autotelic.build(720) 287-7958

DESIGN · BUILD · AUTOMATE

CENTENNIAL SERVICES

Epoxy Coatings in Centennial

Site visit and written estimate, $149

Licensed epoxy coatings services for Centennial and Arapahoe County. Durable, beautiful floor finishes.

What Centennial requires

Code reference: In Centennial, Colorado, building permits for residential remodel work are governed by the 2021 International Residential Code (IRC) Section R105 (adopted via Centennial Municipal Code Chapter 18 – Building Regulations, per Ordinance 2023-O-06 and related adoptions of the 2021 I-Codes). §R105

See full local requirements ↓
  • Full Design Lifecycle
  • Construction & Tenant Finish
  • Smart Home · A/V · Edge Compute
Epoxy Coatings

Durable, beautiful floor finishes

Book online

Pick your job and choose a time.

Pay when you book. We confirm within 24 hours or refund you in full.

  • Site visit and written estimate

    We come out, look at the job and send you a written estimate.

    Pay when you book · morning (8–12) or afternoon (12–4)

    What's included

    We come out, look at the job and send you a written estimate. The visit is credited to the job if you go ahead.

FREE PLANNING TOOLS

Both tools are free and take a couple of minutes — start in either one.

Local Service

Epoxy Coatings Services in Centennial, Colorado

Autotelic provides professional epoxy coatings services throughout Centennial and the surrounding Arapahoe County area. Garage, commercial, and industrial epoxy floor coatings including solid, flake, and metallic finishes with proper surface prep. Whether you're in Centennial (south Denver metro) or nearby communities, our team delivers quality workmanship backed by Colorado licensing and full insurance coverage.

The build sequence for a Epoxy Coatings project

Every project starts with a feasibility study; this trade is priced from the same assemblies.

  1. Epoxy Coatings feasibility in Centennial
  2. How a Epoxy Coatings project is estimated

Start a Epoxy Coatings feasibility study

Permits & Licensing

Permits in Centennial

Centennial building permits, inspections, and contractor license approvals are handled by the city's Building Division. Permits and contractor licenses must be applied for online through the city's Self-Service Portal, and we handle that process as part of every project. Authority: City of Centennial — Building Division.

Permit Thresholds

Centennial permit thresholds

Code reference
In Centennial, Colorado, building permits for residential remodel work are governed by the 2021 International Residential Code (IRC) Section R105 (adopted via Centennial Municipal Code Chapter 18 – Building Regulations, per Ordinance 2023-O-06 and related adoptions of the 2021 I-Codes).§R105
Code reference
Typically exempt work (aligning with IRC R105.2 exemptions, with local application) includes:
Code reference
One-story detached accessory structures (e.g., sheds) ≤200 sq ft.
Code reference
Fences ≤7 ft high; retaining walls ≤4 ft high (measured from bottom of footing).
Code reference
Prefabricated swimming pools <24 inches deep.
Code reference
Window awnings projecting ≤54 inches.
Code reference
Decks ≤200 sq ft, ≤30 inches above grade, and not attached to the dwelling.
Use tax (not collapsed into a single rate)
City of Centennial Use Tax of 2.5% applied to the actual cost of materials, plus Arapahoe County Use Tax of 0.25% applied to the actual cost of materials.

Codes are amended regularly — verify current requirements with City of Centennial — Building Division.

Energy Code

Centennial energy code quick facts

Code reference
Centennial, Colorado, has adopted the 2018 IECC (with the 2021 I-Codes package) as its energy code, with no mention of Denver-specific overlays such as the Denver Green Code or Energize Denver.
Code reference
This is enforced by the City’s Building Division under Ordinance No. 2023-O-06 (adopting the referenced codes by reference, effective as part of the 2021/2023 code update package).Ord. No. 2023-O-06
Code reference
Centennial is in Climate Zone 5B.
Code reference
The code applies to alterations, additions, and remodels per IECC Chapter 5 (existing buildings), with the prescriptive requirements of Chapter 4 (or equivalent U-factor/UA paths) generally applying to new or modified portions of the thermal envelope.
Code reference
Key prescriptive requirements relevant to remodels/additions (drawn from 2018 IECC Table R402.1.2 and related sections for CZ 5; these are the base code values with no local amendments identified that alter them):
Ceiling/attic insulation
Minimum R-49 (or equivalent U-factor ≤ 0.026).
Adopting reference
2018 IECC R402.1.2 (Table R402.1.2).
Wood-frame wall insulation
R-20 cavity or R-13 cavity + R-5 continuous insulation (or equivalent U-factor ≤ 0.060).
Ord. No. 2023-O-06Source: centennialco.gov

Codes are amended regularly — verify current requirements with City of Centennial — Building Division.

text

What this covers

Resin floor or wall coatings over concrete or a prepared slab. Prep (grind, crack fill, moisture check) drives whether the coating will stay down.

text

How the work is coordinated

Cure time depends on product and temperature; no invented mil-thickness brands. Denver-metro work is permitted locally. Colorado has no statewide general-contractor license. Cities and counties license general contractors. DORA licenses electrical and plumbing (and similar regulated trades), not general contractors. Autotelic is a municipally licensed Denver general contractor that coordinates licensed specialty trades. Denver building permits run through Community Planning and Development (CPD). Costs are project-specific; no dollar figures.

FAQ

Common questions

How much does Site visit and written estimate cost in Centennial?

$149.

How do I book?

Press Book next to the job, pick a date and a morning (8–12) or afternoon (12–4) window, and pay in full. We confirm within 24 hours or refund you in full.

Who handles the epoxy coatings permits and licensing?

A municipally licensed Denver general contractor coordinates licensed specialty trades. Colorado has no statewide general-contractor license; cities and counties license general contractors. DORA licenses electrical and plumbing, not general contractors.

What is typically in scope for epoxy coatings in Denver?

Resin floor or wall coatings over concrete or a prepared slab.

When do you need drawings or a permit?

Anything that changes structure, occupancy, or regulated electrical or plumbing usually needs a local permit. Denver building permits are reviewed by Community Planning and Development. Confirm the exact trigger with CPD for the address.

Service Area

Serving Centennial and Arapahoe County

We serve Centennial, CO and all surrounding Denver metro communities. Our team is based in Denver and operates throughout the Front Range, from Castle Rock to Longmont and everywhere in between. Contact us for a free estimate on your Centennial project.

How It Runs

01

Survey

02

Design

03

Build

04

Verify

DESIGN SERVICES

CONSTRUCTION

TECHNOLOGY

Free Estimate

Get a free epoxy coatings estimate in Centennial

Tell us about your Centennial project — we respond fast, and estimates are always free.

Name, phone, and email required.

Verifying you're human…