autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

AURORA SERVICES

Excavation in Aurora

Licensed excavation services for Aurora and Arapahoe/Adams County. Groundwork done right.

  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Excavation

Groundwork done right

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Excavation Services in Aurora, Colorado

Autotelic provides professional excavation services throughout Aurora and the surrounding Arapahoe/Adams County area. Foundation excavation, utility trenching, grading, and backfill services for residential and commercial construction. Whether you're in Aurora (Colorado's third-largest city) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

Permits & Licensing

Permits in Aurora

Aurora building permits are issued by the Building Division's Permit Center, which also handles public improvement, sign, and lawn and irrigation permits. Contractor licensing is a City of Aurora requirement, and applications go through the Aurora4Biz.org online portal. Authority: City of Aurora — Building Division (Permit Center).

Permit Thresholds

Aurora permit thresholds

Code reference
Permits are generally required for residential remodel work in Aurora, Colorado, per the adopted building codes (primarily the 2021 International Residential Code (IRC) with local amendments in Aurora City Code Chapter 22, Article V), unless specifically exempt.
Aurora City Code § 22-184 (amending IRC R105.2) exempts only
one-story detached accessory residential storage sheds, playhouses, or shade structures ≤120 sq ft, not attached to the residence, and not used for vehicle storage.§ 22-184
Code reference
Aurora City Code § 22-135 (amending IBC 105.2) has similar limited exemptions for certain small accessory structures, fences ≤7 ft high (plus all chain-link fences), and antennae/towers ≤25 ft high.§ 22-135
Structural triggers
Any structural alteration, addition, or work affecting load-bearing elements generally requires a permit under the adopted IRC (see R105 and amendments).
Use tax (construction materials use tax)
Prior to permit issuance, a deposit is required based on 3.75% (three and three-fourths percent) applied to 50% of the total estimated cost of the building/construction/reconstruction/alteration/expansion/modification/improvement (or 100% of the total estimated cost of construction materials/
Code reference
This is per Aurora City Code § 130-61.§ 130-61.
Code reference
All information is based on the Aurora Municipal Code (Chapter 22) and official city resources.

Codes are amended regularly — verify current requirements with City of Aurora — Building Division (Permit Center).

Energy Code

Aurora energy code quick facts

Code reference
Aurora, Colorado, has adopted the 2021 International Energy Conservation Code (IECC) as its base energy code (with the Colorado Model Electric Ready and Solar Ready Code also required by state law).
Code reference
Aurora is in IECC Climate Zone 5B.
Code reference
The adopting provision is Aurora City Code § 22-203 (Code adopted, under Article VI, International Energy Conservation Code).§ 22-203
Code reference
Key prescriptive requirements relevant to remodels/additions (drawn from 2021 IECC Table R402.1.2 and related sections for CZ 5B; these apply unless a performance path or other compliance option is used):
Ceiling/attic insulation
R-49 (2021 IECC Table R402.1.2, CZ 5B).
Wood-frame wall insulation
R-20 or 13 + 5ci (continuous insulation) (2021 IECC Table R402.1.2, CZ 5B).
Floor insulation (over unconditioned space)
R-30 (2021 IECC Table R402.1.2, CZ 5B).
Fenestration (windows)
Maximum U-factor 0.30 and SHGC 0.40 (2021 IECC Table R402.1.2, CZ 5B).

Codes are amended regularly — verify current requirements with City of Aurora — Building Division (Permit Center).

Zoning & Dimensional Standards

Setback & dimensional standards in Aurora

Zone-district dimensional standards for Aurora, quoted verbatim from the Aurora Unified Development Ordinance. Knowing your lot's district — and its setbacks, height, and coverage limits — is where every feasibility conversation starts.

I-1setback & dimensional standards
StandardRequirement
Rear Setback (min)5 ft.

Aurora Unified Development Ordinance I-1 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

I-2setback & dimensional standards
StandardRequirement
Rear Setback (min)5 ft.

Aurora Unified Development Ordinance I-2 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-1setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)6,000 sf. [1]
Lot Frontage, Single-Family Detached (min)Subarea A: 50 ft. Subarea B: 60 ft.
Front Setback (min)25 ft. [4]
Side Interior Setback (min)5 ft. [6]
Side Setback Abutting Local Street (min)12.5 ft.
Rear Setback (min)20 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-1 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-2setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)6,000 sf. [1]
Lot Frontage, Single-Family Detached (min)Subarea A: 50 ft. Subarea B: 60 ft.
Front Setback (min)20 ft. [4]
Side Interior Setback (min)5 ft.[6]
Side Setback Abutting Local Street (min)10 ft.
Rear Setback (min)15 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-2 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-3setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)5,000 sf.
Lot Frontage, Single-Family Detached (min)50 ft.
Front Setback (min)15 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)10 ft.
Rear Setback (min)10 ft.
Building Height (max)45 ft.[7]

Aurora Unified Development Ordinance R-3 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-4setback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)5,000 sf.
Lot Frontage, Single-Family Detached (min)50 ft.
Front Setback (min)12 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)7.5 ft.
Rear Setback (min)10 ft.
Building Height (max)65 ft.[8]

Aurora Unified Development Ordinance R-4 setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-MHsetback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)[2]
Front Setback (min)15 ft.
Side Interior Setback (min)5 ft.
Side Setback Abutting Local Street (min)15 ft.
Rear Setback (min)8 ft.
Building Height (max)20 ft.[9]

Aurora Unified Development Ordinance R-MH setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

R-Rsetback & dimensional standards
StandardRequirement
Lot Area, Single-Family Detached (min)43,560 sf.
Lot Frontage, Single-Family Detached (min)120 ft.
Front Setback (min)30 ft.
Side Interior Setback (min)10 ft.
Side Setback Abutting Local Street (min)25 ft.
Rear Setback (min)25 ft.
Building Height (max)38 ft.

Aurora Unified Development Ordinance R-R setback standards (146-4.2.2 Table 4.2-1) — effective 2026-02-23 · View the code

Verify current requirements with the jurisdiction — informational reference only. Standards vary by overlay, lot, and use; we confirm the exact rules for your property during feasibility.

text

What excavation work covers

Excavation in the Denver metro includes foundation cut, site grading, utility trenches, benching, sloping, and shoring when soils or lot-line conditions require it. Neighboring structures, utilities, and the public right-of-way often drive method. A municipally licensed Denver general contractor coordinates earthwork and licensed specialty trades. Cost is project-specific and depends on depth, soils, and protection of adjacent property.

text

When shoring and extra permits show up

Denver CPD commonly treats excavation, benching, or shoring as a separate permit when the cut is more than 4 feet deep, closer than 4 feet to a lot line, or steeper than 1.5 horizontal to 1 vertical. IRC houses follow building-code policy ADMIN 130/131 and DCBC 3307; those details often ride with the residential construction permit, with excavation issued first. Shoring and soils packages are typically sealed by design professionals. Work that abuts the public ROW may need a DOTI excavation bond; shoring that enters the ROW needs a temporary shoring ROW permit.

text

Permits and who coordinates the work

City and County of Denver Community Planning and Development reviews excavation and shoring. Denver DOTI reviews Sewer Use and Drainage (SUDP) for excavations, grading, floodplain, groundwater, and ROW impacts. The residential permitting guide also calls for DDPHE review on excavations. Check floodplain status at denvergov.org/flood before drawing. Cities and counties license general contractors. Colorado has no statewide general contractor license. Autotelic acts as a municipally licensed Denver general contractor and coordinates licensed specialty trades for excavation scopes.

text

What buyers should prepare

Proposed depth, distance to lot lines, any soils report, photos of neighboring structures, and whether the dig will touch the alley or street.

FAQ

Common questions

Do I need a separate excavation permit in Denver?

Often yes when the cut is over 4 feet deep, close to a lot line, or steeper than 1.5 to 1. Houses may include excavation details with the building permit, with excavation issued before construction.

Who handles excavation permits and licensing?

A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Colorado has no statewide general contractor license.

What is SUDP doing on a dig?

DOTI reviews sewer, storm grading, floodplain, groundwater, and ROW impacts for excavations. It is a separate review that typically runs with the building package.

When is shoring required?

When slopes cannot be laid back to the allowed ratio, when the cut is near a lot line or structure, or when the soils report requires it. Design professionals seal those packages.

What information helps define scope?

Depth, lot-line clearance, floodplain status, existing utilities, and city or county.

Service Area

Serving Aurora and Arapahoe/Adams County

We serve Aurora, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Aurora project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

TRUSTED TO BUILD FOR

  • Punch Bowl SocialFirst four locations
  • Spectrum RetirementSenior living communities
  • Denver HighlandsFirst modular custom home

Free Estimate

Get a free excavation estimate in Aurora

Tell us about your Aurora project — we respond fast, and estimates are always free.

Name, phone, and email required.