(720) 287-7958

DESIGN · BUILD · AUTOMATE

BRIGHTON SERVICES

Land Planning in Brighton

Pre-Purchase Land Feasibility Package, $750

Licensed land planning services for Brighton and Adams County. Site analysis and entitlement strategy.

What Brighton requires

Brighton, Colorado (City of Brighton building department) requires a building pe: Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system... §R105.1

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Land Planning

Site analysis and entitlement strategy

Book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • Pre-Purchase Land Feasibility Package

    Before you close on a lot, we document zoning, buildable area, utility availability, and likely development costs.

    $375 deposit to book, the rest when the work is done · morning (8–12) or afternoon (12–4)

    What's included

    Before you close on a lot, we document zoning, buildable area, utility availability, and likely development costs. You receive a written report you can use during due diligence.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Land Planning Services in Brighton, Colorado

Autotelic provides professional land planning services throughout Brighton and the surrounding Adams County area. Site feasibility analysis, zoning research, and entitlement support for residential and commercial development projects. Whether you're in Brighton (northeast Denver metro) or nearby communities, our team delivers quality workmanship, licensed and insured.

Permit Thresholds

Brighton permit thresholds

Brighton, Colorado (City of Brighton building department) requires a building pe
Any owner or authorized agent who intends to construct, enlarge, alter, repair, move, demolish or change the occupancy of a building or structure, or to erect, install, enlarge, alter, repair, remove, convert or replace any electrical, gas, mechanical or plumbing system...§R105.1
Code reference
This is codified in Brighton Municipal Code (BMC) Chapter 15 (Buildings and Construction), particularly Article 15-28 (International Residential Code adoption and amendments).
Building
One-story detached accessory structures (e.g., sheds, playhouses) ≤ 200 sq ft floor area (zoning must still be met); retaining walls ≤ 4 ft high (footing to top); painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work; prefabricated swimming pools < 24" deep; swing set
Electrical
Listed plug-and-cord temporary decorative lighting; replacement of a circuit breaker (same location/capacity); low-voltage wiring/devices (< 25 volts, ≤ 50 watts); minor repairs like changing bulbs or same-location fixture/outlet replacement.
Notes on exemptions and triggers
The FAQ lists slightly varying shed thresholds (e.g., < 120 sq ft in one place); the dedicated permit guide (200 sq ft) is the more specific reference.
Code reference
Any structural alteration, enlargement, or repair affecting the structure generally triggers a permit under the broad “alter/repair” language of R105.1 (no separate valuation-based threshold or explicit “structural trigger” list beyond this).
Use tax/fee basis
Use tax is 3.75% applied to 50% of the project valuation (materials + labor).

Codes are amended regularly — verify current requirements with **The City of Brighton (specifically its Community Development/Building Division) issues residential building permits.

text

What this covers

Lot layout, access, and zoning constraints before architecture freezes. Denver zone district, overlays, and bulk plane drive what can sit on the lot.

FAQ

Common questions

How much does Pre-Purchase Land Feasibility Package cost in Brighton?

$750.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay the $375 deposit. We confirm within 24 hours or refund you in full.

Who handles the land planning permits and licensing?

A municipally licensed Denver general contractor coordinates licensed specialty trades. Colorado has no statewide general-contractor license; cities and counties license general contractors. DORA licenses electrical and plumbing, not general contractors.

What is typically in scope for land planning in Denver?

Lot layout, access, and zoning constraints before architecture freezes.

Service Area

Serving Brighton and Adams County

We serve Brighton, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Brighton project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free land planning estimate in Brighton

Tell us about your Brighton project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…