(720) 287-7958

DESIGN · BUILD · AUTOMATE

LAKEWOOD SERVICES

Excavation in Lakewood

Concrete Flatwork Visit, $99 visit fee — credited toward the work

Licensed excavation services for Lakewood and Jefferson County. Groundwork done right.

What Lakewood requires

Code reference: Permits are generally required for residential remodel work in Lakewood, Colorado, unless the work falls under specific exemptions listed in the city’s adopted Building Code (referenced as § 105.2 in secondary sources and detailed in the official exemptions list). There are no broad valuation th § 105.2

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Excavation

Groundwork done right

Book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • Concrete Flatwork Visit

    $99 visit fee — credited toward the work

    We evaluate cracked or settled driveways, walks, patios, and steps and quote repair, mudjacking referral, or replacement.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    We evaluate cracked or settled driveways, walks, patios, and steps and quote repair, mudjacking referral, or replacement. The $99 trip fee applies toward approved work.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Excavation Services in Lakewood, Colorado

Autotelic provides professional excavation services throughout Lakewood and the surrounding Jefferson County area. Foundation excavation, utility trenching, grading, and backfill services for residential and commercial construction. Whether you're in Lakewood (Jefferson County's largest city) or nearby communities, our team delivers quality workmanship, licensed and insured.

The build sequence for a Excavation project

Every project starts with a feasibility study; this trade is priced from the same assemblies.

  1. Excavation feasibility in Lakewood
  2. How a Excavation project is estimated

Start a Excavation feasibility study

Permits & Licensing

Permits in Lakewood

Lakewood building and construction permits are issued through the Public Works Department, and contractors must be registered with the city and hold a Lakewood contractor account before pulling permits. Permitting and inspections run through the city's eTRAKiT online system. Authority: City of Lakewood — Public Works Department (Building and Construction Permits).

Permit Thresholds

Lakewood permit thresholds

Code reference
Permits are generally required for residential remodel work in Lakewood, Colorado, unless the work falls under specific exemptions listed in the city’s adopted Building Code (referenced as § 105.2 in secondary sources and detailed in the official exemptions list). There are no broad valuation th§ 105.2
Code reference
One-story detached accessory buildings (tool/storage sheds, pergolas, playhouses, etc.) ≤ 120 sq ft (commercial) or ≤ 200 sq ft (residential), with additional placement rules.
Code reference
Moveable cases, cabinets, counters, and partitions ≤ 5’9” high.
Code reference
Retaining walls ≤ 30 inches high (unless supporting surcharge or impounding flammables).
Code reference
Private walks/driveways ≤ 30 inches above grade (not over basement/story below, not part of accessible route).
Code reference
Prefabricated non-heated swimming pools < 24 inches deep without circulation system.
Code reference
Window awnings on Group R-3 occupancies projecting ≤ 54” from exterior wall.
Code reference
Roof covering repairs < 100 sq ft (unless removing mechanical/electrical equipment).

Codes are amended regularly — verify current requirements with City of Lakewood — Public Works Department (Building and Construction Permits).

Energy Code

Lakewood energy code quick facts

Code reference
2021 IECC (with Colorado Model Electric Ready and Solar Ready Code amendments required by state law HB22-1362; Lakewood has also adopted solar-ready provisions via Appendix RB).
Code reference
Lakewood’s adopted codes document explicitly lists the 2021 International Energy Conservation Code (no major local energy-specific amendments noted beyond state-mandated additions).
Code reference
Climate zone is 5 (5B for the Denver-metro area).
Code reference
Key prescriptive requirements (from 2021 IECC Table R402.1.2 and related sections for Climate Zone 5, applicable to new construction, additions, and alterations/remodels where triggered; existing buildings and additions must comply with envelope and other provisions unless exempted):
Ceiling/attic insulation
R-60 (or equivalent U-factor).
Adopting reference
2021 IECC Table R402.1.2 (R402.1 prescriptive requirements).
Wood-frame wall insulation
R-20 + R-5ci or R-13 + R-10ci (or equivalent U-factor).
Adopting reference
2021 IECC Table R402.1.2.

Codes are amended regularly — verify current requirements with City of Lakewood — Public Works Department (Building and Construction Permits).

text

What excavation work covers

Excavation in the Denver metro includes foundation cut, site grading, utility trenches, benching, sloping, and shoring when soils or lot-line conditions require it. Neighboring structures, utilities, and the public right-of-way often drive method. A municipally licensed Denver general contractor coordinates earthwork and licensed specialty trades. Cost is project-specific and depends on depth, soils, and protection of adjacent property.

text

What buyers should prepare

Proposed depth, distance to lot lines, any soils report, photos of neighboring structures, and whether the dig will touch the alley or street.

FAQ

Common questions

How much does Concrete Flatwork Visit cost in Lakewood?

$99 visit fee — credited toward the work.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Do I need a separate excavation permit in Denver?

Often yes when the cut is over 4 feet deep, close to a lot line, or steeper than 1.5 to 1. Houses may include excavation details with the building permit, with excavation issued before construction.

Who handles excavation permits and licensing?

A municipally licensed Denver general contractor coordinates the project and licensed specialty trades. Colorado has no statewide general contractor license.

What is SUDP doing on a dig?

DOTI reviews sewer, storm grading, floodplain, groundwater, and ROW impacts for excavations. It is a separate review that typically runs with the building package.

When is shoring required?

When slopes cannot be laid back to the allowed ratio, when the cut is near a lot line or structure, or when the soils report requires it. Design professionals seal those packages.

What information helps define scope?

Depth, lot-line clearance, floodplain status, existing utilities, and city or county.

Service Area

Serving Lakewood and Jefferson County

We serve Lakewood, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Lakewood project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free excavation estimate in Lakewood

Tell us about your Lakewood project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…