DESIGN · BUILD · AUTOMATE
CASTLE PINES SERVICES
Second-Story Addition in Castle Pines
Licensed second-story addition services for Castle Pines and Douglas County. Double your living space without moving.
- Full Design Lifecycle
- Construction & Tenant Finish
- Smart Home · A/V · Edge Compute

Double your living space without moving
FREE PLANNING TOOLS
Both tools are free and take a couple of minutes — start in either one.
EVERY PROJECT STARTS WITH DESIGN
Local Service
Second-Story Addition Services in Castle Pines, Colorado
Autotelic provides professional second-story addition services throughout Castle Pines and the surrounding Douglas County area. Full second-story additions across the Denver metro with structural engineering, framing, roofing, and complete interior build-out. Commercially licensed and insured. Whether you're in Castle Pines (south Douglas County) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.
Permit Thresholds
Castle Pines permit thresholds
- Code reference
- The City of Castle Pines Building Department requires building permits for various residential remodel projects to ensure compliance with the 2021 International Building Code/International Residential Code and the 2023 National Electrical Code.
- Code reference
- 1-Stop Permits are for projects that do not require drawings for a plan review.
- Code reference
- Instead, the requirement for a permit is based on the *type* of work being performed, as detailed in the lists for 1-Stop Permits and Plan Review Permits.
- Code reference
- The City of Castle Pines operates under the 2021 International Building Code/International Residential Code and the 2023 National Electrical Code.
- Code reference
- ### Taxes and Fees (Based on 2026 Fee Schedule where available, or most recent provided)
- Code reference
- For example, according to the 2025 and 2026 Fee Schedules:
- Code reference
- For projects valued from $1.00 to $500.00, the fee is $42.00 (2025/2026).
- Code reference
- For projects valued from $501.00 to $2,000.00, the fee is $42.00 for the first $500.00, plus $5.45 for each additional $100.00 or fraction thereof (2025/2026).
Codes are amended regularly — verify current requirements with **The City of Castle Pines Building Department (part of the City’s Community Development department) issues residential building permits.
Zoning & ADU
Castle Pines zoning & ADU quick facts
- ER — Front Setback (min)
- 25'ER
- ER — Side Interior Setback (min)
- 25'ER
- ER — Side Setback Abutting Street (min)
- 25'ER
- ER — Rear Setback (min)
- 25'ER
- ER — Building Height (max)
- 35'ER
- ER — Acreage bands
- §610 other-street: <2.3 ac sides 15'; 2.3+ sides 25'. Regional/major arterial front is 100'. Shown is the 2.3+ acre row.ER
- Estate Residential — Front Setback (min)
- 25'Estate Residential
- Estate Residential — Side Interior Setback (min)
- 25'Estate Residential
Codes are amended regularly — verify current requirements with **The City of Castle Pines Building Department (part of the City’s Community Development department) issues residential building permits.
The build sequence for a Second-Story Addition project
This service is a component of How a Home remodel project works in Castle Pines.
Energy Code
Castle Pines energy code quick facts
- Code reference
- The City of Castle Pines, Colorado, operates under the 2021 International Energy Conservation Code (IECC) as its currently adopted energy code.
- Code reference
- While an earlier ordinance (Ordinance No. 16-08) adopted the 2015 IECC, state law (House Bill 22-1362) mandates that jurisdictions updating other building codes between July 1, 2023, and June 30, 2026, must adopt and enforce the 2021 IECC or an equivalent or more stringent code.Ord. No. 16-08
- Code reference
- The City of Castle Pines currently enforces the 2021 International Building Code (IBC) and International Residential Code (IRC), which would trigger the 2021 IECC adoption requirement.
- Code reference
- Castle Pines is located in Climate Zone 5B.
- Code reference
- Here are key prescriptive requirements from the 2021 IECC relevant to remodels and additions in Climate Zone 5B:
- Code reference
- ### Key Prescriptive Requirements for Remodels/Additions (2021 IECC, Climate Zone 5B)
- Code reference
- The following requirements apply to new construction and additions, and often to portions of existing buildings that are altered, as per the 2021 IECC and generally apply to residential applications.
- Requirement
- R-60
Codes are amended regularly — verify current requirements with **The City of Castle Pines Building Department (part of the City’s Community Development department) issues residential building permits.
text
What a second-story addition covers
A second-story addition in the Denver metro adds habitable floor over an existing house: new floor structure, stairs, roof, windows, and usually electrical, mechanical, and plumbing. The existing foundation and walls have to carry the extra load. A municipally licensed Denver general contractor coordinates the project, design professionals, and licensed specialty trades. Cost is project-specific and depends on structure, roof, and how much of the first floor is opened.
text
Structure and zoning height
City and County of Denver Community Planning and Development treats second-story additions as structural review items that exceed IRC prescriptive limits. The residential permitting guide asks for a letter of structural integrity sealed by a design professional who personally inspected the existing foundation and building (DBCA 133.3). Zoning height is measured in feet and stories from the front and rear base planes (Denver Zoning Code Sec. 13.1.2). Plans should show allowed versus proposed height.
text
Permits and who coordinates the work
Additions typically need zoning, building, and Sewer Use and Drainage (SUDP) reviews, plus electrical, mechanical, and plumbing when those systems change. Denver Energy Code Chapter 5 [RE] applies to additions. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades plus the design professionals required for the project.
text
What buyers should prepare
Target rooms, existing drawings if any, roof and attic photos, and known foundation concerns.
FAQ
Common questions
Do second-story additions need a Denver permit?
Yes. CPD requires building, zoning, and typically SUDP, with structural review because the work exceeds IRC prescriptive limits.
Who handles second-story permits and licensing?
A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.
Can the existing foundation take a second story?
Only after a design professional inspects it. CPD asks for a sealed structural-integrity letter for second-story additions.
How is height measured?
In feet and stories from the zoning front and rear base planes, not just from the sidewalk.
What information helps define scope?
Desired rooms, existing drawings, foundation notes, landmark status, and city or county.
Service Area
Serving Castle Pines and Douglas County
We serve Castle Pines, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Castle Pines project.
How It Runs
01
Survey
02
Design
03
Build
04
Verify
DESIGN SERVICES
Discovery & Site Analysis
Needs + preference programming, site survey, as-built documentation, feasibility.
We walk, measure, and photograph your property — existing conditions, utilities, structure, and constraints. You get the as-built documentation and feasibility read that every later decision rests on.
Learn more →Concept Design & Space Planning
Schematic design, floor plan studies, layout options.
Your scope becomes schematic floor plans you can compare side by side — circulation, daylight, adjacencies, and what each option does to the budget. Layout decisions happen on paper, where changes are cheap.
Learn more →Architectural Design & 3D Renderings
Design development, materials + finishes, photorealistic visualization.
The chosen concept resolves into materials, finishes, fixtures, and lighting — with the automation layer drawn in. Photorealistic renderings let you walk the space and adjust before anything is priced.
Learn more →Construction Documents & Permitting
Full CD sets, structural + MEP engineering coordination, permit-ready drawings.
Approved designs become coordinated architectural, structural, and MEP sheets — the set your jurisdiction permits from and trades build from. We submit, track, and answer review comments.
Learn more →CONSTRUCTION
New Construction & Custom Homes
Ground-up homes and light commercial, dirt to keys.
Ground-up residential and light commercial builds — foundations through finishes, including modular and steel construction. One accountable builder from dirt to keys.
Learn more →Remodels & Additions
Kitchens, baths, basements, pop-tops, whole-home.
Kitchens, baths, basements, pop-tops, and whole-home renovations that respect the house you already have. We handle structure, permits, and the dust.
Learn more →Commercial Tenant Finish & Build-Outs
Shells to working spaces — retail, office, restaurant, school.
Raw shells become working spaces — showrooms, offices, restaurants, schools. Dealer-spec finishes, code compliance, and opening dates held.
Learn more →ADUs & Modular Construction
Backyard cottages, garage conversions, factory-built homes.
Backyard cottages, garage conversions, and factory-built homes — zoning, design, permits, and set. Denver’s ADU rules are a specialty, not a surprise.
Learn more →Outdoor Living & Patio Structures
Decks, pergolas, and dining patios built for Colorado weather.
Decks, pergolas, and dining patios engineered for Colorado sun, snow, and hail — structure, shade, and drainage done right the first time.
Learn more →TECHNOLOGY
Smart Home Automation
Lighting, shades, climate, audio, security — one interface.
Whole-home control of lighting, shades, climate, audio, and security from a single interface — Crestron, Lutron, Savant, and Control4 designed in, not bolted on.
Learn more →A/V Systems
Theaters, distributed audio, video walls, commercial sound.
Theaters, distributed audio, video walls, and commercial sound — designed, installed, and tuned by the same team for over 20 years.
Learn more →Control Systems
Custom programming — scenes and schedules that fit the space.
Every subsystem brought into one elegant interface — custom programming for homes and venues, with scenes and schedules that match how the space is actually used.
Learn more →Networking & Edge Compute
Enterprise Wi-Fi, structured cabling, racks, on-prem compute.
Enterprise-grade Wi-Fi, structured cabling, racks, and on-premise compute — the backbone that makes everything else reliable, including our own Barbot platform.
Learn more →Solar & Energy Storage
Solar arrays, Tesla Powerwall, EV charging — certified install.
Solar arrays, Tesla Powerwall, and EV charging designed and installed by a Tesla Energy Certified team — roof, electrical, and app in one scope.
Learn more →Let's design your perfect Second-Story Addition together
Get a personalized estimate in about 2 minutes — no pressure, no obligation.
How This Works (2 minutes)
- 1Tell us about your project (30 seconds)
- 2Answer a few quick questions for an accurate estimate (60 seconds)
- 3Get your personalized estimate instantly (30 seconds)
No pressure. No obligation. No spam calls. If we're not the right fit, we'll tell you — and even recommend someone who is.
Explore