (k)
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) DT-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-4setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0'
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) DT-4 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

DT-5setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)0' (k)
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) DT-5 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IGsetback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) IG setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IMsetback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) IM setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IMSsetback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0'
Rear Setback (min)10'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) IMS setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IS-1setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) IS-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

IS-2setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)0' or 12'
Side Setback Abutting Street (min)15'
Rear Setback (min)20'
Building Height (max)35'; 40' (in I-zones)

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) IS-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MHsetback & dimensional standards
StandardRequirement
Front Setback (min)See section 9-7-13
Side Interior Setback (min)See section 9-7-13
Rear Setback (min)See section 9-7-13
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) MH setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MU-1setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0' or 5' (b)
Rear Setback (min)10'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) MU-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MU-2setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0'
Rear Setback (min)10'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) MU-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MU-3setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0' for first and second stories 12' for third story and above
Rear Setback (min)15'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) MU-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

MU-4setback & dimensional standards
StandardRequirement
Front Setback (min)0' (k)
Side Interior Setback (min)0' or 5'
Side Setback Abutting Street (min)0' for first and second stories 12' for third story and above
Rear Setback (min)0'
Building Height (max)38'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) MU-4 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

Psetback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) P setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

REsetback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)25'
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RE setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-1setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' or 3'
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RH-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-2setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RH-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-3setback & dimensional standards
StandardRequirement
Front Setback (min)10'
Side Interior Setback (min)1' per 3' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)40'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RH-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-4setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)1' per 2' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RH-4 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-5setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RH-5 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-6setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' or 3'
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RH-6 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RH-7setback & dimensional standards
StandardRequirement
Front Setback (min)10'
Side Interior Setback (min)1' per 3' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)40'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RH-7 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RL-1setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)5'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RL-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RL-2setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)1' per 2' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)10'
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RL-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RM-1setback & dimensional standards
StandardRequirement
Front Setback (min)20'
Side Interior Setback (min)1' per 2' of bldg. height, 5' min. (i)
Side Setback Abutting Street (min)10'
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RM-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RM-2setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)5'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RM-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RM-3setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' or 3'
Side Setback Abutting Street (min)1' per 2' of bldg. height, 10' min. (i)
Rear Setback (min)15'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RM-3 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RMX-1setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)5'
Side Setback Abutting Street (min)12.5' (k)
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RMX-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RMX-2setback & dimensional standards
StandardRequirement
Front Setback (min)15'
Side Interior Setback (min)0' (attached DUs); 1' per 2' of bldg. height, 5' min. (detached DUs) (i)
Side Setback Abutting Street (min)0' (attached DUs); 1' per 2' of bldg. height, 5' min. (detached DUs) (i)
Rear Setback (min)20'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RMX-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RR-1setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)15'
Side Setback Abutting Street (min)25'
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RR-1 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

RR-2setback & dimensional standards
StandardRequirement
Front Setback (min)25' (k)
Side Interior Setback (min)10'
Side Setback Abutting Street (min)25'
Rear Setback (min)25'
Building Height (max)35'

Boulder Revised Code, Title 9 Land Use Code (through Ord. 8599, 2024) RR-2 setback standards (\u00a79-7-1 Table 7-1 Schedule of Form and Bulk Standards) — effective 2024 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What security camera projects cover

Security camera projects in the Denver metro include camera placement, PoE cabling or switching, recorders, and remote viewing setup for homes and businesses. Outdoor cameras need weather-rated housings and thoughtful aiming. A municipally licensed Denver general contractor coordinates camera packages and licensed specialty trades when new electrical power is required. Cost is project-specific and depends on camera count, cable pathways, and storage needs.

text

Coverage and power

Coverage goals should drive camera count and lens choices. PoE switch capacity must match device loads. Recording retention affects storage sizing.

text

Permits and who coordinates the work

Low-voltage camera cabling often does not need a City and County of Denver building permit. New electrical circuits for racks or injectors typically do. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades when electrical work is included.

text

What buyers should prepare

Areas to cover, indoor vs outdoor, retention preferences, and existing network details. Check HOA rules for exterior devices when applicable.

FAQ

Common questions

Do security cameras need a Denver building permit?

Often not for low-voltage devices alone. New electrical circuits usually need CPD electrical permits.

Who handles permits and licensing when power is added?

A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Colorado has no statewide general contractor license.

Wired or wireless?

Wired PoE is common for reliability. Wireless can fit some spots but still needs power and careful interference planning.

How long should footage be kept?

It depends on risk and storage budget. Define retention before choosing the recorder.

What information helps define scope?

Site photos or plans, coverage goals, camera count estimates, network details, and city or county.

Service Area

Serving Boulder and Boulder County

We serve Boulder, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Boulder project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free security cameras estimate in Boulder

Tell us about your Boulder project — we respond fast, and estimates are always free.

Name, phone, and email required.