autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

CASTLE PINES SERVICES

Second-Story Addition in Castle Pines

Licensed second-story addition services for Castle Pines and Douglas County. Double your living space without moving.

What Castle Pines requires

ER — Front Setback (min): 25' ER

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Second-Story Addition

Double your living space without moving

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Second-Story Addition Services in Castle Pines, Colorado

Autotelic provides professional second-story addition services throughout Castle Pines and the surrounding Douglas County area. Full second-story additions across the Denver metro with structural engineering, framing, roofing, and complete interior build-out. Commercially licensed and insured. Whether you're in Castle Pines (south Douglas County) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Castle Pines permit thresholds

Code reference
The City of Castle Pines Building Department requires building permits for various residential remodel projects to ensure compliance with the 2021 International Building Code/International Residential Code and the 2023 National Electrical Code.
Code reference
1-Stop Permits are for projects that do not require drawings for a plan review.
Code reference
Instead, the requirement for a permit is based on the *type* of work being performed, as detailed in the lists for 1-Stop Permits and Plan Review Permits.
Code reference
The City of Castle Pines operates under the 2021 International Building Code/International Residential Code and the 2023 National Electrical Code.
Code reference
### Taxes and Fees (Based on 2026 Fee Schedule where available, or most recent provided)
Code reference
For example, according to the 2025 and 2026 Fee Schedules:
Code reference
For projects valued from $1.00 to $500.00, the fee is $42.00 (2025/2026).
Code reference
For projects valued from $501.00 to $2,000.00, the fee is $42.00 for the first $500.00, plus $5.45 for each additional $100.00 or fraction thereof (2025/2026).

Codes are amended regularly — verify current requirements with **The City of Castle Pines Building Department (part of the City’s Community Development department) issues residential building permits.

Zoning & ADU

Castle Pines zoning & ADU quick facts

ER — Front Setback (min)
25'ER
ER — Side Interior Setback (min)
25'ER
ER — Side Setback Abutting Street (min)
25'ER
ER — Rear Setback (min)
25'ER
ER — Building Height (max)
35'ER
ER — Acreage bands
§610 other-street: <2.3 ac sides 15'; 2.3+ sides 25'. Regional/major arterial front is 100'. Shown is the 2.3+ acre row.ER
Estate Residential — Front Setback (min)
25'Estate Residential
Estate Residential — Side Interior Setback (min)
25'Estate Residential
Castle Pines Zoning Ordinance ER setback standards (§307 A-1 / §610 ER / §612 / §309 Building Height) — effective 2019-09-01 · Castle Pines Zoning Ordinance Estate Residential setback standards (§307 A-1 / §610 ER / §612 / §309 Building Height) — effective 2019-09-01Source: castlepinesco.gov

Codes are amended regularly — verify current requirements with **The City of Castle Pines Building Department (part of the City’s Community Development department) issues residential building permits.

Energy Code

Castle Pines energy code quick facts

Code reference
The City of Castle Pines, Colorado, operates under the 2021 International Energy Conservation Code (IECC) as its currently adopted energy code.
Code reference
While an earlier ordinance (Ordinance No. 16-08) adopted the 2015 IECC, state law (House Bill 22-1362) mandates that jurisdictions updating other building codes between July 1, 2023, and June 30, 2026, must adopt and enforce the 2021 IECC or an equivalent or more stringent code.Ord. No. 16-08
Code reference
The City of Castle Pines currently enforces the 2021 International Building Code (IBC) and International Residential Code (IRC), which would trigger the 2021 IECC adoption requirement.
Code reference
Castle Pines is located in Climate Zone 5B.
Code reference
Here are key prescriptive requirements from the 2021 IECC relevant to remodels and additions in Climate Zone 5B:
Code reference
### Key Prescriptive Requirements for Remodels/Additions (2021 IECC, Climate Zone 5B)
Code reference
The following requirements apply to new construction and additions, and often to portions of existing buildings that are altered, as per the 2021 IECC and generally apply to residential applications.
Requirement
R-60
Ord. No. 16-08

Codes are amended regularly — verify current requirements with **The City of Castle Pines Building Department (part of the City’s Community Development department) issues residential building permits.

text

What a second-story addition covers

A second-story addition in the Denver metro adds habitable floor over an existing house: new floor structure, stairs, roof, windows, and usually electrical, mechanical, and plumbing. The existing foundation and walls have to carry the extra load. A municipally licensed Denver general contractor coordinates the project, design professionals, and licensed specialty trades. Cost is project-specific and depends on structure, roof, and how much of the first floor is opened.

text

Structure and zoning height

City and County of Denver Community Planning and Development treats second-story additions as structural review items that exceed IRC prescriptive limits. The residential permitting guide asks for a letter of structural integrity sealed by a design professional who personally inspected the existing foundation and building (DBCA 133.3). Zoning height is measured in feet and stories from the front and rear base planes (Denver Zoning Code Sec. 13.1.2). Plans should show allowed versus proposed height.

text

Permits and who coordinates the work

Additions typically need zoning, building, and Sewer Use and Drainage (SUDP) reviews, plus electrical, mechanical, and plumbing when those systems change. Denver Energy Code Chapter 5 [RE] applies to additions. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades plus the design professionals required for the project.

text

What buyers should prepare

Target rooms, existing drawings if any, roof and attic photos, and known foundation concerns.

FAQ

Common questions

Do second-story additions need a Denver permit?

Yes. CPD requires building, zoning, and typically SUDP, with structural review because the work exceeds IRC prescriptive limits.

Who handles second-story permits and licensing?

A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.

Can the existing foundation take a second story?

Only after a design professional inspects it. CPD asks for a sealed structural-integrity letter for second-story additions.

How is height measured?

In feet and stories from the zoning front and rear base planes, not just from the sidewalk.

What information helps define scope?

Desired rooms, existing drawings, foundation notes, landmark status, and city or county.

Service Area

Serving Castle Pines and Douglas County

We serve Castle Pines, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Castle Pines project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Let's design your perfect Second-Story Addition together

Get a personalized estimate in about 2 minutes — no pressure, no obligation.

Licensed & Insured ContractorVeteran-Owned

How This Works (2 minutes)

  1. 1Tell us about your project (30 seconds)
  2. 2Answer a few quick questions for an accurate estimate (60 seconds)
  3. 3Get your personalized estimate instantly (30 seconds)

No pressure. No obligation. No spam calls. If we're not the right fit, we'll tell you — and even recommend someone who is.