autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

GOLDEN SERVICES

Second-Story Addition in Golden

Licensed second-story addition services for Golden and Jefferson County. Double your living space without moving.

What Golden requires

ADUs are permitted in the following residential zone districts in conjunction wi: R-E, R-1, R-1A, R-2, and R-3 (Municipal Code § 18.28.240; city ADU page). § 18.28.240

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Second-Story Addition

Double your living space without moving

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Second-Story Addition Services in Golden, Colorado

Autotelic provides professional second-story addition services throughout Golden and the surrounding Jefferson County area. Full second-story additions across the Denver metro with structural engineering, framing, roofing, and complete interior build-out. Commercially licensed and insured. Whether you're in Golden (gateway to the mountains) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Golden permit thresholds

Code reference
Building Permit Fees table (effective 05/01/11, as modified by resolutions).
Exterior
One-story detached accessory structures ≤200 sq ft (residential only); fences ≤7 ft tall (unless front yard, corner lot, or historic district); landscaping; minor roof or siding repairs/replacement (10% or less of total area); minor maintenance/repairs; painting; retaining/landscape walls ≤4 ft tall
Code reference
Retaining/landscape walls over 4 ft (or supporting surcharge) also trigger requirements, often needing engineering.
For homeowners doing their own work
materials cost × 2.
Building permit fees are calculated from a tiered table based on total valuation
$1–$500 = $25.85; higher tiers add per-$100 or per-$1,000 increments up to $1M+).
Additional plan review fee (when applicable)
65% of the permit fee.
Building use tax
3% use tax on building materials, stated as 1.5% of total valuation.

Codes are amended regularly — verify current requirements with **The City of Golden (specifically its Building Division/Building Department) issues residential building permits for properties within Golden city limits.

Zoning & ADU

Golden zoning & ADU quick facts

ADUs are permitted in the following residential zone districts in conjunction wi
R-E, R-1, R-1A, R-2, and R-3 (Municipal Code § 18.28.240; city ADU page).§ 18.28.240
Code reference
Lot coverage of all accessory structures must not exceed 10% of the lot area (§ 18.28.240).§ 18.28.240
Code reference
Specific numeric standards for max lot coverage %, max building height, ADU max size, and setbacks for the listed districts (or any form types within them) are not detailed in publicly available summaries of the code or related documents without direct access to the full current Municipal Code Title
Code reference
One reference notes aggregate total lot coverage limits applying to structures in RE, R-1, and R-1A districts, but the exact percentage is not specified in available sources.
Code reference
For precise, current standards, consult the full Golden Municipal Code (library.municode.com/co/golden/codes/municipal_code, Title 18) or contact the city, as the zoning code has undergone form-based updates.

Codes are amended regularly — verify current requirements with **The City of Golden (specifically its Building Division/Building Department) issues residential building permits for properties within Golden city limits.

Energy Code

Golden energy code quick facts

Code reference
2024 International Energy Conservation Code (IECC), adopted by the City of Golden with no energy-specific local amendments noted beyond the base code (and state electric-ready/solar-ready provisions where applicable).
Code reference
Golden (Jefferson County, climate zone 5B) lists the 2024 IECC among its adopted codes on the official Building Permit Process page.
Code reference
Adoption aligns with the city’s update to the 2024 I-Codes suite (effective after the July 22, 2025 council action referenced in related materials).
Code reference
The code applies to new construction, additions, and remodels/alterations as scoped in the IECC/IRC.
Code reference
Key prescriptive requirements (2024 IECC residential provisions, Table R402.1.2 / R402.1.3 and related sections, climate zone 5 / 5B; relevant to additions and remodels where the thermal envelope or systems are altered):
Ceiling/attic insulation
Minimum R-49 (or equivalent U-factor).
Code reference
(2024 IECC Table R402.1.3 / IRC N1102.1.3; note reduction from prior editions.)
Wood-frame wall insulation
R-20 + R-5 ci, or R-13 + R-10 ci, or R-0 + R-20 ci (or equivalent U-factor options).

Codes are amended regularly — verify current requirements with **The City of Golden (specifically its Building Division/Building Department) issues residential building permits for properties within Golden city limits.

text

What a second-story addition covers

A second-story addition in the Denver metro adds habitable floor over an existing house: new floor structure, stairs, roof, windows, and usually electrical, mechanical, and plumbing. The existing foundation and walls have to carry the extra load. A municipally licensed Denver general contractor coordinates the project, design professionals, and licensed specialty trades. Cost is project-specific and depends on structure, roof, and how much of the first floor is opened.

text

Structure and zoning height

City and County of Denver Community Planning and Development treats second-story additions as structural review items that exceed IRC prescriptive limits. The residential permitting guide asks for a letter of structural integrity sealed by a design professional who personally inspected the existing foundation and building (DBCA 133.3). Zoning height is measured in feet and stories from the front and rear base planes (Denver Zoning Code Sec. 13.1.2). Plans should show allowed versus proposed height.

text

Permits and who coordinates the work

Additions typically need zoning, building, and Sewer Use and Drainage (SUDP) reviews, plus electrical, mechanical, and plumbing when those systems change. Denver Energy Code Chapter 5 [RE] applies to additions. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades plus the design professionals required for the project.

text

What buyers should prepare

Target rooms, existing drawings if any, roof and attic photos, and known foundation concerns.

FAQ

Common questions

Do second-story additions need a Denver permit?

Yes. CPD requires building, zoning, and typically SUDP, with structural review because the work exceeds IRC prescriptive limits.

Who handles second-story permits and licensing?

A municipally licensed Denver general contractor coordinates the project, design professionals, and specialty trades. Colorado has no statewide general contractor license.

Can the existing foundation take a second story?

Only after a design professional inspects it. CPD asks for a sealed structural-integrity letter for second-story additions.

How is height measured?

In feet and stories from the zoning front and rear base planes, not just from the sidewalk.

What information helps define scope?

Desired rooms, existing drawings, foundation notes, landmark status, and city or county.

Service Area

Serving Golden and Jefferson County

We serve Golden, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Golden project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Let's design your perfect Second-Story Addition together

Get a personalized estimate in about 2 minutes — no pressure, no obligation.

Licensed & Insured ContractorVeteran-Owned

How This Works (2 minutes)

  1. 1Tell us about your project (30 seconds)
  2. 2Answer a few quick questions for an accurate estimate (60 seconds)
  3. 3Get your personalized estimate instantly (30 seconds)

No pressure. No obligation. No spam calls. If we're not the right fit, we'll tell you — and even recommend someone who is.