autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

LITTLETON SERVICES

Excavation in Littleton

Licensed excavation services for Littleton and Arapahoe County. Groundwork done right.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Excavation

Groundwork done right

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Excavation Services in Littleton, Colorado

Autotelic provides professional excavation services throughout Littleton and the surrounding Arapahoe County area. Foundation excavation, utility trenching, grading, and backfill services for residential and commercial construction. Whether you're in Littleton (historic downtown Littleton) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permits & Licensing

Permits in Littleton

Littleton building permits are issued by the Community Development Department's Building Division and Permit Center, and a license or registration certificate is required to obtain permits for work within city limits. Applications, plan submittals, and inspection scheduling run through the eTRAKiT online system. Authority: City of Littleton — Community Development Department (Building Division / Permit Center).

Permit Thresholds

Littleton permit thresholds

Code reference
Littleton has adopted the 2024 International Residential Code (IRC) and other International Codes (with local amendments) under Littleton City Code Title 4, Building Regulations, Chapter 1.
Code reference
Standard IRC Section R105.2 exemptions typically apply (e.g., certain minor non-structural repairs, painting, or very small accessory structures), but Littleton provides no separate local valuation threshold below which permits are automatically waived for remodel/alteration work.Section R105.2
Code reference
Exempt work lists and structural triggers are governed by the adopted 2024 IRC (with amendments) and Littleton’s submittal policies.
Code reference
Minor cosmetic or non-structural work (e.g., painting, flooring replacement without affecting structure) is typically exempt under IRC R105.2.
Building permit fees follow a tiered schedule based on total valuation (e.g., $1
$25.85; higher tiers add incremental amounts per $100 or $1,000).
Code reference
Plan review fee is 65% of the permit fee(s) when blueprints/construction documents are reviewed.
Code reference
Use tax deposit = 0.01969 × total job valuation, calculated as ((total job valuation × 52.5%) × 3.75%).
Code reference
Arapahoe County Open Space Tax = 0.00125 × total valuation, calculated as ((total job valuation × 50%) × 0.25%).

Codes are amended regularly — verify current requirements with City of Littleton — Community Development Department (Building Division / Permit Center).

Energy Code

Littleton energy code quick facts

Code reference
2024 IECC (residential and commercial provisions), as adopted by reference with amendments in Littleton City Code Title 4, Chapter 1 (Ordinance 11, Series 2025). The city also adopts the Colorado Model Electric Ready and Solar Ready Code (June 1, 2023 version).Ordinance 11
Code reference
Prescriptive R-values/U-factors are unchanged from the 2024 I-codes (no local reductions or increases).
Code reference
Littleton is in Climate Zone 5B.
Code reference
Alterations/additions to the building thermal envelope (new assemblies, modifications, or change-in-use) must generally meet the new-construction prescriptive requirements below; existing assemblies that are exposed but not modified may be insulated to the greatest extent possible without exceeding
Code reference
Some exceptions apply (e.g., storm windows, roof recovers) provided energy use is not increased (amended C503.2 / R503.1.1).
Ceiling/attic insulation
R-49 (or R-38 over 100% of the area if uncompressed R-38 extends over the wall top plate at eaves; limited reduction to R-30 allowed for certain roof/ceiling designs up to 500 sf or 20% of ceiling area).
Adopting reference/ordinance
2024 IECC Table R402.1.2 / IRC Table N1102.1.2 (as consolidated in city table, note b/c).
Wood-framed above-grade walls
R-20ci only, or R-13cav + R-10ci, or R-20cav + R-5ci, or R-30cav only.

Codes are amended regularly — verify current requirements with City of Littleton — Community Development Department (Building Division / Permit Center).

text

What excavation work covers

Excavation in the Denver metro includes foundation cut, site grading, utility trenches, benching, sloping, and shoring when soils or lot-line conditions require it. Neighboring structures, utilities, and the public right-of-way often drive method. A municipally licensed Denver general contractor coordinates earthwork and licensed specialty trades. Cost is project-specific and depends on depth, soils, and protection of adjacent property.

text

When shoring and extra permits show up

Denver CPD commonly treats excavation, benching, or shoring as a separate permit when the cut is more than 4 feet deep, closer than 4 feet to a lot line, or steeper than 1.5 horizontal to 1 vertical. IRC houses follow building-code policy ADMIN 130/131 and DCBC 3307; those details often ride with the residential construction permit, with excavation issued first. Shoring and soils packages are typically sealed by design professionals. Work that abuts the public ROW may need a DOTI excavation bond; shoring that enters the ROW needs a temporary shoring ROW permit.

text

Permits and who coordinates the work

City and County of Denver Community Planning and Development reviews excavation and shoring. Denver DOTI reviews Sewer Use and Drainage (SUDP) for excavations, grading, floodplain, groundwater, and ROW impacts. The residential permitting guide also calls for DDPHE review on excavations. Check floodplain status at denvergov.org/flood before drawing. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades for excavation scopes.

text

What buyers should prepare

Proposed depth, distance to lot lines, any soils report, photos of neighboring structures, and whether the dig will touch the alley or street.

FAQ

Common questions

Do I need a separate excavation permit in Denver?

Often yes when the cut is over 4 feet deep, close to a lot line, or steeper than 1.5 to 1. Houses may include excavation details with the building permit, with excavation issued before construction.

Who handles excavation permits and licensing?

A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Colorado has no statewide general contractor license.

What is SUDP doing on a dig?

DOTI reviews sewer, storm grading, floodplain, groundwater, and ROW impacts for excavations. It is a separate review that typically runs with the building package.

When is shoring required?

When slopes cannot be laid back to the allowed ratio, when the cut is near a lot line or structure, or when the soils report requires it. Design professionals seal those packages.

What information helps define scope?

Depth, lot-line clearance, floodplain status, existing utilities, and city or county.

Service Area

Serving Littleton and Arapahoe County

We serve Littleton, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Littleton project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free excavation estimate in Littleton

Tell us about your Littleton project — we respond fast, and estimates are always free.

Name, phone, and email required.