autotelic.build

DESIGN · BUILD · AUTOMATE

NORTHGLENN SERVICES

Excavation in Northglenn

Licensed excavation services for Northglenn and Adams County. Groundwork done right.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Excavation

Groundwork done right

Local Service

Excavation Services in Northglenn, Colorado

Autotelic provides professional excavation services throughout Northglenn and the surrounding Adams County area. Foundation excavation, utility trenching, grading, and backfill services for residential and commercial construction. Whether you're in Northglenn (north Denver metro) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permit Thresholds

Northglenn permit thresholds

Code reference
Residential remodel permits in Northglenn, CO, are administered by the Building Division (contracted to SAFEbuilt) under the adopted and locally amended 2021 International Residential Code (IRC), per Northglenn Municipal Code Chapter 10, Article 8 (Section 10-8-5 amendments).Section 10-8-5
Code reference
Permits are generally required for most residential remodel, alteration, addition, or repair work unless it qualifies for one of the narrow exemptions in the amended IRC Section R105.2.Section R105.2.
Code reference
### Key Exemptions (IRC R105.2, as amended)
Exception 1 (amended)
Detached accessory structures (as defined in Chapter 11 of the Northglenn Municipal Code) with floor area ≤ 200 square feet.
Code reference
(Standard IRC Exception 1 deleted in full and replaced.)
Exception 2
Deleted in its entirety.
Code reference
Permit and plan-review fees are based on project valuation (determined via square footage applied to the ICC Building Valuation Data Table, currently referencing the Feb 2019 table, or as otherwise established).
Code reference
Fees follow the 1997 Uniform Building Code schedule.

Codes are amended regularly — verify current requirements with **The City of Northglenn Building Division (contracted services provided by SAFEbuilt) issues residential building permits.

Energy Code

Northglenn energy code quick facts

Code reference
2021 IECC (with local amendments), per Northglenn Municipal Code Article 10-11 (adopted by Ord. 1799, 2020; Ord. 1847, 2023).
Code reference
Northglenn has not yet adopted the 2024 codes (scheduled for summer 2026).
Code reference
mixed-fuel building definitions/credits (e.g., 10 credits for all-electric new buildings or 20 for mixed-fuel from specified tables), and related provisions, but do not alter the base prescriptive insulation/U-factor tables or air-leakage thresholds from the 2021 IECC for Climate Zone 5B.
Code reference
Key prescriptive requirements relevant to remodels/additions (drawn from the adopted 2021 IECC provisions for CZ 5B, which apply unless a specific alteration triggers full compliance or exceptions; see IECC Chapter 5 / R5 sections for existing buildings):
Ceiling/attic insulation
R-60 (2021 IECC Table R402.1.2 / equivalent commercial table; applicable when accessible during remodels/additions).
Wood-frame wall insulation
R-20 + R-5 ci or R-13 + R-10 ci (2021 IECC Table R402.1.2; relevant for additions or wall alterations exposing cavities).
Air leakage / blower-door testing threshold
Maximum 3 ACH50 (2021 IECC R402.4.1.2; mandatory for new construction and often triggered or recommended for major remodels/additions meeting certain thresholds).
Additional electric infrastructure for combustion equipment (amendment to 2021 I
Junction box, continuous raceway to panel, reserved breaker space, and labeling “For future electric equipment” sized for equivalent electric load (Section C405.13 / equivalent residential; applies to alterations involving combustion equipment).Section C405.13

Codes are amended regularly — verify current requirements with **The City of Northglenn Building Division (contracted services provided by SAFEbuilt) issues residential building permits.

text

What excavation work covers

Excavation in the Denver metro includes foundation cut, site grading, utility trenches, benching, sloping, and shoring when soils or lot-line conditions require it. Neighboring structures, utilities, and the public right-of-way often drive method. A municipally licensed Denver general contractor coordinates earthwork and licensed specialty trades. Cost is project-specific and depends on depth, soils, and protection of adjacent property.

text

When shoring and extra permits show up

Denver CPD commonly treats excavation, benching, or shoring as a separate permit when the cut is more than 4 feet deep, closer than 4 feet to a lot line, or steeper than 1.5 horizontal to 1 vertical. IRC houses follow building-code policy ADMIN 130/131 and DCBC 3307; those details often ride with the residential construction permit, with excavation issued first. Shoring and soils packages are typically sealed by design professionals. Work that abuts the public ROW may need a DOTI excavation bond; shoring that enters the ROW needs a temporary shoring ROW permit.

text

Permits and who coordinates the work

City and County of Denver Community Planning and Development reviews excavation and shoring. Denver DOTI reviews Sewer Use and Drainage (SUDP) for excavations, grading, floodplain, groundwater, and ROW impacts. The residential permitting guide also calls for DDPHE review on excavations. Check floodplain status at denvergov.org/flood before drawing. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades for excavation scopes.

text

What buyers should prepare

Proposed depth, distance to lot lines, any soils report, photos of neighboring structures, and whether the dig will touch the alley or street.

FAQ

Common questions

Do I need a separate excavation permit in Denver?

Often yes when the cut is over 4 feet deep, close to a lot line, or steeper than 1.5 to 1. Houses may include excavation details with the building permit, with excavation issued before construction.

Who handles excavation permits and licensing?

A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Colorado has no statewide general contractor license.

What is SUDP doing on a dig?

DOTI reviews sewer, storm grading, floodplain, groundwater, and ROW impacts for excavations. It is a separate review that typically runs with the building package.

When is shoring required?

When slopes cannot be laid back to the allowed ratio, when the cut is near a lot line or structure, or when the soils report requires it. Design professionals seal those packages.

What information helps define scope?

Depth, lot-line clearance, floodplain status, existing utilities, and city or county.

Service Area

Serving Northglenn and Adams County

We serve Northglenn, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Northglenn project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free excavation estimate in Northglenn

Tell us about your Northglenn project — we respond fast, and estimates are always free.

Name, phone, and email required.